Electrical maintenance professional performing inspections, completing 25+ preventative maintenance tasks per week, 20+ tests per month, responding to 3+ breakdowns per month, and preventative care across UPS and supporting electrical equipment. Works with capacitor testing, SCR and IGBT testing, schematic interpretation, and safe battery disconnection and installation. Suits Electrical Maintenance Technician roles that require disciplined maintenance routines, fault isolation, and accurate technical documentation.

Overview

7
7
years of professional experience

Work History

Electrical / UPS Technician

DPSI SOUTH AFRICA
02.2022 - Current
  • Completed preventative maintenance inspections UPS and Battery Tripping Units
  • Testing of batteries, UPS/ BTU input and output parameters, and bypass systems to verify stable power performance.
  • Inspect rectifiers, inverters, cooling fans, capacitors, and connections to identify wear before failures occur.
  • Perform battery disconnect and installation tasks while following electrical safety procedures and manufacturer requirements.
  • Interpret schematic diagrams and wiring drawings to support troubleshooting, repairs, and equipment checks.
  • Prepare service reports, recommend corrective actions, and provide technical support with professional customer service.

ELECTRICAL/ UPS Technician

Diversified Power and Systems Intergration
01.2020 - 12.2022
  • Completed 4 UPS service tasks per week across installation, commissioning, and repair work.
  • Performed preventive maintenance on UPS and electrical equipment to reduce recurring faults and keep systems operational.
  • Installed, disconnected, and maintained battery banks during replacements, inspections, and routine service visits.
  • Inspected electrical components, interpreted schematic drawings, and completed testing to verify equipment performance.
  • Recorded maintenance reports and job cards accurately while following occupational health and safety requirements.
  • Applied computer literacy to update service records, track work orders, and support maintenance planning.

Education

Advanced Diploma - Power Engineering Systems

University of South Africa
09-2026

National Diploma - Engineering Electrical ( H/C) S4

Mangosuthu University of technology
01-2018

Matric 12 - undefined

Sebensa-kanzima Secondary
01-2003

Skills

Fault finding and repairs of UPSs

Testing of capacitors

Understanding and interpretation of schematic diagrams and drawings

Load bank testing

Power quality analysis

Battery bank maintenance

Rectifier and inverter inspection

Preventive maintenance inspections

UPS installation and commissioning

Emergency breakdown response

Battery impedance testing

Thermal imaging

Power factor correction

Generator synchronisation

Surge protection testing

Harmonic distortion analysis

Remote diagnostics

Maintenance planning

Electrical drawings revision control

SCADA monitoring

NFPA 70E safety training

OEM certification

Timeline

Electrical / UPS Technician

DPSI SOUTH AFRICA
02.2022 - Current

ELECTRICAL/ UPS Technician

Diversified Power and Systems Intergration
01.2020 - 12.2022

Matric 12 - undefined

Sebensa-kanzima Secondary

National Diploma - Engineering Electrical ( H/C) S4

Mangosuthu University of technology

Advanced Diploma - Power Engineering Systems

University of South Africa

Personal Information

  • Date of Birth: 21 January 1985
  • Nationality: South African
  • Marital Status: Single

Achievements/ PROJECTS COMPLETED

Site. : Mondi Richards bay

 Scope of work. : UPS upgrade , maintenance and repairs 

Date : October 2021 Duration. : 3 months.

 Site. : Foskor Richards bay 

Scope of work. : UPS upgrade

 Date of project. : 03 Dec 2021 Duration. : 1 month

 Site. : Mpact Piet Retief 

Scope of work. : UPS upgrade 

Date of project. : February 2022 Duration. : 2 days, Site. : Zambia Illovo Sugar Scope of work. : UPS Upgrade, maintenance & repairs Date of project. : March 2025 Duration. : 1 month,

 Site. : Kilombero(Tanzania)

 Illovo Sugar Scope of work. : UPS upgrade, maintenance  & repairs Date of project. : April 2023-2026 Duration. : 4 years, 