QA/QC LEAD WELDING INSPECTOR
BLAIZEPOINT ENGINEERING/SAPPI VULINDLELA PROJECT
Durban, KZN
01.2020 - Current
- Review and Approve WPS/PQR for compliance to BS EN ISO 15614 for 316 piping upgrade of new boiler
- Qualification of welders to ISO 9606-1
- Develop of all site FEQ/TQ for field deviations
- Compile and maintain piping pressure test packages
- Initiate and follow through on all NCR if any non-compliance is observed
- Participate on weekly HSE safety briefing
- Inspection of incoming parts for conformance to project specifications
- Disposed of unsound and unsafe materials, products and equipment to prevent inappropriate reuse.
- Ensure correct equipment and consumables/material are been used for fabrication and installation of piping
- Verification that dimensions ,fit-up and weld preparations are accordance with drawings and WPS
- Request and monitor all NDE percentage coverage as per project requirements
- Line checking, clearing and punch list for piping as per P&ID and isometric drawings
- Final documentation compilation and submission for handover