Summary
Overview
Work History
Education
Skills
Accomplishments
Additional Information
Software
Interests
Timeline
Generic

Wayne Carter

Mechanical Engineer
Durban,KwaZulu Natal

Summary

Proficient Project Engineer with 14 years of experience driving over 65 projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget and according to specifications.

Furthermore, I am a detail-oriented, organized and meticulous employee who works at fast pace to meet tight deadlines. I am an enthusiastic team player who is ready to contribute to company success.

Overview

14
14
years of professional experience
4
4
years of post-secondary education
2
2
Languages

Work History

Project Engineer

PepsiCo
Durban, Kwa-Zulu Natal
03.2012 - 12.2021
  • Liaised with company executives and project managers to acquire resources to move projects forward.
  • Communicated with industrial equipment installers to deliver technical support throughout project execution.
  • Delivered regular compliance reports to drive process improvement and corrective measures.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Identified technical risks within managed projects.
  • Assessed impact of modification requests for ongoing projects.
  • Recommended process improvements to reduce unnecessary waste.
  • Maintained records for each project and engineering discipline.
  • Delivered concise instructions to technical team to maintain quality control.
  • Evaluated change order requests in response to out-of-scope work activities.
  • Monitored metrics during project execution to maintain compliance with planned costs.
  • Performed constructability reviews of construction bid documents for coordination purposes.
  • Reviewed contractor proposals and drawings prepared by firms to identify missing information and align budgets.
  • Recommended improvements for design, construction means and materials based on field or changing conditions.
  • Reviewed progress controls for project quality assurance.
  • Provided technical direction of system development methodologies to improve technical performance.
  • Planned and managed engineering projects and continuous improvement programs to reduce labor and costs.
  • Analyzed system development efforts using potential ROI and associated liability figures.
  • Assisted with cost proposal development and customer presentations.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Determined and scheduled priorities as required to progress engineering work.

Project Engineer

BHP Billiton
Richards Bay, Kwa-Zulu Natal
02.2008 - 02.2012
  • Cross-Functional Engineering project management and control following the Stage gate process
  • Heavy Industry specific design and execution of core projects
  • Delivered regular compliance reports to drive process improvement and corrective measures.
  • Ensured that the project was managed with rigorous Iron Triangle Methodology metrics
  • Identified technical risks within managed projects.
  • Completed and maintained Change Management documents for the full project lifecycle

Education

Bachelor of Science - Mechanical Engineering

University of Kwa-Zulu Natal
Durban
01.2004 - 12.2007

Skills

    Project estimation

Subcontracting management

Project forecasting

Regulatory compliance

Requests for information (RFIs)

Risk management

Technical analysis

Mechanical engineering

Civil engineering

Project management proficiency

Schematics understanding

Construction expertise

Budgeting

Production understanding

Accomplishments

    PEPSICO

  • PepsiCo Leadership Award 2013
  • PepsiCo Plant Start-up Award 2013
  • Cross-functional collaboration to ensure the successful building and handover of a Potato Crisp Manufacturing facility in Durban, South Africa
  • Achieved an effective Change Management Processed by designing and implementing a full Change Management Process for both the production and engineering teams
  • BHP Billiton

  • Engineering Recognition Certificate: Project Management Excellence (Casting of floor in the Cast house) - 2008
  • Lead the upgrade of liquid pitch tanks that resulted in early promotion (Accelerated by 6 months) in the BHP Billiton Group Graduate Program

Additional Information

PEPSICO PROJECTS

1. NEW POTATO CRISPS SNACK MANUFACTURING PLANT

(SIMBA & LAYS)

LAND PURCHASE

SELECTIVE DEMOLITION

BUILDING PERMITTING & ENVIRONMENTAL PERMITTING

CIVIL REMEDIATION WORKS FOR NEW PLANT

G20 SYNTHETIC NATURAL GAS LINE INSTALLATION

COMPRESSED AIR RING MAIN INSTALLATION

NITROGEN TANK FARM INSTALLATION

EQUIPMENT LOGISTICS/SHIPPING

VEGETABLE OIL RETICULATION SYSTEM

CLEAN-IN-PLACE AUTOMATED SYSTEM

PRESSURISED JET WASHER SYSTEM

PROCESS EQUIPMENT INSTALLATION – WET END (BINS/WASHER/PEELERS/SLICERS/FRYER)

PROCESS EQUIPMENT INSTALLATION – DRY END (BAG WEIGHERS/BAG MAKERS/ROBOTICS)

PLANT HANDOVER

2. DUCT MOUNTED HEATER FOR PACKAGING DE-HUMIDIFICATION

3. LABORATORY AUTOMATIC TITRATOR

4. VEGETABLE OIL TANK ACCESS PLATFORM

5. STAINLESS STEEL WASTE BINS

6. CHANGE OVER PARTS FOR ON MACHINE SEASONING

7. SPARE TUBES AND SHOULDERS

8. CALIBRATION CHECK EQUIPMENT

9. FRYER STAINLESS STEEL PLATFORM

10. CIP HOT WATER LINE CLADDING

11. DUCTED COOLING – POTATO BINS STORAGE

12. OPTYX RECIRCULATION LOOP

13. ADDITION OF A 6TH PACKAGING BAY

14. SHORT TERM 90T POTATO COLD STORE

15. PLANT-WIDE LIFELINES AND LADDERS INSTALLATION

16. MAIN INCOMER ACCESS GATE CONTRUCTION

17. 6000 m2 ROOFING & SIDE CLADDING REPLACEMENT

18. RAW MATERIALS STORE HVAC SYSTEM

19. SITE WIDE ELECTRICAL COMPLIANCE

20. DATE CODE LABELLER

21. CHECKWEIGHERS & GATEWAY PUSHERS

22. PELLET PRODUCTION LINE

BHP Billiton Projects

1. CASTHOUSE FLOOR REPLACEMENT OF VOLUME 85m3

2. BLOWER INVESTIGATION FOR REDUCTION POT COOLING

3. HEAT TRANSFER SYSTEM ANALYSIS – LIQUID PITCH TANKS

4. COMPRESSOR INLET DUCTING COOLING FOR EFFICIENCY IMPROVEMENTS

5. ANODE RECIPE ANALYSIS WITH OPTIMISATION

6. 300T PITCH TANK UPGRADES WITH HEAT TRANSFER SYSTEM UPGRADE

7. ELECTROSTATIC PRECIPITATOR UPGRADE

8. FIBRE OPTIC CABLE INSTALLATION BETWEEN HARBOUR/BAYSIDE/HILLSIDE

9. 53 CRANE LOAD CELLS WITH DISPLAY INSTALLATION

10. CRANE DUAL-MAST REPLACEMENT – ANODE CRANE

11. SINGLE GRAB ANODE MANIPULATION DEVICE

12. BAKE FURNACE REFRACTORY BRIDGES

13. 55m CONVEYOR GANTRY REPLACEMENT

Software

SAP

MICROSOFT - POWERPOINT -ADVANCED

MICROSOFT - WORD - ADVANCED

MICROSOFT - PROJECTS - ADVANCED

MICROSOFT - EXCEL - ADVANCED

AUTO-CAD

CRYPTOCURRENCY MINING - ETHEREUM

Interests

Hiking

Camping

Squash

Timeline

Project Engineer

PepsiCo
03.2012 - 12.2021

Project Engineer

BHP Billiton
02.2008 - 02.2012

Bachelor of Science - Mechanical Engineering

University of Kwa-Zulu Natal
01.2004 - 12.2007
Wayne CarterMechanical Engineer