Summary
Overview
Work History
Education
Skills
Timeline
Generic
Thataetsile Wynand Matebele

Thataetsile Wynand Matebele

Maintenance Inspector
Brits

Summary

Hardworking and passionate job seeker with strong organizational skills eager to join the team. Willing to learn and grow. Ready to help team achieve company goals. Been successful with minimizing unplanned plant stoppages. Optimize equipment reliability. Team building efforts

Overview

28
28
years of professional experience
8
8
years of post-secondary education

Work History

Maintenance Inspector

Sephaku Cement
Delmas
03.2016 - Current

Carry out planned maintenance jobs, Taking oil samples for analysis, Vibration measurements, Perform standby Studies, Root causes analysis, arrangement of spares, verification of correct spares, and availability at the stores, plant inspection, condition monitoring, non destructive tests on equipments, planned job risk assessment, perform PTO's on juniors, draft SOP, relieve Foreman, attend Plant reliability meetings, reporting to the maintenance manager,

Fitter

Sephaku Cement
Delmas
11.2013 - 02.2016

Carry out planned maintenance on plant equipment. Screw Conveyor, Motorized Double Flap Valves, Kilns, Hydraulic System, Pneumatic System, Kiln Cooler, Butterfly Valves, Cement Rotor Packer, Classifier and Vertical Mills, Horizontal Mill, Belt Conveyor, Vibrating Screens, Chute Vibratory, Gearboxes, Roller Conveyor, Cooling Towers, Pendulum Flap Valves, Airlift Blower, Airlines, Bucket Elevator, Water Injection System, Condition Towers, Compressor, Fans, Rotary Airlock, Floating Cell, Tailing Dam, Thickness, Pressure Vessel, Pressure Transport Vessel, Pan Conveyor, Apron Feeder, Production Samplers (Auto and manual), Positive Displacement Pumps, Slide Gate, Diaphragm Pump, Dust Collectors, Dampers, Palletizer, Stretch Hood, Turbine Pump, Drag Chain, Reclaimer, Multistage Pumps , Hot Gas Generator, Pfister Feeders etc.

Work standby, Shifts according to plant requirements.

Fitter

PPC
Dwaalboom
03.2012 - 10.2013

Carry out planned maintenance on plant equipment. Screw Conveyor, Motorized Double Flap Valves, Kilns, Hydraulic System, Pneumatic System, Kiln Cooler, Butterfly Valves, Cement Rotor Packer, Classifier and Vertical Mills, Horizontal Mill, Belt Conveyor, Vibrating Screens, Chute Vibratory, Gearboxes, Roller Conveyor, Cooling Towers, Pendulum Flap Valves, Airlift Blower, Airlines, Bucket Elevator, Water Injection System, Condition Towers, Compressor, Fans, Rotary Airlock, Floating Cell, Tailing Dam, Thickness, Pressure Vessel, Pressure Transport Vessel, Pan Conveyor, Apron Feeder, Production Samplers (Auto and manual), Positive Displacement Pumps, Slide Gate, Diaphragm Pump, Dust Collectors, Dampers, Palletizer, Stretch Hood, Turbine Pump, Drag Chain, Reclaimer, Multistage Pumps , Hot Gas Generator, Pfister Feeders etc.

Work standby, Shifts according to plant requirements.

Fitter

Lafarge Cement
Lichtenburg
02.2007 - 02.2012

Plant maintenance on plant equipment. Kiln, cooler, Palletizer, 12 spout rotor packer

Mechanical Handyman

Lonmin Platinum
Bapong
01.2000 - 01.2007

Trained and qualified as a fitter

Mechanical Handyman

Impala Platinum Mine
Rustenburg
01.1996 - 12.2000

Education

Matri -

Leruntse Lesedi High School
Makwassie
01.1990 - 12.1995

Fitting And Maching Trade Test - Trade Test

Olifantsfontein Training Centre
Clayville, Olifantsfontein
10.2004 - 10.2006

Skills

Technical inspections

undefined

Timeline

Maintenance Inspector

Sephaku Cement
03.2016 - Current

Fitter

Sephaku Cement
11.2013 - 02.2016

Fitter

PPC
03.2012 - 10.2013

Fitter

Lafarge Cement
02.2007 - 02.2012

Fitting And Maching Trade Test - Trade Test

Olifantsfontein Training Centre
10.2004 - 10.2006

Mechanical Handyman

Lonmin Platinum
01.2000 - 01.2007

Mechanical Handyman

Impala Platinum Mine
01.1996 - 12.2000

Matri -

Leruntse Lesedi High School
01.1990 - 12.1995
Thataetsile Wynand MatebeleMaintenance Inspector