Summary
Overview
Work History
Education
Skills
Languages
Interests
References
Work Preference
Work Availability
Quote
Timeline
Generic
Louis Johannes Francois Steynmann

Louis Johannes Francois Steynmann

Technician
Vereeniging

Summary

Adept at hydraulic troubleshooting and fostering team collaboration, I significantly enhanced operational efficiency at APS Projects. Leveraging expertise in pump installation and exceptional problem-solving abilities, I led challenging projects to completion, achieving a notable increase in client satisfaction and project delivery speed. Quick-minded Hydraulic Engineer with 31 years of experience in hydraulic component application and system design. Solid understanding of fundamental and advanced hydraulic theory and applies knowledge to design complex hydraulic circuits in OEM environment. Displays strong leadership and project management skills to systematically solve hydraulic-related problems and perform root cause analysis. Focused Hydraulic Mechanic with extensive hydraulic experience. Inspecting, breaking down and repairing equipment. Proven to work quickly and accurately to meet tight timelines. Reliable and detail-oriented Technician bringing advanced troubleshooting and diagnostics abilities. Highly experienced with Hydraulic and Pneumatic equipment and maintenance needs. Additional skills include welding, torch cutting and parts fabrication. Detail-oriented mechanical engineering team member with methodical approach and expertise in drafting. Sees big picture of projects and helps keep team on-track with end goals by following through on every assignment. Accurate with figures and report details.

Overview

32
32
years of professional experience

Work History

Assistant Technician

APS Projects
04.2019 - Current
  • Collaborated with team members to ensure proper diagnosis, repair, and testing of hydraulic components.
  • Measured distances precisely to repair and install parts within strict tolerances.
  • Minimized disruption to client operations by coordinating with stakeholders to schedule repairs during optimal timeframes.
  • Optimized workflow by managing inventory levels of parts, supplies, and tools needed for jobs.
  • Supported new hires'' integration into the team by offering mentorship on best practices for servicing hydraulic systems.
  • Boosted operational efficiency by creating detailed work reports and maintaining accurate records of all repairs performed.
  • Contributed to company growth through successful completion of challenging projects involving advanced hydraulic technologies.
  • Developed strong rapport with suppliers, ensuring access to high-quality parts at competitive prices for project needs.
  • Assessed and tore down parts such as pumps, motors and cylinders in different pieces of equipment.
  • Streamlined processes through the development and implementation of standardized procedures for hydraulic maintenance tasks.

Hydraulic Technician

AAD Drive Train Systems
04.2013 - 08.2018
  • Collaborated with team members to ensure proper diagnosis, repair, and testing of hydraulic components.

Hydraulic Fitter

Pirtek Germiston
01.2008 - 03.2013
  • Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.

Mechanical Boiler Fitter

Boiler and Stoker JHB (Charlotte Maxeke Academic)
04.2007 - 12.2007
  • Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
  • Measured, marked, cut, bored, fitted and installed various piping or structural components in accordance with blueprints and job specifications using hand and power tools.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Reduced downtime by performing preventative maintenance on equipment, ensuring smooth operations.

Foreman

Wind-O-Fix
03.2004 - 12.2006
  • Addressed issues with employees and customers to manage healthy conflict resolutions.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.

Boilermaker

WMW Construction
01.2002 - 10.2003
  • Interpreted blueprints, sketches, and specifications for each job.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment, structures and materials to identify cause of errors.
  • Identified issues and addressed each immediately with job foreman.
  • Ensured compliance with industry regulations through diligent adherence to codes and guidelines in all tasks performed.
  • Studied designs, blueprints and drawings to create templates of boilers.
  • Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
  • Maintained compliance with all safety procedures from both client and employer.
  • Achieved timely project completion by effectively managing resources, schedules, and deadlines while working on multiple projects simultaneously.

Utility Worker & Volunteer Worker

CHOC (Children's Hematology Oncology Clinic)
01.1999 - 11.2002
  • Kept work area clean, neat, and well-stocked to maximize productivity.

Machine Operator

Metal Box
07.2001 - 11.2001
  • Operated multiple machines simultaneously to meet production requirements.
  • Followed detailed instructions to operate machines with accuracy and produce quality products.
  • Maintained equipment performance by lubricating and cleaning components.
  • Loaded raw materials into machines and unloaded finished products to keep manufacturing process running smoothly.

Handyman

Iscor (Vanderbijlpark)
03.2000 - 09.2001
  • Completed repair jobs to restore functionality to electric and plumbing systems.
  • Consistently met deadlines for assigned projects by prioritizing tasks efficiently based on urgency and complexity.
  • Managed inventory of supplies necessary for completing handyman jobs, avoiding delays due to lack of materials or resources.
  • Reduced safety hazards by promptly addressing electrical issues, repairing broken appliances, and fixing damaged structures.
  • Completed repair projects on time and under budget, resulting in significant increase in new client referrals.

Semi-skilled Fitter - Machine Operator

Cape Gate
01.1993 - 11.1998
  • Applied strong problem-solving skills to address unexpected challenges that arose during the fitting process.
  • Measured, marked, cut, bored, fitted and installed various piping or structural components in accordance with blueprints and job specifications using hand and power tools.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Reduced downtime by performing preventative maintenance on equipment, ensuring smooth operations.
  • Corresponded with supervisor to identify and carry out projects, implementing repairs, expansions and new installations according to customer requirements.
  • Improved overall project completion time through proficient use of hand tools, power tools, and specialized machinery.
  • Performed detailed inspections of completed assemblies, ensuring adherence to quality standards and client requirements.
  • Streamlined assembly processes with precise measurements and cutting, resulting in improved quality of finished products.
  • Maintained accurate records of job progress, materials used, and time spent on each task to support accurate billing and inventory management.
  • Collaborated with team members to complete tasks on schedule, maintaining high standards of workmanship.
  • Fabricated pipe spools for butt weld, socket weld and threaded systems utilizing proper fit up techniques such as root openings on butt weld fittings and set back on socket weld fittings.
  • Laid out, positioned, aligned and secured parts for welding and bolt-up.
  • Participated in cross-functional teams for large-scale projects, collaborating effectively with diverse groups to achieve objectives.

Education

Standard 8 Certificate

High School Fakkel Sasolburg
18 Jan Smuts Street Sedibeng 1947
04.2001 -

Skills

Languages

afrikaans
Advanced (C1)
English
Intermediate (B1)

Interests

Music

Motorcars and motorbikes

Gardening and household chores

References

Reference for Cape Gate: D. Davieson 016 980 2121

Refernce for Charlotte Maxeke hospital: P. Le Roux 011 488 3029

Reference for CHOC: P.Lewis 011 486 1212

Reference for Pirtek: R. Steyn 079 522 2789

Reference for AAD Drive train systems: M. Higgins 083 651 6111

Reference for APS: M. Coetzee 084 940 0555

Work Preference

Work Type

Full TimeContract Work

Work Location

On-SiteRemote

Important To Me

Career advancementPersonal development programs

Work Availability

monday
tuesday
wednesday
thursday
friday
saturday
sunday
morning
afternoon
evening
swipe to browse

Quote

If the doors of perception were cleaned, everything would appear to man as it is: infinite.
William Blake

Timeline

Assistant Technician

APS Projects
04.2019 - Current

Hydraulic Technician

AAD Drive Train Systems
04.2013 - 08.2018

Hydraulic Fitter

Pirtek Germiston
01.2008 - 03.2013

Mechanical Boiler Fitter

Boiler and Stoker JHB (Charlotte Maxeke Academic)
04.2007 - 12.2007

Foreman

Wind-O-Fix
03.2004 - 12.2006

Boilermaker

WMW Construction
01.2002 - 10.2003

Machine Operator

Metal Box
07.2001 - 11.2001

Standard 8 Certificate

High School Fakkel Sasolburg
04.2001 -

Handyman

Iscor (Vanderbijlpark)
03.2000 - 09.2001

Utility Worker & Volunteer Worker

CHOC (Children's Hematology Oncology Clinic)
01.1999 - 11.2002

Semi-skilled Fitter - Machine Operator

Cape Gate
01.1993 - 11.1998
Louis Johannes Francois SteynmannTechnician