Mechanical, Manufacturing and Projects Engineer seeking position in a firm to utilize 10 years of experience in designing, developing, testing and evaluating integrated systems for managing production and increase firm’s output
Overview
10
10
years of professional experience
8
8
years of post-secondary education
Work History
Service Project Engineer
GEA Africa Pty Ltd
02.2021 - Current
Formalize a detailed proposal based on the client’s requirements, best practices & providing a well-engineered solution on Industrial Ammonia plants
Conduct project Sales i.e
Meeting with clients, establishing their requirements, developing a solution, costing the engineering scope, developing proposals, presentations, etc
And then presenting & negotiating the proposal with the client(s)
Review solution and engineering for SANS compliance, engineering principles, GEA standards, client contract requirements and related specifications
Conduct and arrange plant surveys to establish current installed equipment and to identify areas of improvement
Promote the GEA brand and values
Coordinate preparation and delivery of project deliverables, engineering, operating & maintenance documents
Plan and implement a project program, including defining the project philosophy, activities, milestones, and resource requirements, as per the project & client requirement
Evaluate engineering changes, specifications and drawing releases and update accordingly with the drawing and technical department
Controlling external contractors in order to fulfill the task at a client site taking all Health & Safety specifications into account
Keep track of ETA’s, equipment delivered, and material required in order to meet deadlines
Coordinate preparation and delivery of project deliverables, design, operating, and maintenance documents based on sales contract
Monitor quality of work carried out on site and ensure quality assurance of external contractors
Prepare project completion documentation as hand over for client acceptance
Ensure that pre-start up documentation and commissioning reports are completed by commissioning staff
Monitor and report on sales & project statistics
Follow up and ensure that the invoicing and administrative closing of projects are completed
Ensure that commissioning is done to GEA standards and within the performance requirement as per the sales contract
Identify additional business opportunities.
Project Engineer
GPWG Engineering PTY LTD
10.2019 - 01.2021
Projects Manager
WANGA POWER PROJECTS
06.2013 - 09.2019
Projects:
Design, Repair and Maintenance of HVAC, Fire Suppression, Plumping Systems and Electrical works for Free State Provincial Buildings (Fidel Castrol, O.R Tambo and PACOFS
04.2016 - 03.2019
Managing a team of plumbers and electricians to ensure all installations are carried out on time and with quality
Procurement of resources and materials for the projects
Communicating with all stakeholders involved in the projects
Preparation of invoices for submission to client monthly
Business development within the region and ensuring organizational growth.
10.2015 - 09.2018
Repair and maintenance of Chillers, air handling units, cooling towers, extraction fans, VRVs, Pumps, Split unit air conditioners, Ducting, Fan Coil Units and BMS controls for Domestic, CTB, Cargo and International Terminals
Ensure service of all HVAC equipment monthly
Conducting daily plant room checks for all equipment serviced
Arranging meetings with client on investigations
Ensuring of safety standards are met as required by Airports Company of South Africa (ACSA)
Preparation of monthly service reports to client and management
Processing of work orders and Preventive Maintenance reports
Managing project administration
Managing projects risks including development of contingency plans to meet project milestones
Liaison with projects clients to assure the overall direction and integrity of the project
Engaging and managing subcontractors on site
Managing and coordinating of 6 site technicians and 20 site assistant technicians to ensure maintenance and repairs are carried out as per the maintenance plan
Project Value: R 54 157 000.90
Retrofitting, designing and upgrading of pump stations and water treatment works within Builtfontein and Hoopstad
08.2017 - 07.2018
Directing, managing, and motivating the project teams
Refurbishment of ductwork, air handling units and circulating pumps
Installation of new split unit air conditioners, cooling towers, secondary hot water pumps, diffusers, grilles, and insulation of ducting
Installation of extraction fans and fire sprinkler system controls
Installation of new Variable Speed Drives for all the air handling units
Procurement of materials, tools, and equipment for project teams
Ensure safety, health and environmental standards are followed and implemented on site
Conducting weekly progress meeting on site with Engineers and Client
Preparation of drawings for any changes made during execution using Revit and AutoCad
Preparation of the project plan and controlling of costs
Preparation of progress reports to management
Project Value: R 9 046 845.67
Repair, Maintenance, and Installation of HVAC equipment at O.R Tambo International Airport
Project duration: 3 Years
06.2013 - 05.2017
Preparation of detailed designs, analyses, tender drawings, schedules of quantities, contract documents, project cost estimates, project schedules and project implementation plans
Preparation of conceptual reports which will include preliminary designs and analyses, drawings, cost estimates, project schedules and project implementation plans
Ensure the project's compliance with the applicable codes, practices, policies, performance standards and specifications
Develop specifications for the projects required equipment
Formulating project parameters and assigning responsibilities to the most suitable employees and monitoring the project team
Performing quality control tasks on budgets, schedules, plans, and team performance and reporting on project status
Repair and Maintenance of chillers, boilers, air handling units, compressors, pumps, valves, thermometers, hygrometers and cooling towers
Installation of pumps and cooling coils
Installation of new room temperature controls for fan coil units for Fidel Castrol Building
Maintenance of controls and BMS for Free State Buildings
Installation fire water pumps, sprinklers, sensors and piping works
Modification of dual duct mixing boxes from pneumatic controls to low voltage electronic controls for O.R Tambo saving energy by 40%
Plumbing and Electrical repairs for both buildings
Ensure safety of project teams on site through daily toolbox talks
Managing and coordinating a team of technicians as well as electricians to ensure jobs are completed with quality
Drafting all Standard Operation Procedures on all tasks to be executed on site and submit to SHEQ department for review
Fleet management of all vehicles on site
Preparation of Invoices and Payment Certificates for submission to client
Procurement of tools, equipment, and materials to be used on site as well control of movement of materials and tools
Overall cost and management of the project
Ensuring all works are executed with quality through daily checks and quality tests
Preparing, maintaining project stage and execution plans as required
Project Value: R 12 573 865.66
Installation of water-cooled chillers and air handling units at National Metrology Institute of South Africa (NMISA)
Project duration: 6 Months
Duties:
Planning and execution of all project activities
Procurement of Chillers, Air Handling Units, pipes, valves and make up tank
Installations of chillers, air handling units, water pipe work and associated electrical works
Ensuring site safety of project teams
Conducting weekly and monthly meetings with the client
Reporting on progress on site to management
Drafting of Service Level Agreements to client for approval
Managing and coordinating the installation team to ensure the project is carried within the allocated timelines
Project value: R 4 699 567.00
Refurbishment of HVAC equipment at Eskom Academy of Learning
12.2015 - 11.2016
Installation of 8 new centrifugal water pumps
Installation of new control panels for pumps
Refurbishment of sand filters, chlorine dosing system as well as backwash system
Repair of 4 clarifiers
Repair of water treatment plant
Replacement of all gate valves on the water reticulation system
Installation of telemetry system between the waste water pump house and the booster pump station
Ensuring safety standards are maintained on site through implementation of safety site diaries, through risk assessments and awareness
Monitoring overall progress and use of resources, initiating corrective action where necessary
Conducting weekly meetings with client on progress on site
Preparing progress reports, cost analysis and updates for Management to review
Fleet management of site vehicles on site
Reporting through agreed lines on project progress through highlights reports
Procurement of materials, equipment and tools to be used on the project
Resource allocation and management
Managing team members of the project and other resources
Project Value: R 17 864 970.58
Moqhaka Local Municipality High Mast Lights and Water Meter replacement as and when required
01.2021 - 1 1
Duties and Responsibilities
Develop and define project goals and objectives
Preparation of QCPs for submittal to clients
Preparing, scheduling, coordinating, and monitoring of assigned engineering projects
Determining client’s requirements and translating them into actionable plans
Prepare short and long-term resource allocation plans
Develop detailed task lists and work effort assessment
Manage the design team and act as link between client and the organisation
Develop and implement procedures, processes and systems to effectively manage resources, plans, and client expectations
Recommend and implement modifications necessary to attain project milestones
Interact daily with senior management to understand their needs and requirements
Identify changes in work scope and the project plan
Taking appropriate planning measures with all clients to reassess, renegotiate and amend scope of work responsibilities, proposals, contracts and budgets
Conveying required project data and information to project teams
Prepare and present regular internal and external project reports for management
Evaluate and analyze risks and issues compromising project results and develop plans to mitigate them
Responding to any client complaints, concerns, or requests throughout the project
Perform overall quality control of the work (budget, schedule, plans, personnel’s
performance) and report regularly on project status
Assign responsibilities and mentor project teams
Cooperate and communicate effectively with the Project Manager and other project participants to aid and offer technical support
Manage the project budget and other project resources
Manage Safety, Health, Environment (SHE) and overall quality expectations
Holding regular meetings to ensure, track and review overall project performance
Repair, Design, Installation and Maintenance of HVAC and Fire equipment at IDC Project Duration : 5, Project Value: R 26 560 000.00
Managing or supervising specialists and sub-contractors working with the company`s HVAC or other mechanical systems
Engineer and develop HVAC systems throughout the various stages of multiple projects
Ensure correct selection of equipment
Engineering design
Managing and coordinating of 4 site technicians and 8 site assistant technicians to ensure maintenance and repairs are carried out within allocated times
Communicating directly with internal customers to understand project requirements, goals, design specifications, and operational environments to evaluate cost, feasibility, and implementation of new equipment
Ensuring that all HVAC engineering deliverables are following the project and other relevant regulatory requirements while meeting approved specifications
Coordinate internal resources and third parties/vendors for the flawless execution of HVAC installation, design development and provide author supervision
Developing new energy efficiency solutions according to EVO standards
Consulting on HVAC system and equipment design for a wide range of projects, and work with other engineers, project managers, and construction professionals as needed to create and/or modify design parameters
Manage replacing and upgrading of the current system to meet the newly developed system requirements
Analyzing HVAC systems and equipment when necessary to find inefficiencies or malfunctions and create solutions to optimize performance and increase the efficiency of operation
Immediately notifying the persons in charge with the equipment and the users about any problem with the ventilation, cooling, water, power supply system’s etc
Analyzing all load programs and perform required calculations and manage all electrical requirements for HVAC and fire safety equipment and recommend improvements
Monitoring all resources and ensure optimal utilization for same and achieve all customer objectives and provide support to all equipment and perform calculations and implement various plans for HVAC
Research, design, and install control of HVAC mechanical equipment to meet client’s requirements in both large and small projects
Making an active contribution in the research and development efforts by understanding the HVAC advances that will match with the emerging technologies
Monitoring the execution of the developmental efforts and think of innovative ideas to build and design the HVAC system within the given budget and time
Maintain records on refrigerant recovery and recycling in compliance with Environmental Protection Agency regulations
Bidvest Facilities Management Projects
Pricing of RFQs and Tenders for various requests
Preparation of PIDs for various projects
Maintenance of Ammonia refrigeration plants for Telkom data centres
Ensuring execution of projects within budget and time once the Purchase Order is received
Designing and determining project scope, objectives and timelines within client expected completion times
Establishing communication and liaison schedule to update Client, relevant managers, stakeholders on project progress
Utilization and application of industry best practices, techniques, and standards throughout project execution
Exploring and recommending innovative methods, based on best practices, in order to bring about cost-effective solutions
Managing performance & conflicts within suppliers & effect corrective actions, in line with company policies/procedure
Managing and coordinating a team of six technicians and 12 Assistants to ensure operations are carried out effectively
Installations, Commissioning, Maintenance, Servicing and Repairs (fault-finding) on Industrial, Commercial and Domestic refrigeration systems
Installations, Commissioning, Maintenance and Servicing of Ducted systems, Split Units, Packaged Units, Cold Rooms, Freezer Rooms, VRV/VRF’S and AHUs on various sites
Repair, service, and maintenance of automatic lubrication system at BMW Rosslyn Plant
Prepare preliminary design concepts and reports
Provide preliminary design drawings
Do detail design of HVAC systems
Compile specifications and tender documentation
Design of ventilation systems to suite statutory requirements
Design of pressurisation systems and / or pressure cascade systems
Design of complex heating and cooling systems, including, but not limited to, chilled water and VRF systems
Design of chilled water or condenser water reticulation systems
Design of condensate drainage systems
Design of fresh air and extract systems
Pump and fan selections
Duct design
Preparation of budgets and project financial control
Key Achievements
Tender success rate of 55% of annual tender submissions
Proposed and managed the ISO9001:2015 certification process for the organization
Education
Bachelor of Technology Honours Degree - Industrial and Manufacturing Engineering
Harare Institute of Technology
08.2008 - 05.2012
GENERAL CERTIFICATE OF EDUCATION AT ORDINARY - undefined
Valley High School
01.2002 - 05.2005
undefined
01.2006 - 05.2007
Skills
AND QUALITIESundefined
Accomplishments
Replacement of ball mill support structure (Samancor Tubatse Chrome Steelport) Project Duration: 2 weeks shutdown
Project Value: R 250 000.00
Fire hydrant line design and installation (Samancor Tubatse Chrome Smelter) Project duration: 1 month
Project Value: R 3200 000.00
Installation of agitator platform
Project duration: R 690 000.00
Fuchs Lubricants
HVAC system design for the grease plant
Project value: R 120 000.00
Anglo American Mogalakwena Platinum Mine Electrical Cable pit reticulation for all the pits Project Value: R 18 000 000.00
Eskom Medupi Power Station
VSD Room Design, Installation and Commissioning for Unit 1 to 6
Project Value: R12 700 450.00
Eskom Majuba Power Station
Design, installation and commissioning of High Conductivity Effluent System
Project Value: R, Other Emergencies Projects (D.I.D Gauteng)
Repair and maintenance of Thembisa Hospital ICU and Theatres HVAC system
Service of split unit air conditioners at Prasa
Service of packaged unit for Dr Yusuf Dadoo Phamarcy
Installation of bed head units for Chris Hani Baragwanath Hospital for ward 33
Installation of cold rooms for Chris Hani Baragwanath Hospital mortuary
Achievements:
Manager of the year 2015
Created S.O.Ps for organization ISO9001:2015 certification (QMS)
Additional Information
Drivers License: , C1 Code 10
Own Vehicle
Timeline
Service Project Engineer
GEA Africa Pty Ltd
02.2021 - Current
01.2021 - 1 1
Project Engineer
GPWG Engineering PTY LTD
10.2019 - 01.2021
08.2017 - 07.2018
04.2016 - 03.2019
12.2015 - 11.2016
10.2015 - 09.2018
Projects Manager
WANGA POWER PROJECTS
06.2013 - 09.2019
06.2013 - 05.2017
Bachelor of Technology Honours Degree - Industrial and Manufacturing Engineering
Harare Institute of Technology
08.2008 - 05.2012
undefined
01.2006 - 05.2007
GENERAL CERTIFICATE OF EDUCATION AT ORDINARY - undefined
Senior Quantity Surveyor at Hitachi Power Africa Contracted to Eskom Holding Soc (Pty) Ltd and Steinmuller AfricaSenior Quantity Surveyor at Hitachi Power Africa Contracted to Eskom Holding Soc (Pty) Ltd and Steinmuller Africa