Summary
Overview
Work History
Skills
High School Education
Formal Qualifications
Personal Information
References
Certification
Timeline
Generic
Lucky Seboko

Lucky Seboko

Site Supervisor, Expeditor, Material Controller,Project Coordinator
Johannesburg

Summary

Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. I hold PMBOK and LEAN Manufacturing Experience as well as multi-project experience in various industries including; Structural Steel, Engineering, Aviation, Mining as well as Cathodic Protection. I possess vast experience in Planning, Quality inspections, Expediting, Logistics and Project Management and Fuel management. I have had the opportunity to work on the following projects: Medupi, Kusile, Airbus A400mGermany Cargo, Mumi & Kolwezi Mines (DRC) Kwale Sands Mine (Kenya). Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

13
13
years of professional experience
6
6
Certifications
1
1
Language

Work History

Site Manager (Fuel and Lubrication)

Zenzele Lubrication (Wescoal Mine Mpumalanga and Moabsvelden Mine)
Delmas, Mpumalanga
09.2020 - 10.2022
  • Responsible for the daily running of the Diesel Bays
  • Compiling and updating financial records daily and monthly for both mines
  • Ensuring all Heavy machinery had sufficient diesel for each shift
  • Stock and Quality control
  • Leave processing and payroll administration
  • Ensuring compliance to Health, Safety and Environmental standards
  • Forecasting and Planning Staff training Tanks and Fuel management Managing financial expenditures for Wescoal Mine and Moabsvelden Mine Managing projects between the two mines
  • Kept sites compliant with OSHA, DMR, and local regulations to prevent unnecessary incidents.
  • Interviewed, hired, and trained new workers.

Project Planner and Administrator

Cathtect Engineering (PTY) LTD
Rooderport, Johannesburg
08.2018 - 02.2019
  • Creating project plans
  • Outsourcing different suppliers
  • Compiling data books
  • Reporting directly to the CEO
  • Evaluating and recommending corrective action to ensure that the material arrives on site in accordance with the contractual and project schedule requirements and spec
  • Forecasting delivery lead times
  • Organising tools and supplies
  • Linking and sequencing all activities to develop overall project schedules
  • Liaising with the workshop regularly to assure that progress is as scheduled
  • Determining/ estimating durations required to complete site installations
  • Compiling monthly company financial report and present it to the CEO.

Steel Mechanical Expeditor

Murray And Roberts- Kusile Power Station
Witbank, Mpumalanga
08.2016 - 07.2018
  • Ensuring that material and equipment is identified, procured, fabricated, delivered and is available in time for construction/erection on site
  • Planning, facilitating, directing and managing the inspection and verification processes before and after delivery
  • Forecasting delivery dates and changes are promptly input into streams and project schedules in conjunction with the project planner and project manager as well as the procurement officer
  • Giving feedback to senior Construction manager as well as Senior Project Manager
  • Evaluating and recommending corrective action to ensure that the material arrives on site accordance with the contractual and project schedule requirements and spec
  • Forecasting delivery lead times
  • Decision making on sub-standard parts (Rework/Destroy)

Production Supervisor & Expeditor

Bravo Sleep Products (BSP)/Sealy
Rooderport, Johannesburg
07.2015 - 07.2016
  • Responsible for the day to day running of production processes throughout the manufacturing process
  • Making sure that the production line runs smooth and that the staff meet their daily/weekly targets and motivating the team
  • Planning and organising staff shifts and tasks
  • Reporting plant or machinery breakdowns to technicians Organising external labour, also involved in the interviewing and disciplinary processes
  • Organising tools and supplies
  • Stock and Quality control
  • Compiling management reports on daily performance
  • Identifying individuals that need further training
  • Processing leave days
  • Ensure that all health and safety rules are always adhered to.
  • Warehouse Control and Supervision

Project Coordinator (A400MGermany Military Cargo-Airbus

Aerosud Aviation
Centurion, Pretoria
05.2013 - 06.2015
  • Production planning
  • Forecasting delivery lead times
  • Launching parts/components for production
  • Approving components that need to be built
  • Providing workshop managers and supervisors with lists of parts to build to reach our weekly/monthly targets
  • Updating the client on the progress and delivery of shipment

Whenever required by the client (Airbus Germany)

  • Solving daily production problems that arise in the workshop
  • Decision making on sub-standard parts (Rework/Destroy).
  • Liaised between departments to facilitate communication and keep appropriate parties updated on project developments.
  • Supervised multiple projects from project start through delivery by prioritizing needs and delegating assignments.

Expeditor

Redis Construction Afrika
Bedfordview, Johannesburg
06.2012 - 02.2013
  • Outsourcing and picking of a reputable supplier that delivers on time and the pricing is reasonable
  • Visiting the supplier regarding orders placed
  • Conducting visual inspection of parts/material before delivery to site
  • Ensuring the supplier is paid as per contract stipulations
  • Ensuring that the final product is delivered on time and according to specification
  • Projects worked on Mumi and Kolwezi mines (DRC) Kwale Sands mine (Kenya)

Quality Control Clerk

Murray And Roberts Genrec Eng (PTY) LTD
Wadeville Johannesburg
03.2010 - 02.2011
  • Issuing approved drawing to boiler makers and Q.C inspectors
  • Compiling Data Packs for Hitachi/Eskom final inspection
  • Generating Acceptance Reports (AR’s) and Barcode Labels
  • Signing for and accepting approved final packs from Eskom
  • Monitored product standards and quality-control programs.
  • Provided regular updates to team leadership on quality metrics by communicating consistency problems or production deficiencies.

Skills

Fully computer literate in MS Word, Internet research, Excel Spread sheets, MS Outlook, Enterprise Bridge (EB), Strum IS, SFDC and Smart-Team, Syspro, SPF Smart Plant Foundation Build Smartundefined

High School Education

Thuto - Tiro High School Sebokeng, 2004, Matric

Formal Qualifications

  • N3 Public Administration, Sedibeng College of F.E.T, 2005
  • N4 Marketing Management, Sedibeng College of F.E.T, 2006

Personal Information

  • Nationality: South African
  • Driving License: Code 08

References

Available on request

Certification

N3 Public Administration

Timeline

OSH Act and Legal Liability

06-2021

Site Manager (Fuel and Lubrication)

Zenzele Lubrication (Wescoal Mine Mpumalanga and Moabsvelden Mine)
09.2020 - 10.2022

Project Planner and Administrator

Cathtect Engineering (PTY) LTD
08.2018 - 02.2019

Competition Law and Complience

08-2017

Steel Mechanical Expeditor

Murray And Roberts- Kusile Power Station
08.2016 - 07.2018

People Management and Supervisory

04-2016

Problem Solving & Decision Making

03-2016

Production Supervisor & Expeditor

Bravo Sleep Products (BSP)/Sealy
07.2015 - 07.2016

Project Coordinator (A400MGermany Military Cargo-Airbus

Aerosud Aviation
05.2013 - 06.2015

Expeditor

Redis Construction Afrika
06.2012 - 02.2013

Quality Control Clerk

Murray And Roberts Genrec Eng (PTY) LTD
03.2010 - 02.2011

N4 Marketing Management

06-2006

N3 Public Administration

02-2005
Lucky SebokoSite Supervisor, Expeditor, Material Controller,Project Coordinator