Overseeing the effective operation of a Continuous Casting Machine and Slabgrinding section in terms of Production and SHEQ for the past 4 years., Responsible for the cost, quality, throughput and contractual requirements for 3 independent thermal coal operational sites as primary contractor for their fines beneficiation and dewatering processes., Overseeing 3 operational contracts for 3 years in terms of Production and SHEQ., Overseeing the operational startup of 3 additional operational contracts., Overseeing day to day operation of coal flotation and filtration sites for Anglo American Thermal Coal for 3 years., Implementation of an Operational Management System (OMS) for Anglo American Thermal Coal sites for flotation and filtration plants – maintained 100% compliance for all client conducted audits., Responsible for the management of an operational site for 3 years as Site Manager., Active mentor for candidate engineers, production trainees and learner steel makers for the last 4 years., Vast spectrum of technical experience in hydrometallurgy, pyrometallurgy, extractive metallurgy, coal beneficiation and solids separation., Part of the development team that diversified the product portfolio of strictly Stainless steel to now include Carbon steel, Superalloys and potentially Electrical steel., Experience in heat extraction and casting defect detection during Continuous Casting., Implementation of quality intervention programs through investigation, fault finding and action implementation., Implementation of protection system to detect and prevent breakout occurrences during the continuous casting process (Reduction of occurrences from on average 10 per year to only 2 in 2022 to Zero breakouts in 2023 currently)., Experience in the fields of process engineering, research, process design, ore preparation, extractive metallurgy, hydrometallurgy and coal processing., Extensive experience in the field of flotation and filtration – responsible for the commissioning, optimisation and continuous running of 3 coal flotation and filtration plant, 6 coal filtration sites and 1 platinum tailings filtration plants., Responsible for reducing client environmental impact of coal slimes disposal through ensuring effective material dewatering for disposal onto dry storage facilities., Part of evaluation team for the implementation of SO2 dry scrubbing circuit for the desulphurisation of kiln off gas – production of a viable product that can be reused in the process while reducing the volume of acidic scrubber sludge that needs to be disposed., Part of the evaluation team for the implementation of wet scrubbing circuit for ammonia removal from ammonium-metavanadate oxidation oven off gas., Optimisation of coal flotation circuits to ensure maximal coal fine retention – maximising saleable product in conjunction with a significant reduction in slimes disposal volumes., Commissioning of plants and unit processes (Cold & Hot commissioning, identifying possible problems, operational training, monitoring and continual improvement)., Design, procurement and installation of pump and piping systems (material selection, pipe sizing, technical specifications, generating process flow diagrams (PFD’s)., Generating piping and instrumentation diagrams (P&ID’s), pump design, sourcing quotes, supervising installations and also approval of work performed., Design and cost evaluation of scrubber water supply system (material selection, corrosion protection recommendation, pipe and pump requirement calculation, specification of auxiliaries, generating drawings, tender adjudication, capital application documentation)., Plant assessments (investigating process bottlenecks, mass balances, energy balances, consult with suppliers, investigate and implement solutions)., Laboratory experimentation (problem identification, experimental design, execution of experiments, interpretation of results, report writing)., Improve / upgrade process equipment (assess current condition, sourcing quotes, supervise refurbishment and installation)., Plant auditing and benchmarking., Plant monitoring (Scrutinizing production throughput and analysis to identify process deviations)., Design & Feasibility studies., Feasibility studies for electromagnetic stirring system for slab casting facility in order to improve cast structure and through structure element homogenisation., Headed a project for the upgrade of the water reticulation of a leaching circuit. This involved the upgrade of existing storage facilities and the installation of additional transfer pumps and pipelines., Involved in the design, procurement, installation and commissioning of an Acid and Caustic Storage facility., Involved in procurement, installation and commissioning of an upgrade on a desulphurisation scrubber system. Responsible for the sizing and material selection of pumps and the scrubber venturi supply water pipelines., Involved in the final construction and punch listing of three flotation and filtration facilities for final handover., Involved in the final construction and punch listing of six filtration facilities for final handover., Highly developed oral and written communication skills – report writing, presentations etc., Ensuring alignment between departments through optimisation meetings, weekly communication updates and monthly performance feedback., Creative and innovative individual – able to think outside the box., Leading of 5 Why and brainstorming sessions., Promoting continuous improvement initiatives from all personnel., Able to work well in team orientated projects while still being highly self-motivated., Thrives on new challenges., Passion for coaching (Mentoring new personnel / sponsor student trainee’s).