Summary
Overview
Work history
Education
Skills
Languages
References
Courses
Timeline
Generic
VICTOR MXOLISWA MABUZA

VICTOR MXOLISWA MABUZA

Komatipoort,Mpumalanga

Summary

Experienced professional with a strong foundation in project management and hydraulic systems, demonstrating expertise in pipe threading, cutting, and corrosion analysis. Proficient in flange assembly and valve installation, with a proven track record in boilers maintenance and the use of power tools. Adept at utilising MS Office 2010 for efficient documentation and reporting. Committed to advancing technical skills and contributing to innovative solutions within the engineering sector.

Multi-skilled [Job Title] with experience preparing and manipulating varied materials to tight tolerances for high-quality results. Prepares and fits pipes according to engineering blueprints for safe, functional systems. Works quickly and accurately to meet productivity targets.

Overview

20
20
years of professional experience

Work history

Pipe Fitter

Babcock Eng
2025.09 - 2026.03
  • Used power tools adeptly during installation and repair processes, ensuring precise workmanship.
  • Managed inventory of pipefitting supplies effectively, reducing waste and excess costs.
  • Installed piping systems for improved efficiency in industrial projects.
  • Ensured smooth operations with regular maintenance of pipe systems.

Construction Supervisor

Murray & Roberts, Medupi Power Station
2023.11 - 2024.01
  • Structural modification

Mechanical Supervisor

Murray Roberts, Air Liquide Project
2023.01 - 2023.01
  • Led a team of mechanics, fostering an environment of cooperation and skill development.
  • Provided training for new staff members to support their integration into the team.
  • Monitored mechanical operations with keen attention to detail, ensuring optimal performance.
  • Streamlined processes to improve overall operational efficiency in the workshop.

Mechanical Foreman

Murray & Roberts, Air Liquide Project
2022.01 - 2022.01
  • Installation, aligning
  • Installation of blank flanges
  • Deconnection of argon pipes and oxygen pipes
  • Replacing, repairing, installed motor and gearbox

Construction Supervisor

Murray & Roberts, Kusile Power Station
2021.01 - 2021.01
  • Modification of PJFF
  • Installation of channel guide support
  • Installation of rectifiers
  • Installation of guide plate
  • Installation of erosion protection plate
  • Installation of kicker plate on hopper

Supervisor

Murray & Roberts, Kusile Power Station
2019.01 - 2020.01
  • Modification on rotor 1 and 2
  • Installation motors and gearbox
  • Installation of pin racks and align new ones
  • Installation of sootblowers and motors

Acting Supervisor (Finishing Department)

Murray & Roberts, Kusile Power Station
2017.09 - 2018.12
  • Unit 6 installing heat flux sensors
  • Installing CO2 sensors
  • Installing site fire boxes on rear and front wall
  • Unit 3 maintenance

Ducting Foreman

Murray & Roberts, Kusile Power Station
2017.06 - 2017.08
  • Joining component 11 to 15

Mechanical Fitter

Murray Roberts, Kusile Power Station
2015.01 - 2015.01
  • Maintenance, repairing, replacing faulty components lubrication components using force feed, and gravity feed, alignment of mechanical drives
  • System 7.2 consolidation of delta wings
  • Installing delta wings mixers
  • Installing of pipe line to delta wings : system 1.4
  • Joining ductings together
  • Installing plates

Pipe Fitter

Murray & Roberts, Kusile Power Station
2013.01 - 2014.01
  • Installing new economiser, sling tube, installing reheater, super heater and screen tube

Pipe Fitter

MLS Eng, Sappi Ngodwane
2012.07 - 2012.12
  • Adapted quickly to changing project specifications, ensuring timely completion without compromising quality standards.
  • Repaired damaged pipes, restoring optimal system functionality.
  • Assembled pipes using welding equipment, guaranteeing secure connections for long-term usage.
  • Read blueprints accurately for successful execution of complex piping layouts.

Pipe Fitter

Steinmuller Eng(Malalavule), Kriel Power Station
2011.08 - 2011.11
  • Ensured smooth operations with regular maintenance of pipe systems.
  • Adapted quickly to changing project specifications, ensuring timely completion without compromising quality standards.
  • Eliminated potential hazards through diligent inspection of work areas prior to start of tasks.
  • Collaborated with construction teams to complete large-scale projects on schedule.

Pipe Fitter

Backcock Eng, Grootvlei Power Station
2010.01 - 2011.08
  • Cutting damaged tubes, from super heater and re-heater header, left and right main steam and prepare to install new pipes

Pipe Fitter

Babcock, Sappi Ngodwane
2011.01 - 2011.05
  • Strap the old economiser, installing new economiser and install new suitblower line

Pipe Fitter

Babcock Eng, Kendal Power Station
2009.01 - 2009.12
  • Cutting existing pipe left hand side from turbine leg to boiler leg on terminal point. Cut old welding, and install stainless steel pipes inside the boiler

Pipe Fitter

Babcock Eng, Matla Power Station
2008.01 - 2008.05
  • Tube, primary superheater and primary re-heater refurbishment and re-install, strapping damaged steam pipes and installing new ones at the 74 m level

Semi-Skilled Pipe Fitter

Wetback Eng, Komati Power Station
2006.01 - 2007.12
  • Installing new pumps and new pipes
  • Performed precision cutting of pipes to meet project requirements.

Education

Grade 12 (Matric) - Siswati, English, Afrikaans, Economics Accounting, Business Economics, Commercial Mathematics

Lubombo Secondary School

Pipe Fitting - Drawing, Preparation and Fabrication

Lapace Training Centre

Production and Supervision - undefined

Centurion Academy (Witbank)

Fundamentals of MS Office 2010 - undefined

Centurion Academy (Witbank)

Pipe Fitting - undefined

EBS Training Centre

HIRA - undefined

OHS Academy (Witbank)

N3 - Mechanical Engineering, Supervisor Management, Mathematics, Engineering Science

Sandringham Technical College (Pretoria), Pretoria
Pretoria

N4 - Supervisory Management, MechanoTechnics, Mechanical, Mathematics

Sandton Technical College (Pretoria), Pretoria
Pretoria

Fundamentals of Project Management - undefined

Centurion Academy (Witbank)

N5 - Supervisor Management, Strength of Materials and Structures, Power Machines, Engineering Physics

Tzaneen Technical College

Mechanical Fitter - undefined

Kavod Holding and Projects

Certificate of Higher Education -

Alison

Certificate of Higher Education -

Alison

Certificate of Higher Education -

Kavod Camps B
Emalahleni

Skills

  • MS Office 2010
  • Fundamentals of Project Management
  • Hydraulic systems experience
  • Pipe threading mastery
  • Pipe cutting and threading
  • Corrosion analysis
  • Flange assembly competence
  • Use of power tools
  • Boilers maintenance
  • Valve installation

Languages

Siswati
English
Zulu

References

  • Frenny, Simelane, Murray and Roberts SHEQ Officer, 068 060 7921, Murray and Roberts
  • S., Motha, Heat Treatment Manager (MRPE), 076 099 0666, MRPE
  • Andries, Kotze, Murray and Roberts Site Manager, 084 556 2022, Murray and Roberts

Courses

Safety Management in Construction 2025

Timeline

Pipe Fitter

Babcock Eng
2025.09 - 2026.03

Construction Supervisor

Murray & Roberts, Medupi Power Station
2023.11 - 2024.01

Mechanical Supervisor

Murray Roberts, Air Liquide Project
2023.01 - 2023.01

Mechanical Foreman

Murray & Roberts, Air Liquide Project
2022.01 - 2022.01

Construction Supervisor

Murray & Roberts, Kusile Power Station
2021.01 - 2021.01

Supervisor

Murray & Roberts, Kusile Power Station
2019.01 - 2020.01

Acting Supervisor (Finishing Department)

Murray & Roberts, Kusile Power Station
2017.09 - 2018.12

Ducting Foreman

Murray & Roberts, Kusile Power Station
2017.06 - 2017.08

Mechanical Fitter

Murray Roberts, Kusile Power Station
2015.01 - 2015.01

Pipe Fitter

Murray & Roberts, Kusile Power Station
2013.01 - 2014.01

Pipe Fitter

MLS Eng, Sappi Ngodwane
2012.07 - 2012.12

Pipe Fitter

Steinmuller Eng(Malalavule), Kriel Power Station
2011.08 - 2011.11

Pipe Fitter

Babcock, Sappi Ngodwane
2011.01 - 2011.05

Pipe Fitter

Backcock Eng, Grootvlei Power Station
2010.01 - 2011.08

Pipe Fitter

Babcock Eng, Kendal Power Station
2009.01 - 2009.12

Pipe Fitter

Babcock Eng, Matla Power Station
2008.01 - 2008.05

Semi-Skilled Pipe Fitter

Wetback Eng, Komati Power Station
2006.01 - 2007.12

Production and Supervision - undefined

Centurion Academy (Witbank)

Fundamentals of MS Office 2010 - undefined

Centurion Academy (Witbank)

Pipe Fitting - undefined

EBS Training Centre

HIRA - undefined

OHS Academy (Witbank)

N3 - Mechanical Engineering, Supervisor Management, Mathematics, Engineering Science

Sandringham Technical College (Pretoria), Pretoria

N4 - Supervisory Management, MechanoTechnics, Mechanical, Mathematics

Sandton Technical College (Pretoria), Pretoria

Fundamentals of Project Management - undefined

Centurion Academy (Witbank)

N5 - Supervisor Management, Strength of Materials and Structures, Power Machines, Engineering Physics

Tzaneen Technical College

Mechanical Fitter - undefined

Kavod Holding and Projects

Grade 12 (Matric) - Siswati, English, Afrikaans, Economics Accounting, Business Economics, Commercial Mathematics

Lubombo Secondary School

Pipe Fitting - Drawing, Preparation and Fabrication

Lapace Training Centre

Certificate of Higher Education -

Alison

Certificate of Higher Education -

Alison

Certificate of Higher Education -

Kavod Camps B
VICTOR MXOLISWA MABUZA