Summary
Overview
Work History
Education
Skills
Timeline
AccountManager
Tendai George Dumbe

Tendai George Dumbe

Lichtenburg

Summary

Positive, analytical problem solver with passion for ensuring system reliability and efficiency. Equipped with solid understanding of engineering principles and expertise in root cause analysis and predictive maintenance. Committed to optimizing operations and enhancing performance through innovative solutions and continuous improvement.

Overview

8
8
years of professional experience

Work History

Packing and Dispatch Maintenance Manager

Afrimat Industries
06.2024 - Current
  • Supervised employee performance, preventive maintenance, and safety.
  • Scheduled regular inspections of equipment and facilities to manage wear and tear.
  • Streamlined and monitored quality programs to alleviate overdue compliance activities.
  • Optimized spare parts inventory management by identifying critical items and setting appropriate stock levels based on usage patterns.
  • Improved equipment reliability by implementing a preventive maintenance program and managing repair schedules.
  • Collaborated with other department managers to coordinate maintenance activities around production schedules, minimizing operational interruptions.
  • Increased overall equipment efficiency by conducting thorough assessments of machinery conditions and implementing necessary improvements.
  • Led the successful completion of major facility upgrades projects while adhering to budget constraints and timelines.
  • Reduced downtime by efficiently overseeing the maintenance team and prioritizing tasks according to urgency.
  • Trained maintenance technicians to apply proper techniques and best practices and comply with safety protocols.
  • Negotiated contracts with vendors for cost-effective procurement of parts and services, maintaining strong working relationships.
  • Developed detailed maintenance budgets, effectively controlling expenses while ensuring optimal equipment performance.
  • Conducted root cause analysis of recurring issues, devising long-term solutions that minimized future disruptions.
  • Delegated tasks to carefully selected employees in alignment with resource management goals.
  • Created and implemented maintenance program to optimize operational efficiency and reduce downtime.
  • Planned scheduled maintenance outages as part of preventive maintenance program.
  • Managed a team of technicians, providing guidance and support for skill development and performance improvement.
  • Documented inventory of spare parts to enable tracking history and maintain accurate records.
  • Established and documented protocols for preventive maintenance procedures, decreasing equipment issues, and reducing downtime.
  • Created and submitted detailed reports to highlight maintenance activities and equipment performance.
  • Promoted a culture of continuous improvement within the maintenance team by encouraging open communication, problem-solving initiatives, and employee engagement activities.
  • Streamlined work order processes for quicker response times, resulting in increased productivity and reduced costs.
  • Evaluated and recommended new technologies for potential integration into the facility''s maintenance operations, ensuring continued growth and adaptability in the face of industry advancements.
  • Forecasted and reviewed maintenance budgets to establish cost-effective measures.
  • Implemented energy conservation measures that led to significant savings on utility bills without compromising facility operations.
  • Established performance goals for employees and provided feedback on methods for reaching those milestones.
  • Cultivated positive rapport with fellow employees to boost company morale and promote employee retention.
  • Reduced waste and pursued revenue development strategies to keep department aligned with sales and profit targets.
  • Achieved a Packing and Palletizer plant NOEE of 85%
  • Achieved a record average of 70 pallets/hr

Reliability Maintenance Manager

Lafarge
06.2023 - 05.2024
  • Created performance metrics and dashboards to monitor equipment health trends, enabling data-driven decision-making for proactive interventions.
  • Developed comprehensive training programs for operations and maintenance staff, enhancing their skills in reliability best practices.
  • Conducted root cause analysis on equipment failures, implementing corrective actions to prevent future occurrences.
  • Conducted thorough analyses of failure data to identify opportunities for improving equipment design or modifying operational procedures for enhanced reliability outcomes.
  • Conducted regular audits of maintenance practices to ensure alignment with industry standards and best practices for optimal asset performance.
  • Improved overall plant performance by leading continuous improvement initiatives focused on equipment reliability and availability.
  • Collaborated with cross-functional teams to develop and implement asset management plans for improved operational efficiency.
  • Facilitated effective communication between operations, maintenance, engineering, and other departments to drive collaboration on reliability initiatives.
  • Collaborated with equipment vendors and suppliers to ensure optimal selection, installation, and commissioning of new assets in alignment with organizational reliability goals.
  • Enhanced equipment reliability by implementing predictive maintenance strategies and optimizing preventive maintenance schedules.
  • Reduced downtime for critical assets by conducting root cause analysis, identifying failure modes, and recommending corrective actions.
  • Trained and guided team members to maintain high productivity and performance metrics.
  • Conducted FMEA , Pareto and MOC's
  • Optimized equipment life cycles by performing regular inspections, monitoring performance trends, and recommending corrective actions as needed.
  • Conducted failure analysis investigations to determine root causes, preventing repeat occurrences of critical equipment breakdowns.
  • Evaluated new technologies for potential implementation in existing systems, driving innovation and continuous improvement efforts.
  • Developed comprehensive maintenance plans, ensuring timely execution of tasks and adherence to safety standards.
  • Performed lifecycle cost analyses for various equipment alternatives, enabling informed decisions regarding long-term investment strategies.
  • Trained junior engineers on reliability engineering practices, fostering a culture of continuous improvement within the team.
  • Increased equipment reliability by implementing preventive maintenance strategies and root cause analysis techniques.
  • Enhanced plant performance with thorough risk assessments, identifying potential failures and mitigating their impacts.
  • Tracked test reports and failures determined by root cause data trends.
  • Used information in technical diagrams, schematics, and manuals to understand operations and make successful repairs.

Achievements

  • Kiln 4 MTBF of 225hrs
  • Kiln 4 NAI of 90%
  • PMR of 20%
  • PMR Efficiency of 35%
  • Scheduling compliance of 85%
  • Planning accuracy of 90%
  • BOM Material PR ratio of 15%

Continuous Improvement Engineer

Lafarge
04.2022 - 06.2023
  • Develop and update maintenance plans utilizing RCM and RCA principles on equipment like; Scalper screen, Pushfeeder, Crushers, Conveyor belts, Tripper car, Vibrating screens, Dust collectors, Compressors and refrigerant dryers
  • CAPEX justification and presentations to the CAPEX forum
  • Technical specifications, plan and budget
  • Responsible for the execution and quality of maintenance tasks carried out on the mechanical and electrical equipment's, respecting budget, policies and deadlines
  • Managed a team of a supervisor, planner, inspector and artisans
  • Provided reports on corrective maintenance tasks including consumption of materials, man hours, skills and update equipment history files
  • Frequently reviewing maintenance strategies
  • Trending of MTBF and NAI in terms of plant equipment
  • Facilitate Root Cause Analysis studies to eliminate repeat failures
  • Coordinate and integrate the reliability effort in both maintenance and production
  • Develop reliability indicators, measure critical plant performance parameters and trend to identify areas of improvements within the business

Achievements

  • Achieved a highest limestone throughput record of 230kt/ month and NAI of 97%
  • Achieved an average limestone throughput of 205kt/ month and NAI of 87%

Junior Reliability Engineer! Cement Mills & Packing Plant

Lafarge
08.2019 - 04.2022
  • Implementation of maintenance strategy optimization (ball mills, bucket elevators, roller press, symetro gearbox, rotary packers, stretch hood pallet wrapping machine, pneumatic goods hoists)
  • Maintain and update information and data in the CMMS (SAP)
  • Optimized equipment life cycles by performing regular inspections, monitoring performance trends, and recommending corrective actions as needed.
  • Conducted failure analysis investigations to determine root causes, preventing repeat occurrences of critical equipment breakdowns.
  • Conducted regular reviews of maintenance procedures and practices, identifying areas for improvement and implementing corrective actions as needed.
  • Performed lifecycle cost analyses for various equipment alternatives, enabling informed decisions regarding long-term investment strategies.
  • Improved asset availability through effective use of predictive maintenance tools and methodologies.
  • Participated in capital projects from concept to completion, providing reliability expertise during design reviews and equipment selection processes.
  • Manage the preparation and consolidation of the shutdown planning (personal, third parties services, materials, spare parts, equipment, tools, time, and critical path) with coordination meetings using
  • Reduced waste and increased productivity through root cause analysis and corrective action implementation.
  • Worked with cross-functional plant teams to develop and implement manufacturing processing improvements and drive quality mindset resulting in 90% increase in productivity, 95% increase in throughput, and 88% improvement in productivity.
  • Ensure adherence to the preventative maintenance schedule
  • Maintain, improve, initialize and do cost control on assets
  • Utilized statistical analysis tools such as control charts, Pareto charts, and fishbone diagrams to identify root causes of process variation and drive targeted imp
  • Condition monitoring on critical equipment's

Projects Managed

  • Kiln Shell Replacement
  • Electro Static Precipitator replacement
  • Waste Gas Duct Replacement
  • 8 T overhead gantry crane installation
  • 1500 kW cement mill girth gear re profiling and pinion reversal with Novexa France

Mechanical Engineer Trainee

Lafarge
01.2017 - 07.2019
  • Project Manager for Optimization of the compressed air system and deducting systems
  • Supported maintenance team in troubleshooting equipment issues, minimizing downtime and maintaining productivity levels.
  • Developed technical documentation for products, improving clarity for end-users and maintenance personnel alike.
  • Developed technical skills through training and shadowing experienced professionals(Kiln mechanics, ball mill mechanic, compressed air audit,pneumatic conveying, grate cooler training, bucket elevator, roller press, roto packers etc)
  • Worked closely with engineers and assisted with product testing.
  • Read and interpreted blueprints, technical drawings, schematics, and computer-generated reports.

Education

Master of Science - Engineering Management

University of Pretoria
Pretoria, South Africa
03-2026

Bachelor of Science - Engineering And Technology Management

University of Pretoria
Pretoria, South Africa
12-2019

Bachelor of Technology - Mechanical Engineering

Cape Peninsula University of Technology
Cape Town, South Africa
11-2018

Diploma - Mechanical Engineering

Cape Peninsula University of Technology
Cape Town, South Africa
11-2017

Skills

  • Preventive Maintenance
  • Project management
  • Equipment troubleshooting
  • Predictive maintenance
  • Continuous improvement
  • Computerized maintenance management system
  • Asset management
  • Performance tracking and evaluation
  • Strategic planning
  • Financial management

Timeline

Packing and Dispatch Maintenance Manager

Afrimat Industries
06.2024 - Current

Reliability Maintenance Manager

Lafarge
06.2023 - 05.2024

Continuous Improvement Engineer

Lafarge
04.2022 - 06.2023

Junior Reliability Engineer! Cement Mills & Packing Plant

Lafarge
08.2019 - 04.2022

Mechanical Engineer Trainee

Lafarge
01.2017 - 07.2019

Master of Science - Engineering Management

University of Pretoria

Bachelor of Science - Engineering And Technology Management

University of Pretoria

Bachelor of Technology - Mechanical Engineering

Cape Peninsula University of Technology

Diploma - Mechanical Engineering

Cape Peninsula University of Technology
Tendai George Dumbe