Experience in roads and mining infrastructure 20 years working experience as Foreman and 24 years as Production Manager

Overview

1
1
Language
53
53
years of professional experience

Work History

Production Manager

WBHO CONSTRUCTION (PTY) LTD
- Current
  • OBUASI Recommissioning PROJECT
  • The scope of works includes the construction of Biox compartment, Holding Ponds, the extension of the Pipeline Corridor, South TSF Remedial Works and Water Management.
  • US $ 16.5

Production Manager

AHAFO TSF 2, NEWMONT GHANA
11.2018 - 01.2020
  • The scope of work is the 127Mt Cell 1 Raise construction. The Raise construction entails, but are not limited to, the following:
  • Raising the existing Cell 1 embankments and layer works vertically using run of mine waste rock in a downstream fashion. Also, realigning and constructing new public access roads as well as haul roads.
  • US $ 18.3

Production Manager

AHAFO SAME & SUBIKA, NEWMONT GHANA
01.2017 - 11.2018
  • Ahaf Mill Expansion (SAME)
  • The scope of the project consist of Bulk Earthworks to various lay down areas, Primary Crusher, Stockpile Reclaim tunnel backfill and backfill to a earth retaining concrete wall.
  • The Civil portion of the works consist of the construction of a Primary crusher with three concrete slabs and the pre-cast and installation of the earth retain concrete face wall panels. Scope of the project also consist of various services that needs to be installed.
  • Ahaf Subika Underground Development (SUG) -Civil & Bulk Earthworks (SUBIKA)
  • Construction of the Subika Underground development, including a Reinforced Earth wall and associated earthworks and services.
  • US $ 33

Production Manager

KALCON (PTY) LTD
01.2015 - 01.2016
  • DAM 8 WALL RAISING, BOTSWANA
  • The contract comprises the raising of existing slimes dam (No 8) using waste rock (1 800 000m3) the installation of sand lining (170 000m3) and the associated pipe and concrete works.
  • BWP 130

Production Manager

NSC JV BOTSWANA
01.2014 - 01.2015
  • Bulk water supply, reservoir, pump station and fiber optic cables.
  • R 1 600

Production Manager

WBHO CONSTRUCTION (PTY) LTD
01.2011 - 01.2014
  • GOLD MINE NEWMONT, GHANA
  • New infrastructure.
  • US$ 40

Production Manager

UPGRADING FREESTATE ROADS FOR DEPARTMENT OF POLICE ROADS, RSA
01.2010 - 01.2011
  • R 280

Production Manager

KING SHAKA INTERNATIONAL AIRPORT, DURBAN, RSA
01.2008 - 01.2010
  • The project included the turnkey design and construct contract.
  • 7,5 million passengers per day Durban International Airport and included a cargo handling terminal and trade port. The project included a 3,7 km runway, parallel and cross taxiways, aircraft parking aprons and all civil infrastructure required for a new airport.
  • The facilities included a 100 000 m2 terminal building, multi storey car park, 5 storey office block, a crash fire and rescue building, maintenance workshops, a cargo terminal, fuel farm and associated hydrant system. The contract includes all specialist packages associated with an Airport including a baggage handling system, 14 aerobridges, 23 IT subsystems, airfield ground lighting, instrument landing systems and cargo handling equipment.
  • The project was completed in 31 months from commencement to end of trial operations.
  • Joint venture – WBHO’s participation 38,5% - WBHO led the EPC Joint Venture as well as the joint ventures for the Building Works and the Civil Works.
  • Interchange for the new King Shaka International Airport
  • Four new ramps / One conventional bridge / One Incrementally launched bridge Nine lane toll plaza on Durban Bound ramp / Replacement of 500m, 16” defective Steel Pipeline / Valve Maintenance / Alteration and Modification to existing Pipe work / Dry & Pressure Testing / Re commissioning of the Line.
  • R 6.8bn

Production Manager

OR TAMBO, JOHANNESBURG INTERNATIONAL AIRPORT ACSA, RSA
01.2006 - 01.2008
  • R 380

Production Manager

ERNIE ELS GOLF COURSE, ABSA, RSA
01.2005 - 01.2006
  • R 280

Production Manager

OUBAAI GOLF ESTATE, RSA
01.2004 - 01.2005
  • The Contract comprises of the complete infrastructure construction for 322 upmarket serviced plots. An Ernie Els Design, 18 hole championship golfcourse is currently under construction.
  • 580 000m3 of material will be moved in various cut to fill exercises. Work involves the reconstruction of a single carriageway of approximately 3.2km of Divisional Road 1590.
  • R 97

Production Manager

JOHANNESBURG INTERNATIONAL AIRPORT CHARLIE APRON ACSA, RSA
01.2001 - 01.2004
  • R 400

Production Manager

MELROSE ARCH, INVESTEC, RSA
01.1999 - 01.2001
  • 1.2km road with all the services and urban furniture including concrete planter boxes.
  • R 40

Production Manager

KALCON (PTY) LTD
01.1996 - 01.1999
  • LETLHAKANE TO MOPIPI BYPASS, BOTSWANA
  • 100km road.
  • P 250

General Foreman

PALAPYE INFRASTRUCTURE, BOTSWANA
01.1994 - 01.1996
  • P 350

General Foreman

MAHALAPYE INFRASTRUCTURE, BOTSWANA
01.1992 - 01.1994
  • P 310

General Foreman

SELEBE PHIKWE INFRASTRUCTURE, BOTSWANA
01.1990 - 01.1992
  • P 350

General Foreman

BOBONONG ROAD, BOTSWANA
01.1987 - 01.1990
  • 110km of road.
  • P 250

Foreman

BASIL READ CONSTRUCTION (PTY) LTD
01.1985 - 01.1988
  • SOUTH AFRICAN AIR FORCE DEPOT – SADF, RSA
  • R 150

General Foreman

WBHO CONSTRUCTION (PTY) LTD
01.1984 - 01.1987
  • HIGHWAY IN KZN, RSA
  • Major double highway – 120km.
  • R 400

Foreman

SAVAGE AND LOVEMORE (G5)
01.1982 - 01.1985
  • TOYOTA TEST TRACK – TOYOTA, RSA
  • R 170

Foreman

SOUTH COAST FREEWAY – UMGABABA-PORT SHEPSTON, ROADS DEPARTMENT, RSA
01.1974 - 01.1982
  • R 300

PERSONAL INFORMATION

  • Name: Patrick Lenferna (Pat) de la Motte
  • Position: Production Manager
  • Qualifications: Grade 12 SAFCEC Compaction Construction Management
  • Years in Construction: 46
  • Years with WBHO: 36
  • Nationality: South African
  • Date of Birth: 1955-06-30
  • Marital Status: Married

Timeline

Production Manager

AHAFO TSF 2, NEWMONT GHANA
11.2018 - 01.2020

Production Manager

AHAFO SAME & SUBIKA, NEWMONT GHANA
01.2017 - 11.2018

Production Manager

KALCON (PTY) LTD
01.2015 - 01.2016

Production Manager

NSC JV BOTSWANA
01.2014 - 01.2015

Production Manager

WBHO CONSTRUCTION (PTY) LTD
01.2011 - 01.2014

Production Manager

UPGRADING FREESTATE ROADS FOR DEPARTMENT OF POLICE ROADS, RSA
01.2010 - 01.2011

Production Manager

KING SHAKA INTERNATIONAL AIRPORT, DURBAN, RSA
01.2008 - 01.2010

Production Manager

OR TAMBO, JOHANNESBURG INTERNATIONAL AIRPORT ACSA, RSA
01.2006 - 01.2008

Production Manager

ERNIE ELS GOLF COURSE, ABSA, RSA
01.2005 - 01.2006

Production Manager

OUBAAI GOLF ESTATE, RSA
01.2004 - 01.2005

Production Manager

JOHANNESBURG INTERNATIONAL AIRPORT CHARLIE APRON ACSA, RSA
01.2001 - 01.2004

Production Manager

MELROSE ARCH, INVESTEC, RSA
01.1999 - 01.2001

Production Manager

KALCON (PTY) LTD
01.1996 - 01.1999

General Foreman

PALAPYE INFRASTRUCTURE, BOTSWANA
01.1994 - 01.1996

General Foreman

MAHALAPYE INFRASTRUCTURE, BOTSWANA
01.1992 - 01.1994

General Foreman

SELEBE PHIKWE INFRASTRUCTURE, BOTSWANA
01.1990 - 01.1992

General Foreman

BOBONONG ROAD, BOTSWANA
01.1987 - 01.1990

Foreman

BASIL READ CONSTRUCTION (PTY) LTD
01.1985 - 01.1988

General Foreman

WBHO CONSTRUCTION (PTY) LTD
01.1984 - 01.1987

Foreman

SAVAGE AND LOVEMORE (G5)
01.1982 - 01.1985

Foreman

SOUTH COAST FREEWAY – UMGABABA-PORT SHEPSTON, ROADS DEPARTMENT, RSA
01.1974 - 01.1982

Production Manager

WBHO CONSTRUCTION (PTY) LTD
- Current
Patrick De la motteProduction Manager