MAINTENANCE, REPAIRING, REPLACING FAULTY COMPONENTS LUBRICATION COMPONENTS USING FORCE FEED, AND GRAVITY FEED, ALIGNMENT OF MECHANICAL DRIVES
PIPE FITTER
MURRAY & ROBERTS
01.2013 - 01.2014
INSTALLING NEW ECONOMISER, SLING TUBE, INSTALLING REHEATER, SUPER HEATER AND SCREEN TUBE
PIPE FITTER
MLS ENG
07.2012 - 12.2012
PIPE FITTER
STEINMULLER ENG
08.2011 - 11.2011
PIPE FITTER
BABCOCK
01.2011 - 05.2011
STRAP THE OLD ECONOMISER, INSTALLING NEW ECONOMISER AND INSTALL NEW SUITBLOWER LINE
PIPE FITTER
BACKCOCK ENG
01.2010 - 06.2010
CUTTING DAMAGED TUBES, FROM SUPER HEATER AND RE-HEATER HEADER, LEFT AND RIGHT MAIN STEAM AND PREPARE TO INSTALL NEW PIPES
PIPE FITTER
BABCOCK ENG
08.2009 - 11.2009
CUTTING EXISTING PIPE LEFT HAND SIDE FROM TURBINE LEG TO BOILER LEG ON TERMINAL POINT. CUT OLD WELDING, AND INSTALL STAINLESS STEEL PIPES INSIDE THE BOILER
PIPE FITTER
BABCOCK ENG
01.2008 - 04.2009
TUBE, PRIMARY SUPERHEATER AND PRIMARY RE-HEATER REFURBISHMENT AND RE-INSTALL, STRAPPING DAMAGED STEAM PIPES AND INSTALLING NEW ONES AT THE 74 M LEVEL