Experience in roads and mining infrastructure
20 years working experience as Foreman and 24 years as Production Manager
Overview
1
1
Language
53
53
years of professional experience
Work History
Production Manager
WBHO CONSTRUCTION (PTY) LTD
- Current
OBUASI Recommissioning PROJECT
The scope of works includes the construction of Biox compartment, Holding Ponds, the extension of the Pipeline Corridor, South TSF Remedial Works and Water Management.
US $ 16.5
Production Manager
AHAFO TSF 2, NEWMONT GHANA
11.2018 - 01.2020
The scope of work is the 127Mt Cell 1 Raise construction. The Raise construction entails, but are not limited to, the following:
Raising the existing Cell 1 embankments and layer works vertically using run of mine waste rock in a downstream fashion. Also, realigning and constructing new public access roads as well as haul roads.
US $ 18.3
Production Manager
AHAFO SAME & SUBIKA, NEWMONT GHANA
01.2017 - 11.2018
Ahaf Mill Expansion (SAME)
The scope of the project consist of Bulk Earthworks to various lay down areas, Primary Crusher, Stockpile Reclaim tunnel backfill and backfill to a earth retaining concrete wall.
The Civil portion of the works consist of the construction of a Primary crusher with three concrete slabs and the pre-cast and installation of the earth retain concrete face wall panels. Scope of the project also consist of various services that needs to be installed.
Ahaf Subika Underground Development (SUG) -Civil & Bulk Earthworks (SUBIKA)
Construction of the Subika Underground development, including a Reinforced Earth wall and associated earthworks and services.
US $ 33
Production Manager
KALCON (PTY) LTD
01.2015 - 01.2016
DAM 8 WALL RAISING, BOTSWANA
The contract comprises the raising of existing slimes dam (No 8) using waste rock (1 800 000m3) the installation of sand lining (170 000m3) and the associated pipe and concrete works.
BWP 130
Production Manager
NSC JV BOTSWANA
01.2014 - 01.2015
Bulk water supply, reservoir, pump station and fiber optic cables.
R 1 600
Production Manager
WBHO CONSTRUCTION (PTY) LTD
01.2011 - 01.2014
GOLD MINE NEWMONT, GHANA
New infrastructure.
US$ 40
Production Manager
UPGRADING FREESTATE ROADS FOR DEPARTMENT OF POLICE ROADS, RSA
01.2010 - 01.2011
R 280
Production Manager
KING SHAKA INTERNATIONAL AIRPORT, DURBAN, RSA
01.2008 - 01.2010
The project included the turnkey design and construct contract.
7,5 million passengers per day Durban International Airport and included a cargo handling terminal and trade port. The project included a 3,7 km runway, parallel and cross taxiways, aircraft parking aprons and all civil infrastructure required for a new airport.
The facilities included a 100 000 m2 terminal building, multi storey car park, 5 storey office block, a crash fire and rescue building, maintenance workshops, a cargo terminal, fuel farm and associated hydrant system. The contract includes all specialist packages associated with an Airport including a baggage handling system, 14 aerobridges, 23 IT subsystems, airfield ground lighting, instrument landing systems and cargo handling equipment.
The project was completed in 31 months from commencement to end of trial operations.
Joint venture – WBHO’s participation 38,5% - WBHO led the EPC Joint Venture as well as the joint ventures for the Building Works and the Civil Works.
Interchange for the new King Shaka International Airport
Four new ramps / One conventional bridge / One Incrementally launched bridge Nine lane toll plaza on Durban Bound ramp / Replacement of 500m, 16” defective Steel Pipeline / Valve Maintenance / Alteration and Modification to existing Pipe work / Dry & Pressure Testing / Re commissioning of the Line.
R 6.8bn
Production Manager
OR TAMBO, JOHANNESBURG INTERNATIONAL AIRPORT ACSA, RSA
01.2006 - 01.2008
R 380
Production Manager
ERNIE ELS GOLF COURSE, ABSA, RSA
01.2005 - 01.2006
R 280
Production Manager
OUBAAI GOLF ESTATE, RSA
01.2004 - 01.2005
The Contract comprises of the complete infrastructure construction for 322 upmarket serviced plots. An Ernie Els Design, 18 hole championship golfcourse is currently under construction.
580 000m3 of material will be moved in various cut to fill exercises. Work involves the reconstruction of a single carriageway of approximately 3.2km of Divisional Road 1590.
R 97
Production Manager
JOHANNESBURG INTERNATIONAL AIRPORT CHARLIE APRON ACSA, RSA
01.2001 - 01.2004
R 400
Production Manager
MELROSE ARCH, INVESTEC, RSA
01.1999 - 01.2001
1.2km road with all the services and urban furniture including concrete planter boxes.
R 40
Production Manager
KALCON (PTY) LTD
01.1996 - 01.1999
LETLHAKANE TO MOPIPI BYPASS, BOTSWANA
100km road.
P 250
General Foreman
PALAPYE INFRASTRUCTURE, BOTSWANA
01.1994 - 01.1996
P 350
General Foreman
MAHALAPYE INFRASTRUCTURE, BOTSWANA
01.1992 - 01.1994
P 310
General Foreman
SELEBE PHIKWE INFRASTRUCTURE, BOTSWANA
01.1990 - 01.1992
P 350
General Foreman
BOBONONG ROAD, BOTSWANA
01.1987 - 01.1990
110km of road.
P 250
Foreman
BASIL READ CONSTRUCTION (PTY) LTD
01.1985 - 01.1988
SOUTH AFRICAN AIR FORCE DEPOT – SADF, RSA
R 150
General Foreman
WBHO CONSTRUCTION (PTY) LTD
01.1984 - 01.1987
HIGHWAY IN KZN, RSA
Major double highway – 120km.
R 400
Foreman
SAVAGE AND LOVEMORE (G5)
01.1982 - 01.1985
TOYOTA TEST TRACK – TOYOTA, RSA
R 170
Foreman
SOUTH COAST FREEWAY – UMGABABA-PORT SHEPSTON, ROADS DEPARTMENT, RSA
01.1974 - 01.1982
R 300
PERSONAL INFORMATION
Name: Patrick Lenferna (Pat) de la Motte
Position: Production Manager
Qualifications: Grade 12
SAFCEC Compaction Construction Management
Years in Construction: 46
Years with WBHO: 36
Nationality: South African
Date of Birth: 1955-06-30
Marital Status: Married
Timeline
Production Manager
AHAFO TSF 2, NEWMONT GHANA
11.2018 - 01.2020
Production Manager
AHAFO SAME & SUBIKA, NEWMONT GHANA
01.2017 - 11.2018
Production Manager
KALCON (PTY) LTD
01.2015 - 01.2016
Production Manager
NSC JV BOTSWANA
01.2014 - 01.2015
Production Manager
WBHO CONSTRUCTION (PTY) LTD
01.2011 - 01.2014
Production Manager
UPGRADING FREESTATE ROADS FOR DEPARTMENT OF POLICE ROADS, RSA
01.2010 - 01.2011
Production Manager
KING SHAKA INTERNATIONAL AIRPORT, DURBAN, RSA
01.2008 - 01.2010
Production Manager
OR TAMBO, JOHANNESBURG INTERNATIONAL AIRPORT ACSA, RSA
01.2006 - 01.2008
Production Manager
ERNIE ELS GOLF COURSE, ABSA, RSA
01.2005 - 01.2006
Production Manager
OUBAAI GOLF ESTATE, RSA
01.2004 - 01.2005
Production Manager
JOHANNESBURG INTERNATIONAL AIRPORT CHARLIE APRON ACSA, RSA
01.2001 - 01.2004
Production Manager
MELROSE ARCH, INVESTEC, RSA
01.1999 - 01.2001
Production Manager
KALCON (PTY) LTD
01.1996 - 01.1999
General Foreman
PALAPYE INFRASTRUCTURE, BOTSWANA
01.1994 - 01.1996
General Foreman
MAHALAPYE INFRASTRUCTURE, BOTSWANA
01.1992 - 01.1994
General Foreman
SELEBE PHIKWE INFRASTRUCTURE, BOTSWANA
01.1990 - 01.1992
General Foreman
BOBONONG ROAD, BOTSWANA
01.1987 - 01.1990
Foreman
BASIL READ CONSTRUCTION (PTY) LTD
01.1985 - 01.1988
General Foreman
WBHO CONSTRUCTION (PTY) LTD
01.1984 - 01.1987
Foreman
SAVAGE AND LOVEMORE (G5)
01.1982 - 01.1985
Foreman
SOUTH COAST FREEWAY – UMGABABA-PORT SHEPSTON, ROADS DEPARTMENT, RSA