Dynamic and results-oriented professional with a proven track record in engineering and project management. Seeking a challenging role where I can leverage my expertise in best practice implementation, knowledge management, business performance improvement, and project leadership to drive organizational success and innovation.
Contract Administration and Construction Management
undefinedUmngeni-UThukela Water, 55ML/d PN40 High Lift Pumpstations and 6.5km DN900 X52 Steel Pipe (wt=10mm) using Split Casing Centrifugal Pumps, 2023/043 - Mandeni Design Verification, Design Lead and Project Manager, R 1 million, 01/2024, Current - Estimated Completion: 04/2024, Rocky Place, Brakfontein 399-Jr, 0157, 078 634 8537, stanley.ndlovu02@gmail.com Umgeni Water (IA), Alfred Nzo District Municipality (End User), 3.2kms DN200 PVC-O TOM 500 PN20 Nyaka Gravity Main, FA2020/013/0- Greater Mbizana Regional Water Supply Scheme Phase 2 -Work Package 2, Design Lead and Project Manager, R 200 million, 05/2023, Current - Estimated Construction Completion: 07/2025, Bizana, Eastern Cape Umgeni Water, 10ML/d Abstraction Works with a 16 bar Low Lift Pumpstation., 2021/021 - Weza to Harding Supply Scheme Emergency Project, Design Lead and Project Manager, R 150 million, 09/2021, Current - Estimated Construction Completion: 07/2024, Weza in Harding, KZN Rand Water, Replacement of a Section, 900 m of 800 mm Diameter of the Existing J7 Steel Pipeline in Germiston, RW1349/17 - Work Package 14: J7 Pipeline, Design Engineer and Coordination, R 23,9 million + R 29,8 million + R 35,6 million, 03/11/2019, Current - Estimated Construction Completion: 06/30/2020, Germiston, Springs, Vereeniging and Zwartkopjes National Department Of Public Works, Detailed Investigations on Options to Augment the Current Water Supply to Meet Future Demands, Detailed Designs Of The Preferred Option And Construction Services In Support Of The Water Resources Management Strategy For Three Ports Of Entry, H17 - 040, Design Engineer, R 31 million, 12/2018, Current - Estimated Construction Completion: 12/2019, Along Border Botswana and North West: Skilpadshek, Swartkopfontein And Kopfontein City of Ekurhuleni, Design and Implementation of a Telemetry system, a Centralized SCADA and Refurbishing an existing building to fit a Control Centre., PW-WS 36-2016, Project Manager, R 40 million, 10/2018, Current - 06/2020, The entire City of Ekurhuleni DBSA/City of Ekurhuleni, Design and Implementation of RDP Housing in Palm Ridge Ext.9 Phase 4., Water and Sanitation Engineer, R 64 million + R 37 million + R 39 million, 09/2015, Currently in Construction (Design Phase Complete), Ekurhuleni, South Africa DBSA/City of Ekurhuleni, Design and Implementation of the Vosloorus Extension 9 Katorus Complex., Water and Sanitation Design Engineer, R 656 million, 09/2015, Currently in Construction (Design Phase Complete), Ekurhuleni, South Africa Trans-Caledon Tunnel Authority (TCTA), Acid Mine Drainage, Junior Engineer, R2 billion, 2014, 2018, Springs, Germiston and Randfontein, South Africa GoldOne Mine, Investigating Alternatives for Disposal of Acid Mine Drainage (AMD) from the Modder East Mine and Investigate the Possibilities of Lowering the AMD Levels for Future Exploration and Exploitation of the Gold Reefs in the Eastern Basin, Junior Engineer, R0.5 million (fees only), 2017, 2018, Johannesburg, South Africa Sekhukhune District Municipality, Water Conservation/Water Demand Management for the Flag Boshielo Scheme: Letebejane and Ditholong Pilot Project, Assistant Engineer, R13 million, 2017, 2018, Sekhukhune, Limpopo, South Africa