Summary
Overview
Work History
Education
Skills
Certification
Industries and Career History
Timeline
Generic
Marks Lebelo

Marks Lebelo

PlantsMan(Technical Technician)
Bronkhorstspruit

Summary

Having completed boilermaker apprenticeship and stepped in the role of boilermaker artisan role, I have been in charge of planningt maintenance and planning and I have now steeped in the role of leading the maintenance team, sourcing required spares and also plan upcoming maintenance while attending to breakdowns

Overview

1
1
Language
8
8
Certifications
14
14
years of professional experience

Work History

PlantsMan TeamLeader

Afrimat
12.2024 - Current

Maintenance Boilermaker

Afrisam
03.2023 - 11.2024

Workshop Boilermaker

JCB Gearvest
11.2021 - 02.2023

Maintenance Boilermaker

BMI Electrical
02.2019 - 03.2020

Maintenance Supervisor

Fraser Alexander
05.2018 - 01.2019

Anglo Platinum Maintenance Supervisor

HML Engineering
01.2016 - 02.2018

Maintenance Boilermaker

Anglo Platinum Mine
07.2015 - 12.2015

Boilermaker Maintenance

Actom
07.2014 - 06.2015

Boilermaker Construction and Apprentice

Murry & Roberts
07.2012 - 05.2014

Education

Trade Certificate - Section 26D, Red Seal

Tlhahlong Training Centre
Lephalale, South Africa
04.2001 -

Associate of Engineering - N2, N3, N4, N5, N6

Lephalale TVET College
Lephalale, South Africa
04.2001 -

Phase 1-5 - Gijima

Tlhahlong Training Centre
Lephalale, South Africa
04.2001 -

National Senior Certificate - Mathematics and Physical Science

Waterberg High School
Mokopane
12-2010

Skills

Strategic Maintenance Planning

Preventive and corrective maintenance

Safety Management

Results-driven planning

Project Coordination

Innovative Solutions

Technical Communication

Tools selection

Analytical and strategic thinking

Proactive Leadership

Effective Team Leadership

Team Development

Flexibility Scheduling

Adaptability to conditions

Teamwork and collaboration

Problem-solving

Attention to detail

Certification

TRADE CERTIFICATE

Industries and Career History

  • Manufacturing, Mining, Power Stations and Construction
  • Replacement of crusher liners and installations
  • Fault finding and crusher components identification
  • Fabrication of chute liners and installation
  • Pipe fabrication and installation
  • Pipe developments and fabrication (lobster bends, t-piece, y-piece, reducers)
  • Fabrication and installation of boiler feed water pipes, boiler exhaust pipes (steam pipes), fire hydrant pipes, molasses pipes, ventilation pipes, blast furnace cooling water pipes, ethanol feed and discharge pipes
  • Site fabrication, modification and installation of pipes
  • Preparation of butt joints
  • Lay out and pattern development
  • Installation of valves and gauges
  • Threading and installation of screwed pipes
  • Fabrication and installation of pipe supports, supporting steel structure and brackets
  • Site modification of pipe supports
  • Fabrication, assembling and installation of ducting, chutes, hoppers, transition pieces, launders
  • Lay out and fabrication of various steel structural work including conveyor structure, conveyor stacker, staircases, platforms, lifting gantries, crane gantry, rand rails, feeder tables, screens, plate girders, coal and flotation sheds, plant structure, ladders, roof trusses, gutters, gratings, kick-plates
  • Site modification, erection and installation of structural steel work
  • Fabrication and installation of liners, coal feeder casings, sugar cane feeder table, screw conveyor, bagasse feeder drum, pump
  • Gear boxes and electric motor bases
  • Fabrication, site modification and installation of cable racks, bends and offsets for electrical and instruments, supports for DB boxes, supports for cable rack
  • Fabrication and assembling of GHH mining equipment, LHD buckets, booms, Utility Vehicles
  • Carrying out preventive, planned and routine maintenance on plant, pipes, crushers, chutes, furnaces, boilers, boiler burners, classifiers, liners, vibrating screens, mining equipment (LHDs, UVs, rigs,)
  • Manual metal arc welding, brazing
  • Workshop and plant safety
  • Complete and evaluation of reports and sketches

Timeline

PlantsMan TeamLeader

Afrimat
12.2024 - Current

Maintenance Boilermaker

Afrisam
03.2023 - 11.2024

Workshop Boilermaker

JCB Gearvest
11.2021 - 02.2023

Maintenance Boilermaker

BMI Electrical
02.2019 - 03.2020

Maintenance Supervisor

Fraser Alexander
05.2018 - 01.2019

Anglo Platinum Maintenance Supervisor

HML Engineering
01.2016 - 02.2018

Maintenance Boilermaker

Anglo Platinum Mine
07.2015 - 12.2015

Boilermaker Maintenance

Actom
07.2014 - 06.2015

Boilermaker Construction and Apprentice

Murry & Roberts
07.2012 - 05.2014

Trade Certificate - Section 26D, Red Seal

Tlhahlong Training Centre
04.2001 -

Associate of Engineering - N2, N3, N4, N5, N6

Lephalale TVET College
04.2001 -

Phase 1-5 - Gijima

Tlhahlong Training Centre
04.2001 -

National Senior Certificate - Mathematics and Physical Science

Waterberg High School
Marks LebeloPlantsMan(Technical Technician)