Summary
Overview
Work History
Education
Skills
Timeline
Generic

Xolo Pitso

Senior Technician
Durban

Summary

Previous Projects:

P255 Upgrading of Inanda Road for KZN DOT (7km) 2011 to 2015 (240M)

P50/2 for KZN DOT - contract administration (13.5km) 2010 to 2012 (101M)

P416 Mzimkhulu for KZN DOT (1.5km) 2010 to 2012 (64M)

Chota Motala – N3 Highway and I/C Upgrade for SANRAL (3.2km) 2009 to 2012 (400M)

St Barnabas Hospital to Hluleka for E/Cape Provincial Government (42km), 2009 to 2011 (+-300M)

Brooksnek to Ngcweleni River (N2) for SANRAL (30km), 2008 to 2010 (350M)

Marian Ridge Housing Units Upgrade for Ethekwini Municipality 2007 to 2008 (5M)

Empangeni to Mpumalanga Border (N2) Hluhluwe to Mozambique Border (R22) Routine Road Maintenance (+- 400 km), 2001 to 2010 (26M)

Victoria Street Upgrade for Ethekwini Municipality 2000 to 2000 (R480 000)

Mdloti to Hibberdene (N2) EB Cloete to Cedara (N3) Routine Road Maintenance (+- 400 km) 1997 to 2000 (27M)

Intersite Property Management – Relocation of Coal Site, Springfield Business Park 1996 to 1996 (2M)

Overview

19
19
years of professional experience

Work History

Senior Technician

Iliso Consulting
Durban
04.2004 - 03.2016
  • Site Investigations during project design stages
  • Local communities presentations together with other stakeholders as representatives of the client of earmarked road section
  • Horizontal and vertical alignment and configuration of carriageways including setting out data for construction
  • Inspecting and recording existing services to be relocated
  • Pavement assessment failures
  • Supported design office team on drainage design changes on site
  • Inspecting existing drainage to merge existing with new drainage design
  • Verification of design levels and signing off each layer completed
  • Visual site inspection of completed work and work in progress
  • Engagement with various departments and stakeholders discussing new design and relocation of services cost implication of new services wayleaves
  • Earthworks up to G10 level and layer-works construction
  • Ensuring material samples are taken to soil testing laboratory for testing to obtain Mod and OMC
  • Raw and processed C3 are taken to investigate cement content, UCS and ITS
  • Calculation of cement bags and spacings as well as physical counting the actual number of cement bags on site for layer stabilization
  • Ensuring pull overlap during milling recycling
  • UCS and ITS results must meet COLTO specification table 3402/5 stabilization content results, coefficient of variation should not exceed 30% as per COLTO specification series 3500-6
  • Moisture content should not exceed 80% OMC as described in sub-clause (d) 3500-2 and PI shall not exceed 6 as per table 3402/5
  • Bridge slump test - mold sampling of concrete cubes compacted and not to be disturbed or be moved until next day, 7 days cubes and must exceed 60% - 75% of strength and rest crushed at 28 days.
  • Wet/dry durability test takes approximately 36 days but interim results can be viewed before test is completed to check if material being tested will meet durability specification as per table 3402, shall comply with table 3402/3
  • Asphalt preparation before applying prime – stable 60, examine moisture content before priming sub-base, backscatter method is applied or 50mm depth sample is taken to laboratory to determine actual moisture of which moisture content should be in the region of 4.5% or 5% for sub-base to allow prime penetration and prime should at least be 10mm or above in penetration.
  • Tack coat (50% water and 50% stable 60) application rate calculated to determine drums required for a particular section as per TRH3
  • Asphalt mix temperature from trucks on arrival should be 160 -140 degrees Celsius before is loaded in the paver – paving temperature shall be 120 degrees Celsius.
  • Paving should start bottom-up on a longitudinal grade and on supers paving should start from the lower side to higher side
  • Surface irregularities – a 3m straight edge and a rolling straight edge tests are done for smooth rideability as per COLTO 4200-17
  • Random coring, except in circumstances where there is segregation, poor joint or exceeding design thickness for newly laid sphalt test results of Bitumen content, voids content and ITS
  • Flow cone grout test series 8100-17 as per COLTO, after the post-tensioning of precast bridge beams
  • Steel inspection spacings, cover and number of steel bars as shown on drawings, spacer blocks with formwork horizontally and vertically firmly into position
  • Visits to borrow pits and quarry sites to control materials imported to site
  • Monitoring densities and signing off test results of passed sections
  • DCP test, quick test to check CBR in foundations and layers
  • Benching of road widening between existing layer-works and new fill layers to prevent shear crack along the road as described in sub-clause 3307(d)
  • For selected layers, highest PI should be 12
  • Issue site instructions
  • General Snag list
  • Strengthened communication skills through regular interactions with others.
  • Tender opening and adjudication selection of recommended stage ones sub-contractors
  • DOT EPWP reporting monthly cashflow.
  • Monthly payment certificate

Junior Technician

Iliso Consulting
Durban
11.2001 - 11.2004

Engineer's conditional report data collection on site:

  • Cut and fill sections for vegetation maintenance
  • Road Reserve measurements fence to fence
  • Existing guard rails and sign boards
  • Existing overhead and bypass structures including bridges
  • Existing drainage – stormwater v drains and channels, down chutes, inlets and outlets, earth drainage, subsoil drainage
  • Existing interchanges and intersections
  • Existing trucks arrestor beds
  • Existing retaining structures
  • Existing laybys
  • Issue job instructions
  • Monthly payment certificate including calculating CPA for each subcontractor and target to meet monthly expenditure

Trainee Technician

Maxplan Civil Engineers
Durban
11.1997 - 11.2001
  • Installation of bulk 1500 diameter stormwater pipes
  • Site inspection of all tasks on site
  • Site office administration
  • Measurements on site together with the quantity surveyor and countersign for measured work for payment certificate
  • Updating project progress by hand on drawings as requested by RE
  • Filing site correspondence
  • Site investigations of fire hydrants, water mains and valves for new connections
  • Railway and roadway construction layers
  • Paving G-blocks laid on 20mm sand bed on top of G2 crusher run base
  • Barrier drainage concrete wall shutters inspection before pouring concrete
  • Supervision of asphalt paving
  • Mdloti to Hibberdene (N2) EB Cloete to Cedara (N3) Routine Road Maintenance inspections and road infrastructure data collection

Technical Coordinator

Ethusini Housing
Durban
10.1996 - 11.1997
  • Investigating bulk services of identified and earmarked sites for housing
  • Application of funding for bulk services installation
  • Visiting surveyor general office to obtain cadastral information of earmarked sites for settlement
  • Liaison with local authorities to inform them of housing development
  • Inspection of existing bulk services and apply for other services if site is partially serviced
  • Estimating cost of individual dwelling and cost of bulk services per dwelling

Education

Civil Studies

Swinton Technical College
Mobeni
05.2008

Short Course: Business Admin And Management

Damelin
Durban, South Africa
04.2001 -

Short Course:Project Management

Business Development Unit
DUT
2011

Skills

  • Quality Control

  • Maintenance and repairs

  • Cost Control

  • Cad

  • Microsoft office

  • Model Maker design

Timeline

Senior Technician

Iliso Consulting
04.2004 - 03.2016

Junior Technician

Iliso Consulting
11.2001 - 11.2004

Short Course: Business Admin And Management

Damelin
04.2001 -

Trainee Technician

Maxplan Civil Engineers
11.1997 - 11.2001

Technical Coordinator

Ethusini Housing
10.1996 - 11.1997

Civil Studies

Swinton Technical College

Short Course:Project Management

Business Development Unit
Xolo PitsoSenior Technician