Experienced Civil Engineering Technologist with a strong background in infrastructure design and project management. Proficient in contributing to the success of civil engineering projects, particularly in urban development and transportation systems. Skilled in utilizing AutoCAD software, Civil Designer Program and coordinating with multidisciplinary teams to achieve project goals. Committed to delivering high-quality work and ensuring efficient execution of engineering projects.
Roles and Responsibilities
Professional liaison with Clients / new Clients, Prepare input for submission of tenders for new projects: proposals & fees / cost estimates, Carry out design assignment throughout various stages in terms of Government Gazette, Inception - project scope and risks identify, Concept and viability (Preliminary planning), Report Writing - quality and comprehensive, Competency with design programs (availability of software), Design Development - experience understanding and quality, Comprehensive and Quality of drawing and Bills of Quantities, Contract Documentation and Procurement, Co-ordinate all design related requirement including other services, for example:, Environmental approvals, Topographical and cadastral surveys, Geotechnical investigations and testing, Various permits required in terms of legislation, Land Ownership matters, Conduct contract administration (eg minutes and payment certificates) and site inspections as required on part time basis., Includes monthly report to and project close out.
Projects Undertaken
·Portion 6 Florida Heights Integrated housing Development – I designed and drew the Bulk water and sewer details, such as valve chambers, Pump Stations, thrust blocks and typical road crossings (2020) R37.98m
· Nooitgedagt Coega Low Level Scheme Phase 3 – I was assistant Resident Engineer to the construction of the new flash mixer, settling tank, filter and the Clear Well along with its relevant pipework.(2020).R121.8m
· Nooitgedagt Coega Low Level Scheme Phase 3 – I was the project manager of the Pipeline Rehab, AC mitigation and Cathodic protection. R36.4m
· Kasane Water Treatment Works – I designed the water and sewer reticulation for staff cottages. (2020)
· Cameroon Hospital – I designed the water and sewer reticulation for the hospital, along the cost estimate for the job. (2020)
· Moshupa Sanitation Scheme – I did the cost estimate for Zone 7 and 8. (2020)
· Connection of Tswapong South Villages to Mahalapye Phase 2 – I designed the bulk water connection from the Mahalapye Treatment Works to the south villages (2020)
· Design and Construction of internal water and sewer, roads and stormwater reticulation, parking and building platforms, 144 high density units at Alexandra EXT 52 within the City of Johannesburg Metropolitan Municipality, Gauteng Province – I designed the all civil services of the building. (2020)
· Baywest Village on Walker – I designed the Sewer reticulation (2021) R19m
· Bayworld Develoment :Upgrading and Creation of Bayworld Sanctuary and Park – I compiled the tender document and the cost estimate for the project.(2021) R17m
· Baywest Village on Walker – I designed the stormwater reticulation (2021)R19m
· Rehabilitation of Concordia Road – I inspected, monitored and managed the construction of the Bus Shelters and speedhumps in Concordia Roads(2023)R8.5m
· Portion 6 Florida Heights Integrated housing Development – I designed the platforms for the apartment buildings (2020) R37.98m
Projects Undertaken
· The Coegakop Reservoir RE scheme Completion Project – I am the Assistant
Resident Engineer(2018/2019). R18.20m
· Kouga Waste Management and Recycling Project – Assistant Resident
Engineer(October 2015 – January 2016) R15m
· For the Flood damage repairs on Provincial surfaced roads in the Ndlambe
Municipal Area – Resident Engineer(February 2016 – October 2016) R7.2m
· Coega Sanitech Services – Resident Engineer (April 2017 – June2017) R500k
· The Coegakop Reservoir RE scheme Completion Project – I am the Assistant
Resident Engineer(2018/2019). R18.2m
· Nooigedagt Coega Low Level Scheme Phase 3– I was an assistant resident engineer kjo(2020) R140m
Projects Undertaken
· Beautification: Irrigation Effluent from Cape Recife(Port Elizabeth) – I designed a
water line for irrigation from Cape Recife to the harbour area.(2010) R35m
· Housing Development Hankey 350 units - I designed a water and sewage
reticulation network for a portion of the area.(2010) R5.5m
· Makana beautification(Grahams Town) – I designed the sewerline, of Caretaker’s
cottage and changing rooms, connecting to the existing sewer manhole.(2010)
R9.5m
· Opera house Repairs, Renovations and Extensions(Port Elizabeth) – I designed
a sewer line, from the new building, connecting to the existing line.(2012) R30m
· I have designed the sewer reticulation for the Proposed Vulindlela Mall in Port
Elizabeth.(2013) R13m
· Coega Sanitech services – I designed the water and sewer reticulation of the
facility.(2017) R500k
· Construction of the ECD center for Queenstown school in cluster B – I designed
the water and sewer reticulation. (2017) R46.3m
· Opera House Repairs, renovations and extensions(Port Elizabeth) – I designed
a fire escape route along with a new stormwater route.(2012) R30m
· Ingleside Estate Development Phase 1(Port Elizabeth) – I designed catchments
for stormwater.(2011) R6m
· Metrowind farm (Port Elizabeth) – I designed the road, along with the stormwater,
for the truck bringing in, the equipment(2011) R140m
· TB Hospital upgrade -I designed the stormwater layout for the Jose Pearson(Port
Elizabeth) and Majorie Parrish (Port Alfred) (2013) R12m
· Coega Sanitech services – I designed the unsurfaced driveway to the
Facility(2017) R500k
· Portion 6 Florida Heights Integrated housing Development - I designed the
roads. (2017) R37.98m
· Kariega and Kap River Causeway – I compiled the tender document(2017)
R22m
· Metrowind farm(Port Elizabeth) – I designed platforms for the turbines(2012)
R140m
Project Undertaken
Koukamma Local Municipal areas in the Cacadu District(Humansdorp) –
Resident Engineer for the project (February 2014 – October 2015) R18.12m
Project Undertaken
reticulation for phase 2(2007) R14.16m
sewage reticulation(2009) R6m
water line for irrigation from Cape Recife to the harbour area.(2010) R35m
reticulation network for a portion of the area.(2010) R5.5m
cottage and changing rooms, connecting to the existing sewer manhole.(2010)
R9.5m
stormwater pipes for phase 1(2007) R6m
design of the stormwater.(2007) R15.5m
the route for cyclist to travel to the stadium during the soccer worldcup.(2009)
R7m
development zone(2007) R7m
for the project(2009) R12m
Construction scheduling
Site inspections
AutoCAD proficiency
Cost estimating
Project scheduling
Civil design
Project management
Professionalism
Geometric design of Urban and Rural Roads(2010)