

Instrumentation Technician with significant experience at Sibanye Stillwater and Exxaro Zincor Base Metal. Expertise in optimizing air compressor performance, maintaining pumps, and troubleshooting S7 controllers. Skilled in designing power distribution systems, installing instruments, and conducting diagnostic tests. Strong focus on preventive maintenance, health and safety compliance, and fostering team collaboration to enhance operational efficiency.
Job Purpose:
To operate and monitor specialized production equipment in a highly regulated environment of producing explosive, ensuring strict adherence to safety standards, quality requirements, and operational procedures.
Key Responsibilities:
Accurate calibration of instruments
Flow meter performance assessment
Control valve servicing
Temperature sensors management
Wiring plans
Problem-solving
Wiring diagrams
Schematic interpretation
Field instrumentation
Instrumentation installation
Control systems troubleshooting
SCADA system operation
Measurement devices proficiency
Sibanye Stillwater, Instrumentation Technician. Ensure the Fridge plant is in operating according to the required standard, Air Compressor machines monitoring, Fridge plant maintenance, Underground maintenance ,Pumps monitoring, Do a maintenance on the following, Belt scale, Trouble shooting and maintenance on S7 (300, 400, and 1200), Ultrasonic level, Magnetic flow meter (krone), Pump monitoring control loop, Wonder ware intouch SCADA, Installing instruments, Wiring the panels, Assist with commissioning of plant, Do quality inspections of control system and all newly installed instruments, Design power distribution from MCC to UPS to instrument DB to system and to individual instruments, Maintaining temperature e.g. thermocouples, Rtd, Maintaining control valves e.g. Rotok and Drehmo actuators, Flow sensors and proxy switch e.g. ifm, Handling standby duties, Basic PLC knowledge eg: function block and ladder diagram, Exxaro Zincor Base metal, Engineering, Instrument Technician, 2008-01-01, 2011-12-31, Attend breakdowns to keep the production lines working and reduce the downtime, Do a Preventative and corrective maintenance on production line, Monitor and calibrate the vessels on the batching system as per monthly schedule, Do fault finding using Allen Bradley PLC