Proven Mechanical Engineer with a track record of enhancing system performance and reliability at Glencore Lion Smelter. Excelled in project management and mechanical system design, achieving significant cost reductions and productivity enhancements. Skilled in Maintenance Planning, Lifting and Rigging Study and fostering continuous improvement, demonstrating leadership in cross-functional team collaboration and innovative problem-solving.
: Coordinated with other departments such as procurement, logistics, and quality control to streamline interdepartmental communication and collaboration efforts effectively.
: Improved product quality with the development of robust testing procedures and implementation of corrective actions.
: Performed thorough risk assessments before executing projects, minimizing potential hazards or delays during implementation phases.
: Developed engineering solutions for complex technical problems, enhancing overall system performance and reliability.
: Developed engineering solutions for complex technical problems, enhancing overall system performance and reliability.
: Generated system concepts to satisfy product requirements.
: Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
: Increased production efficiency by designing and implementing process improvement strategies in mechanical operations.
: Collaborated with cross-functional teams to identify opportunities for cost reduction, achieving significant savings without compromising on quality.
: Evaluated existing systems for energy efficiency improvements, leading to decreased operating costs while maintaining environmental responsibility.
: Designed innovative mechanical components, leading to increased customer satisfaction and repeat business.
: Optimized manufacturing processes through continuous improvement initiatives, resulting in enhanced productivity and operational excellence.
: Conducted root cause analysis to troubleshoot equipment issues and implemented preventive maintenance programs, reducing equipment downtime significantly.
: Established strong relationships with suppliers and vendors to ensure timely delivery of materials at competitive prices.
: Provided technical expertise during project planning phases, contributing to the successful execution of large-scale engineering projects.
: Reduced downtime with implementation of predictive maintenance program for critical production equipment.
: Oversaw installation and commissioning of machinery, ensuring compliance with both safety and operational standards.
: Fostered culture of continuous improvement, encouraging feedback and innovation within engineering department.
: Developed technical documentation to standardize engineering procedures, promoting consistency across projects.
: Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
: Reduced downtime for critical assets by developing and implementing comprehensive maintenance plans.
: Developed maintenance reports to assess program success and inform operational decisions.
: Conducted risk assessments on critical assets to prioritize required maintenance activities accordingly.
: Performed root cause analyses on recurring equipment failures, identifying potential solutions to prevent future occurrences.
Sap knowledge
: Experience on smelter operation Furnace
: Completed Furnace A and B Rebuild
: Good supervision and I am self-motivated
: Knowledge and experience of Condition Based
Monitoring and RCM
: Computer Literacy and English communication
: Sap PM Strategy
: Manage Running Cost
: Shutdown Planning and Planned Maintenance
: Breakdowns with minimum downtime
: Develop and review maintenance plans
: Knowledge of Route cause analysis
: Knowledge Management of Change
: Managing and controlling rigging store
: Installing temporary life lines
: Statutory lifting equipment inspection
: Inspections on overhead cranes
: Planning of furnace rebuilt lifting equipment
: Recovery of TMM in the plant
: Rigging and lifting activities across the plant
: Inspection on mobile cranes
: Furnace rebuilt critical lifting and rigging
: Acting coordinator when required
: Acting planner when required
: Compliance of lifting equipment and lifting
Machines
: Operate telescopic boom handler (Manitou)
: Operate mobile elevated working platform
: Operate overhead cranes
: Ordering lifting equipment and spares
: Ordering external mobile crane services
: Increased workplace safety by conducting regular rigging inspections and equipment maintenance.
: Rigged for heavy lifts according to blueprint requirements.
: Determined correct rigging requirements for equipment based on job specifications and environmental conditions.
: Enhanced team productivity through clear communication with colleagues regarding job assignments and expectations.
: Decreased potential hazards by promptly addressing any identified risks or issues related to rigging activities.
: Worked at heights and in confined spaces without difficulty.
: Ensured compliance with OSHA regulations by implementing safe work practices at all times during rigging operations.
: Improved lifting efficiency with proper selection of rigging equipment for specific tasks.
: Developed a strong understanding of rigging principles, enabling the accurate interpretation of blueprints and diagrams related to load handling activities.
: Contributed to successful project completions by consistently meeting deadlines and adhering to budget constraints.
: Assisted in the development of lift plans, considering factors such as load weights, rigging capacities, and crane positioning.
: Demonstrated leadership abilities in overseeing small teams of junior riggers during complex lifts on major construction projects.
: managing and controlling rigging store
: Inspection and tagging lifting equipment
: Inspection on lifting machines overhead cranes
: Derailment recovery up to 120tons
: Shutdown planning
: Locomotive recovery (derailment)
: Operate mobile crane center mount 27tons
: Acting foreman on time to time bases
: Furnace rebuild supervision
: Structural steel erection
: Structural team leader
: Interpreting structural drawing to the team
: Reaching target as pre tons of the day
: Managing and controlling site rigging store
: Inspection and tagging of lifting equipment
: Lifting structural pre-assemble op to 400tons
: Tandem lifts and super lifts
: Compliance with OSH act and DMR section 18
AutoCAD