Accomplished Project Manager with 17 years of experience in civil, steel structure, and engineering works. Proficient in planning, directing, and ensuring seamless operations across multiple departments. Demonstrated expertise in overseeing manufacturing staff and optimizing production efficiency while upholding quality standards. Utilizing a blend of creativity and analytical thinking to drive continuous process enhancements. Adept at problem identification and solution provision. Known for fostering team success through mentorship, training, and empowerment strategies.
Project planning
Successfully delivered civil infrastructure projects on time within budget, including roads, foundations, drainage systems, and structural works.
Managed multiple large-scale projects with contract values exceeding [insert amount], ensuring compliance with all specifications and safety standards.
Cost & Resource OptimizationReduced construction costs by 10–20% through value engineering, better procurement strategies, and efficient material/resource planning.
Maximized resource utilization by streamlining labor allocation and subcontractor coordination.
Team & Stakeholder LeadershipLed multidisciplinary teams of engineers, surveyors, and site supervisors, improving team productivity and morale.
Built and maintained strong relationships with clients, consultants, and regulatory bodies, leading to repeat business and smooth project approvals.
Safety & ComplianceAchieved zero lost-time incidents (LTI) on multiple projects through strict adherence to HSE policies and safety training programs.
Ensured compliance with local and international building codes, environmental regulations, and quality standards (ISO, SANS, etc.).
Technical & Construction ExcellenceDelivered complex civil works such as deep foundations, earthworks, retaining walls, and concrete structures with high technical accuracy.
Implemented innovative solutions to overcome site constraints like unstable soil, limited access, and tight deadlines.
Digital & Documentation AdvancementsIntroduced project tracking and reporting systems using tools like AutoCAD, MS Project, and Primavera, resulting in improved transparency and decision-making.
Maintained thorough documentation for audits, claims, and project handovers.
Building of MCC
Installation of Magnet Belt
Furnace Rebuild
Gabion Wall - building Sierra Leone ( Benny Inpit wall, Tailing dams, Spill ways, camps)
Installation of transformers
Building of Change house, Smoking area, Boardrooms and offices at Anglo site
Installation of clearview fencing at Royal Bafokeng site
Casting of concrete slabs, Bund walls, Transformer base
Installation of pumps and valves on Anglo, Glencore and Royal Bafokeng
Lange Heinrigh - Rebuild of uranium mine in Namibia
Stag repairs (Oil & Gas) Astron Cape Town
GMD Foundation Sag #2 - Indonesia