Qualified electrician with14 years of experience managing complex electrical systems for industrial clients; recognized for leading projects valued at $1M while overseeing teams of up to15 professionals. Achieved recognition for developing streamlined installation procedures that reduced project completion time by an average of three weeks; implemented thorough training sessions enhancing compliance awareness among all team members.
▪ Conducted industrial machine breakdown responses, and equipment availability
enhancement, reducing downtime by 15%.
▪ Created systematic inspection protocols leading up to the overhaul process for aging equipment with specific focus areas yielding actionable insights concerning potential failure points affecting ten different facilities under supervision.
▪ Performed exhaustive inspections and rigorous tests on 20+ newly installed electrical installations that uncovered potential hazards prior to certification resulting in zero major incidents or faults reported within a year.
▪ Constructed and wired 30+ custom built control panels with high precision.
▪ Established rigorous quality control measures including daily site inspections and pre-emptive risk assessments which directly contributed towards maintaining optimal workplace conditions recognized as 'safe' by governing regulatory bodies during external evaluations.
▪ Coordinated communication strategies among engineering teams regarding resource allocation and scheduling needs for ongoing maintenance work—this effort saved approximately five hours per week spent resolving miscommunications related issues.
▪ Supervised the tracking and replenishment of essential spare parts stock exceeding $500K in value; which resulted in parts availability during emergency repairs.
▪ Directed reliability, corrective, and predictive maintenance for all plant electrical equipment and systems.
▪ Achieved plant availability of 97% by optimizing equipment performance through strategic utilization of planned maintenance allowances, directly reducing machinery breakdowns and enhancing overall operational efficiency.
▪ Controlled monthly departmental budgets by overhauling, testing and taking of care of AC and DC motors which minimized motor rewinding expenses by at least 50%.
Increased substation and generator reliability through a detailed schedule of predictive maintenance, resulting in an uptick to 98% operational efficiency while minimizing unplanned downtime across critical systems.
▪ Addressed critical system interruptions with precise troubleshooting measures that restored functionality within two hours on average; facilitated continued operations and maintained consistent output levels during peak periods.
▪ Improved response times on maintenance requests through active participation on-call shifts, resulting in decreased unplanned outages from four per month down to one while increasing overall productivity across bottling lines.
▪ Coordinated multi-faceted maintenance initiatives targeting key areas of improvement, leading to measurable increases in system productivity levels sustained throughout daily operations.
▪ Ensured checklists and inspections were up to date and accurate.
INSPECTION AND CERTIFICATION OF A THREE PHASE INDUSTRIAL AND COMMERCIAL INSTALLATIONS