Detail-oriented team contributor with exceptional organizational skills and a proven track record of managing multiple projects simultaneously while maintaining a high level of accuracy. Adept at prioritizing tasks effectively to meet tight deadlines and ensuring that all objectives are achieved without compromising quality. Committed to fostering collaboration and driving results within a dynamic team environment. Passionate about leveraging strong problem-solving abilities to contribute to organizational success.
Overview
21
21
years of professional experience
4
4
Languages
Work History
Public Participation and Social Facilitator (Stakeholder Engagement)
Mbofoho Consulting and Project Managers
01.2008 - Current
Public Participation and Stakeholder Engagement
Social Impact Assessment
Social Facilitation
Negotiations
Community Mobilisation and Liaison
Formation of Project Steering Committees
Capacity building for Project Steering committee members and Community Liaison Officers
Involved in Stakeholder Engagement and Public Participation for the following projects:
Involved in the stakeholder engagement for the Resettlement Action Plan for Swazi Rail link Project, Transnet SOC Ltd (Mpumalanga)
Involved in the stakeholder engagement and monitoring Resettlement Action Plan for Neptune-Poseidon 400 kV Power line for Eskom Holdings SOC Ltd (East London – Eastern Cape)
Conducted Public Participation Process for the proposed construction 2x16km 132kv power line running parallel from Borothu MTS to the existing Pprust North substation within the jurisdiction of Mogalakwena local Municipality, Waterberg district, Limpopo Province
Public Participation for amendment of Environmental Authorisation and Environmental Management Programme for the provision of landside structures and infrastructure to the Bulk Liquid Storage and handling facility at the Port of Ngqura for Transnet SOC Ltd
Public Participation for Vondo Refurbishment and Transfer RWS-Mukumbani, Radali, Tshivhungululu, Tshilafene, Gondeni/Lunungwi and Ngwenani/Mavhola, Vhembe District
Social Facilitation as the lead Facilitator for the Roads Agency Limpopo:
Social Facilitation for the flood damage of road P20/2: Replacement of bridge 346 over Crocodile river in the Waterberg District of Limpopo province
Social Facilitation for the Maintenances of road P169/2, from Steelpoort (from Road P169/1 and D212) to Road P33/2, in the Sekhukhune District of Limpopo
Social Facilitation for Regravelling of road D4230 through Leolo Mountain (through Soupina) within Makhuduthamaga Municipality
Conducted Social Facilitation for the Rehabilitation of road D3812 from Hluphekani to Homu 14b/ Homu 14a to Mapayeni, in the Mopani District of Limpopo
Social Facilitation for Maintenance of Road P62/2 from Monsterlus to Mathulastands to Keerom to Zaaiplaats in the Sekhukhune District of Limpopo Province
Social Facilitation for Maintenance of the Road D3612 from Lebowakgomo to Groothoek/Zebediela within Lepelle-Nkumpi Local Municipality
Social Facilitation for the Upgrading (From Gravel To Tar) of the Road D3512 between Mabuladihlari and Ga-Mosidi In The Waterberg District Municipality
Social Facilitation for Repair, Reseal and Fogspray of Road D1356 from Matoks to Soekmekaar in the Capricorn District of Limpopo Province
Social Facilitation for Maintanance of Road P116/1 from Hoedspruit to Blyde River and Road D1185 from Hoedspruit to Kampersrus in the Mopani District of Limpopo Province
Social Facilitation for Maintenance of Road D192 from P19/1 to Kgopeung to Makekeng, in the Waterberg District of Limpopo
Social Facilitation for Upgrading of Makonde Access Road in Thulamela Municipality within Vhembe District Municipality of Limpopo Province
Social Facilitation projects as a lead facilitator for the Department of Roads and Transport:
Social and Institutional Development Service (SID) for the maintenance of Road P85/2 from N11 Marblehall to Kromdraai to Settlers in Mookgophong and Bela-Bela Municipalities
Social and Institutional Development Services (SID) for Prevention Maintenance of Roads Mashatamothane (R37) to Bothashoek to Praktisser in Greater Tubatse Municipality
Conducted Social Facilitation for the Upgrading of 5.10km gravel access road D3892 to Gon’on’o village (phase 2) in the Mopani District of Limpopo Province
Social Facilitation for the Upgrading of 1,5km access road from road D1200 to Mohodi Clinic within Capricorn District of Limpopo Province
Social Facilitation for the Upgrading of 2km access road from Ipopeng Taxi rank to Setumong village within Capricorn District of Limpopo Province
Social Facilitation projects as a lead facilitator for Municipalities Projects:
Social and Institutional Development Service (SID) for the upgrading of Bela-Bela streets Paving Phase 3B and Sports Ground for Bela-Bela Municipality
Built rapport with diverse groups of stakeholders by demonstrating empathy, active listening skills, and cultural competence during facilitated sessions.
Promoted continuous learning within the organization by sharing best practices and lessons learned from various facilitation experiences.
Fostered collaborative environment, encouraging open dialogue and shared experiences among participants.
Facilitator/ Senior Researcher
Wa Hadzhi Project Managers
Polokwane
01.2006 - 01.2008
Project Management and Research
Projects Facilitation and Monitoring
Training Material Development
Presentation and Report Writing
Customer Care
Conducting Research and verification for Batlokwa ba Mogodumo: Research and verification Project for the Department of Land Affairs Capricorn District in Limpopo
Involved in the Public Participation Process and stakeholder engagement for Luvuvhu-Letaba WMA Public Participation Process Department of water and Sanitation
Project Steering Committee and CLO training for the upgrading from gravel to tar from Shakadza to Muswodi in the Vhembe District in Limpopo Province
Enhanced team productivity by leading engaging training sessions focused on effective communication strategies.
Delivered high-quality training sessions (CLO & PSC), ensuring participants developed a thorough understanding of the subject matter.
Site Co-ordinator
National Prosecuting Authority
01.2005 - 01.2006
Ensuring effective and efficient service delivery
Coordinating the provision of services at the centre
Identify resources needed and challenges faced at site and make recommendations
Keep and manage a database of cases
Analysis of monthly statistics
Identify needs and Collaborate in planning and execution of public awareness campaigns
Provide support to survivors
Coordinate implementation meetings
Liaise with partners to deal with challenges at the hospital site
Coordinate visits by external stakeholders
Monitoring the adherence to the blueprint by role-players
Supervised crew of over 7 employees.
Enhanced team coordination by organizing weekly meetings to discuss project progress and address any challenges.
Maintained a safe and productive work environment by enforcing strict adherence to safety guidelines and the center's blue print.
Education
Masters - Social Impact Assessment and Advanced Social Research
Civil Engineering Technologist at Hekima Projects CC Consulting Engineers and Project ManagersCivil Engineering Technologist at Hekima Projects CC Consulting Engineers and Project Managers