Summary
Overview
Work History
Education
Skills
References
Interests
Custom section
Software
Timeline
Generic
Malusi Linda

Malusi Linda

Quantity Surveyor
Durban

Summary

With nearly 15 years of experience as a Quantity Surveyor in the Construction industry, specializing in Civil, Building, and Infrastructure Projects. Approach characterized by humility, hard work, patience, commitment, dedication, ambition, and innovation. Analytical and strategic thinker who thrives on self-motivation and independence. Unafraid to take risks to achieve optimal results. Consistently delivers best work while fostering strong relationships with colleagues. Eager to collaborate with a team of experts to further develop skills and contribute meaningfully to society. Dedicated to excelling in Civil Engineering and staying abreast of latest advancements.

Overview

16
16
years of professional experience

Work History

Quantity Surveyor

Stefanutti Stocks
02.2024 - Current


  • CONSTRUCTION OF SHONGWENI WASTE MANAGEMENT FACILITY FOR ENVIROSERV - R133 992 185 Million


  • Collaborated with architects and engineers to optimize construction designs, minimizing material waste and reducing overall costs.
  • Developed comprehensive cost plans to guide project execution, ensuring financial efficiency and success.
  • Managed subcontractor relationships by setting clear expectations, maintaining open communication channels, and addressing concerns promptly.
  • Implemented cost control measures throughout projects'' lifecycle, minimizing financial risks associated with scope changes or unforeseen events.
  • Generated cost and value reports to produce accurate information on cash flow.
  • Provided guidance and mentorship to junior quantity surveyors, fostering a supportive team environment that facilitated professional growth.
  • Ensured compliance with relevant regulatory requirements by staying informed on changes to building codes, environmental regulations, and other pertinent industry standards.
  • Evaluated supplier performance against established criteria, driving continuous improvement initiatives within the supply chain network.
  • Worked with 21 vendors to select and source construction materials.
  • Reviewed all consultant drawings and made recommendation to adjust site requirements.
  • Ensured accurate invoicing by reviewing contractor claims for compliance with contract terms and conditions before submission to clients.
  • Conducted regular site visits to monitor progress, identify potential issues, and recommend corrective actions as needed.
  • Performed measurements for structural and architectural works to prepare cost estimates for projects.

Quantity Surveyor

Khavhakone Construction
06.2023 - 01.2024
  • CONSTRUCTION OF BULK INFRASTRUCTURE FOR WILD COAST SEZ PHASE 1- R48 936 999.13 Million
  • Used CANDY to prepare contracts, budgets, bills of quantities and FIDIC documents.
  • Reduced budget overruns by accurately forecasting project expenses and monitoring progress against budget allocations.
  • Reviewed all consultant drawings and made recommendation to adjust site requirements.
  • Facilitated smooth handover processes between stakeholders by preparing detailed final account statements reflecting actual expenditures versus initial estimates.
  • Managed and coordinated cost, availability and timely delivery of materials and project schedules for suppliers.

Quantity Surveyor / Estimator

Specialized Construction and Civil Works (SCCW), Durban
02.2020 - 05.2023
  • Independent Development Trust
  • INDEPENDENT DEVELOPMENT TRUST : Construction of Ntikili Primary School in Mtubatuba Contract Value R60.2 million.
  • DBSA TURNKEY PROJECTS: Storm damages, Repairs and upgrades to 4 number of schools (Cluster): Mbhekwa, Siyeza, Velabusha and Vezukuca Contract Value R33.8 million.
  • INQUZA MUNICIPALITY: Construction of Lusikisiki Driving License Testing Centre Contract Value R27.3 million. Elangeni College (Pinetown ):- The Refurbishment of Elangeni college Pinetown Campus Centre Contract Value R19.5 million.
  • DEPARTMENT OF PUBLIC WORKS: Construction of Magistrate Court Facilities for people with disabilities (Verulam and Hammarsdale Court) Contract Value R6.6 million.
  • TRANSNET DURBAN: Storm damage repairs and reinstatements of existing buildings Contract Value R11.4 million
  • Responsibilities
  • Ensure building projects remain within budget
  • Prepare and analyse the cost of tender
  • Claims and Dispute management and Forecasting the costs of different resources needed for the project.
  • Provide cost and material estimates, draw up projected budgets, and work alongside a team, noting any design changes and their effect on cost
  • Prepare tender and contract documents, including Pricing of bills of quantities
  • Evaluate tenders from contractors and subcontractors and, where appropriate, negotiate with the contractors Control all stages of projects within predetermined budget and expenditure.
  • Monitor and keep track of project progress and are responsible for the measurement and valuation of variations in the work during the contract, for agreement of interim payments and the final account.
  • Work as part of a team to ensure that the requirements of the client are delivered.
  • Carry out monthly valuations of work in progress, including forecasting of final costs and sales
  • Ensured accurate invoicing by reviewing contractor claims for compliance with contract terms and conditions before submission to clients.


Quantity Surveyor

CMC Di Ravenna, Durban
11.2015 - 11.2019
  • SANRAL Mount Edgecombe Interchange (KZN)– Quantity Surveyor for the construction of the R1.2 billion (US$85m).Interchange including longest incremental launch bridge in RSA, prestressed (post-tensioned) bridges, retaining walls and access ramps on national highway N2. The Mt Edgecombe project has won the concrete society ‘Fulton’ Awards 2017 for the best infrastructure project; it is recognized as the longest incrementally launched bridge not only in South Africa, or even Southern Africa, but of the Southern Hemisphere.
  • Responsibilities
  • Measuring and agreeing quantities for Earthworks, Road works, Pilling, Dynamic Compaction, Bridge Structures, Soil Nail Retaining Walls, Mechanically Stabilized Earth Walls, Median Barrier Walls and Reinforced Concrete Walls.
  • Preparation of monthly valuation with the Engineer for CMC.
  • Inspection and preparation of subcontractor’s certificate and Final Accounts.

Project Manager / Quantity Surveyor

Melki Civils, Durban
08.2011 - 10.2015
  • EThekwini Municipality (KZN) - Quantity Surveyor for the construction of R93 million Re-gravel and Blacktop roads including storm water drainage in the South Coast of Durban areas and West region.
  • EThekwini Municipality (KZN) - The construction of R21 million ILovu Landfill site and Weighbridge in the South Coast of Durban.
  • Mnquma Local Municipality (EC) - The construction of R5.5 million Regravel roads including storm water drainage in Mdange, Cwebeni and Toboshane under Eastern Cape Province.
  • Medupi Power Station Eskom (Lephalale)- The construction of R10.5million, Main Water Pipeline for the Medupi Power Station.
  • SANRAL Reddersburg (Free State) - The construction of R70 million, Roads & Earthworks contract involves the rehabilitation and widening of the 40.3km of the N6 road between Reddersburg and Paryshoogte, also known as the “Friendly Route .
  • Department of Health (Northern Cape)- The construction of R9.3 million for the Hospital Earthworks, storm water, road works and pavement in Kimberley Mental Hospital Moqhaka Municipality (Free State) - Quantity Surveyor for the construction of R3 million Earth Dam for the municipality.
  • Ukuza Consulting Engineers (KZN)-The construction of R4.7 million Harding Corner Shopping Centre (Civil works).
  • Ekurhuleni Municipality (Johannesburg)- The construction of R2.3 million, Earthworks, storm water, road works and pavement in Zonkizizwe Fire Station (Vosloorus)
  • Exxaro Mine (Mpumalanga Prov.) - Quantity Surveyor for the construction of R1.3 million, Temporary gravel roads for the mine
  • Responsibilities
  • Liaising with clients to identify their needs
  • Monthly cost reports
  • Estimating quantities, costs and time scales for material and labour
  • Preparing tender and contract documents
  • Identifying and weighing up commercial risks
  • Assigning work to subcontractors
  • Valuing completed work, managing budgets and overseeing payments
  • Ensuring projects meet legal and quality standards
  • Ensuring that clients get value for their money
  • Advising on the maintenance costs of specific buildings
  • Submitting regular budget reports
  • Following building regulations and health and safety
  • Working at a client’s business, in an office or on a construction site.

Works Inspector / Quantity Surveyor

Mkhulu Housing, Port Shepstone
01.2010 - 07.2011
  • NHBRC (KZN) – Works Inspector for the construction of R150 million, Government Low Cost Housing in Sangcwaba Rural Development.
  • NHBRC (KZN) – Works Inspector for the construction of R79.5 million, Government Low Cost Housing in Nodunga Rural Development
  • NHBRC (KZN) – Works Inspector for the construction of R3.5 million, Government Low Cost Housing in Jolivet Rural Development
  • Responsibilities
  • Daily measuring value of work done
  • Procurement of material
  • Attending site technical meetings and reporting to the Senior QS
  • Preparing monthly valuation and liaise with the professional QS
  • Re-measuring for final account
  • Preparing certificates for subcontractor
  • Fuel consumption - daily diesel usage
  • Made and submitted reports detailing finding and any actions taken.
  • Documented recurrent issues and worked with contractors to prevent re-occurrence.
  • Noted violations and issued documentation such as stop work orders to contractors or owners.
  • Completed inspections of current construction, refurbishment and repair projects.
  • Re-inspected commercial and residential constructions which previously failed inspections.
  • Facilitated timely project completion by closely monitoring progress and addressing issues as they arose.
  • Coordinated with other inspectors in the department to ensure consistent application of building codes and standards across all projects.
  • Improved inspection efficiency with the implementation of a streamlined scheduling system.
  • Developed strong relationships with local government officials, enhancing collaboration on building regulation enforcement efforts.

Education

National Diploma - Construction Management & Quantity Surveying

Mangosuthu University of Technology
Durban, South Africa
04.2001 -

Skills

  • Microsoft

Cost estimation

Bill of quantities

Cost planning

Cost control

Cost-benefit analysis

Building regulations

Budget planning

Cash flow forecasting

Contract support

Interpersonal skills

Project management

References

Lwazi Msani, Vangisa Group, lwazi@vangisap.co.za, 07665178634


Lethabo Morolo, SMEC South Africa, lethabom@smec.co.za, 0729145106


Bernard Oslo, WBHO, oslob@gmail.com, 083282 1406

Interests

WinQs, CCS and CAD

Custom section

JBCC, GCC, COLTO and FIDIC Construction Documents, Drafting and Approval of New scope of work including VO’s or estimates, Project management from commencement to completion, Cash flow or budgets reports.

Software

Candy

Buildsmart

Timeline

Quantity Surveyor

Stefanutti Stocks
02.2024 - Current

Quantity Surveyor

Khavhakone Construction
06.2023 - 01.2024

Quantity Surveyor / Estimator

Specialized Construction and Civil Works (SCCW), Durban
02.2020 - 05.2023

Quantity Surveyor

CMC Di Ravenna, Durban
11.2015 - 11.2019

Project Manager / Quantity Surveyor

Melki Civils, Durban
08.2011 - 10.2015

Works Inspector / Quantity Surveyor

Mkhulu Housing, Port Shepstone
01.2010 - 07.2011

National Diploma - Construction Management & Quantity Surveying

Mangosuthu University of Technology
04.2001 -
Malusi LindaQuantity Surveyor