Dynamic SMPP Estimator with extensive experience at Grinaker-LTA, adept at BOQ preparation and tender compilation. Proven ability to analyze RFQs and deliver competitive proposals, enhancing project profitability. Skilled in labor calculations (norms) and subcontractor pricing, complemented by strong communication and collaboration skills to drive successful project outcomes.
• To interpret the Clients specification requirements (RFQ, Drawings & Specification) and produce a well-developed proposal, which conforms to the Clients requirements and offers the Company the best opportunity to deliver a quality product to the Client within the estimated cost/profit structure.
• Go out for Pricing to Subcontractors if Material is not free issue Prepare Take-Offs if required (piping Isometrics)
• Split BOQ’s by Extracting Sub Trades and Listing Sundry materials required.
• Complete the man-hour content on the Bill of Quantity items and the hourly rates base on the year of execution.
• Complete the P&G (Fixed, Time & Value Related) requirements. Prepare Tender Documents to be Submitted to Clients.
• Liaising with commercial and Risk analysis department. Submission of Tenders to client.
• To interpret the Clients specification requirements (RFQ, Drawings & Specification) and produce a well-developed proposal, which conforms to the Clients requirements and offers the Company the best opportunity to deliver a quality product to the Client within the estimated cost/profit structure.
• Go out for Pricing to Subcontractors if Material is not free issue Prepare Take-Offs if required (piping Isometrics)
• Split BOQ’s by Extracting Sub Trades and Listing Sundry materials required.
• Complete the man-hour content on the Bill of Quantity items and the hourly rates base on the year of execution.
• Complete the P&G (Fixed, Time & Value Related) requirements. Prepare Tender Documents to be Submitted to Clients.
• Prepare Exco presentation for Executive Approval meetings. Attending Exco meeting to present Pricing.
• Liaising with commercial and Risk analysis department. Submission of Tenders to client.
• Split BOQ’s by Extracting Sub Trades and Listing Sundry materials required.
• Calculate and Populate hours according to company Norms into each items in BOQ
• Prepare BOQ for Task/Estimate and Capture BOQ to Programme Go out for Pricing to Subcontractors if Material is not free issue Prepare Take-Offs if required
• Prepare Tender Documents to be Submitted to Clients Attending Exco meeting to present Pricing
• Liaising with commercial and Risk analysis department Submission of Tenders to client.
• Split BOQ’s by Extracting Sub Trades and Listing Sundry materials required.
• Calculate and Populate hours according to company Norms into each items in BOQ
• Prepare BOQ for Task and Capture BOQ to Programme Acknowledge receipt of addenda and distribute to Estimators and other relevant departments (Procurement, Planning, Commercials etc.)
• Incorporate Addenda into BOQ as Required
• Items Priced by Estimators to be transported to Client’s BOQ in Excel
• Prepare Take-Offs if required
• Prepare Tender Documents to be Submitted to Clients
• Prepare take-off for Piping Isometrics
• Price material accordingly
• Prepare presentation to management of the pricing Prepare Tender
• Documents to be Submitted to Clients
• Preparation of BOQ by splitting the bills for Quotation (subcontractors) as per the Enquiry
• Issue of RFQ’s to relevant suppliers (BOQ and Data sheets included) and constant Communication with suppliers to ensure accurate pricing
• Accurate Adjudication of enquiry Documents received from suppliers and ensuring All items in the bill(s) have been priced if not further enquiries for prices to suppliers Are done
• Capturing of risk analysis based on the Technical and commercial aspects of the enquiry document as assessed by the senior Estimator (Cura)
• Assist in the Preparation of EXCO documents
• Compiling of Tender documents for Submissions for SMEIP which includes commercial documents, Safety documents, CV’s, Histograms, Certificates etc.
• Drawings take-offs for the preparation of BOQ’s for pricing
-From :-Piping Isometrics
-Structural GA’s
-Plate workGA’s
• Preparation and compiling of work instructions documents (Quality Control)
• Administration of welding documentation Data Capturing
• Scanning of Documents at the end of each project for client submission
SMPP Scope Understanding (Structural, Mechanical, Piping, Platework)
BOQ Preparation (Bills of Quantities)
Take-offs from Isometrics
Tender Compilation & Cost Estimation
Labour & Man-hour Calculations
Pricing of Subcontractor Packages
Knowledge of RFQ & Specification Analysis
Excel
Relevant Clients and Engineering Companies tendered for
· Anglo American
· Hatch
· Fluor
· Impala Platinum
· Zimplats
· Worley Parson
· Sasol Refinery
· Total Energies
· Astron Energy
· Air Liquide
· Megchem
· PCC (Professional Cost Consultants)
· DRA
· Exxaro
· Tronnox
· Acerlormittal
· COENG
· ESKOM
· Randwater
· Seriti
· Engen Refinery
· South32
· Lycopodium