Summary
Overview
Work History
Education
Skills
Attributes
Certification
Timeline
Hi, I’m

Jacques Botha

Construction Manager
Stellenberg
Jacques Botha

Summary

Accomplished and pragmatic construction professional with 10+ years of experience managing complex, multi-discipline projects in the renewable energy sector. Proven ability to lead large teams, coordinate with diverse contractors, and deliver high-value infrastructure safely, on time, and within scope. Adept at navigating stakeholder relationships, contract negotiations, and evolving project demands. Deep familiarity with utility-scale solar PV installations, grid infrastructure, and commissioning processes.


Overview

43
years of professional experience
4
Certifications
2
Languages

Work History

CCM Mooiplaats (Pty) LTD

Site Construction Manager / Project Management
01.2024 - Current

Job overview

  • Responsible for overseeing the overall construction of a 240 MW PV Project, ensuring all site operations are executed efficiently, safely, and in compliance with contractual and regulatory requirements.
  • This role includes managing civil, mechanical, and electrical installation contractors, coordinating with key stakeholders, and ensuring the successful commissioning of the project in preparation for Commercial Operation Date (COD).
  • Strong command of construction standards, scheduling tools, HSE regulations, and quality systems.
  • Directed all site operations for a 240 MW photovoltaic power plant from early works to commissioning.
  • Managed multiple civil, mechanical, and electrical subcontractors across critical scopes, including: Civil works: internal roads, drainage, causeways, site leveling, O&M building, and security infrastructure.
  • Grid infrastructure: Eskom substation, 132kV overhead transmission line, and IPP control building.
  • Mechanical and electrical: Gamechanger Genius Tracker System, MV/LV AC and DC cabling, 943 Huawei string inverters, and 43 Huawei 33kV MV stations.
  • Led plant commissioning (cold and hot) to meet the Commercial Operation Date (COD).

Benvolio Projects (Pty) Ltd

Project Manager
01.2021 - 12.2023

Job overview

  • Oversee and manage residential construction projects from start to finish.
  • Supervise construction teams, subcontractors, and suppliers on-site.
  • Ensure projects are completed on time, within budget, and to client specifications.
  • Conduct site inspections and quality control checks.
  • Manage project budgets, cost estimations, and procurement of materials.
  • Develop work schedules and allocate resources efficiently.
  • Handle problem-solving on-site, addressing issues as they arise.
  • Ensure compliance with local building regulations and safety standards.
  • Communicate with clients, updating them on project progress and any changes.

juwi Renewable Energies (Pty) Ltd

Construction Manager – Bokamoso Project 78mW
08.2019 - 12.2020

Job overview

  • Managed effective and high-quality construction techniques on solar PV project site.
  • Maintained company project goals in alignment with site activities and quality management.
  • Managed all civil, structural, mechanical, electrical, module installation, and project commissioning-related functions.
  • Identified and resolved all project and engineering deficiencies noted during project field inspections.
  • Monitored and oversaw all civil, structural, mechanical, and electrical work on site.
  • Ensured contractual obligations were met.
  • Supported sub-contractors with site-related work.
  • Ensured the project was built according to design and company standards.
  • Ensured and maintained project site safety standards.
  • Conducted daily field inspections of the work in progress and addressed any deviations or deficiencies with the Project Manager and other team members.
  • Reviewed site plans and procedures periodically and requested design changes if necessary.
  • Successfully resolved various construction and site-related problems.
  • Facilitated project review processes.
  • Attended daily site meetings with construction teams and sub-contractors.
  • Conducted monthly progress meetings with client and sub-contractors.
  • Ensured company Quality Control plan was implemented and monitored.
  • Ensured full compliance with the quality, health, safety, and environmental (SHEQ) regulations, legislation, standards, codes, and requirements.
  • Engaged on a regular basis with the local community and stakeholders to resolve labour unrest issues.
  • Engaged with Police Cluster Command to gather support to safeguard project staff and equipment from labour unrest.

juwi Renewable Energies (Pty) Ltd

Construction Manager: Mechanical – Bokamoso Project 78mW
02.2019 - 07.2019

Job overview

  • Managed the successful installation of module structures and modules.
  • Completed project objectives according to company policies and procedures as well as industry legislation.
  • Reported to the Construction Site Manager.
  • Collaborated with other industry Specialists and the client to ensure the achievement of client project objectives.
  • Managed and reported on the projects mechanical installation and commissioning progress.
  • Actively minimized project risk and maximized performance.
  • Oversaw all internal, consulting, supplier, and sub-contractor construction and commissioning resources.
  • Implemented key performance indicators (KPIs) and controls.
  • Monitored performance against baselines.
  • Implemented employee corrective action as required.
  • Ensured compliance with all specifications and requirements with EPC contracts associated with construction quality, test, commissioning, and handover.
  • Adhered to construction deadlines and payment milestones.
  • Compiled all supporting documentation.
  • Ensured full compliance with the quality, health, safety and environmental (SHEQ) regulations, legislation, standards, codes and requirements.

juwi Shizen Energy Inc

Construction Specialist Based in Sendai, Miyagi Prefecture, Japan
07.2018 - 01.2019

Job overview

  • Appointed as a Construction Site Specialist, reporting to the Head of Construction.
  • Responsible for site visits across multiple projects in Japan on a rotational basis, monitoring construction activities, identifying potential issues, providing guidance to site teams, and reporting findings to senior management.
  • Advised site construction management on project deadlines and payment milestones to ensure timely completion.
  • Identified risks related to incorrect material usage and construction methods, mitigating potential delays through proactive recommendations.
  • Conducted a study on available module structures and provided procurement recommendations for the Iwade Project.
  • Analyzed the drilling and placement process for module structure post-installation on the Kurokawa Project.
  • Compiled a post-construction audit for the Kanazawa Project, outlining corrective measures required for achieving Commercial Operation Date (COD).
  • Project Sites: Ozu (34MW) – Kumamoto, Iwade (11.7MW) – Wakayama, Sano (42MW) – Sano, Trina Miyagi Kurokawa (28.8MW) – Kurokawa

juwi Renewable Energies (Pty) Ltd

Construction Manager, Capelands Solar Farm
05.2018 - 06.2018

Job overview

  • Responsible for coordinating the entire installation process, ensuring compliance with industry standards, safety regulations, and project timelines.
  • Lead the construction and installation of the Cathodic Protection System, ensuring high-quality delivery in collaboration with KKS Austria.
  • Oversee all on-site activities, including contractor supervision, material logistics, and adherence to safety protocols.
  • Act as the primary liaison between engineers, subcontractors, suppliers, and project owners to ensure smooth execution.
  • Manage project costs and timelines, identifying risks and implementing mitigation strategies.
  • Ensure all work is carried out according to UK construction standards, cathodic protection regulations, and industry best practices.
  • Enforce strict adherence to HSE regulations and conduct risk assessments throughout the installation.
  • Address technical challenges that arise due to unexpected site conditions or logistical constraints.
  • Maintain accurate records, project updates, and progress reports for internal and external stakeholders.

juwi Renewable Energies (Pty) Ltd

Construction Project Manager
03.2017 - 11.2017

Job overview

  • Managed all civil, structural, mechanical, electrical, module installation, and project commissioning-related functions.
  • Identified and resolved all project and engineering deficiencies noted during project field inspections.
  • Monitored and oversaw all civil, structural, mechanical, and electrical work on site.
  • Ensured contractual obligations were met.
  • Supported sub-contractors with site-related work.
  • Ensured the projects were built according to design and company standards.
  • Ensured and maintained project site safety standards.
  • Conducted daily field inspections of the work in progress and addressed any deviations or deficiencies with the Project Manager and other team members.
  • Reviewed site plans and procedures periodically and requested design changes if necessary.
  • Successfully resolved various construction and site-related problems.
  • Facilitated project review processes.
  • Attended daily site meetings with construction teams and sub-contractors.
  • Conducted monthly progress meetings with client and sub-contractors.
  • Ensured company Quality Control plan was implemented and monitored.

juwi Renewable Energies (Pty) Ltd

Logistics Coordinator – Prieka PV3 Project – 86mW
06.2015 - 02.2017

Job overview

  • Managed on-site logistics planning and coordination among all suppliers and sub-contractors – delivery schedule, allocation of storage areas to all sub-contractors, and route planning for all delivery vehicles entering and leaving the project site.
  • Determined logistics and offloading resources (operators & equipment) required to attain schedule milestones in alignment with the construction plan.
  • Ensured the timeous movement of module stock from laydown area into the construction area by Watt and Amp class.
  • Conducted a study of the access roads leading to the project site to ensure it’s in an acceptable condition for the delivery of heavy and oversized equipment.
  • Implemented max speed allowed on the project site and access roads leading to the project site – necessary traffic signs erected.
  • Managed and planned off-site logistics in collaboration with the Supply Chain Manager and Local Transport Authorities.
  • Kept records of all construction materials delivered to the site, advising the Site Construction Manager of short deliveries which could result in construction delays.
  • Kept records of materials damaged during offloading and submitted the necessary documentation required for insurance claims.
  • Took regular trips to offsite storage facilities inspecting materials and ensuring that security measures were in place to safeguard stored module stock.
  • Held daily meetings with the Supply Chain Manager with updates on materials received on-site and potential delays.
  • Implemented systems, processes, documents, and templates required for supplier and subcontractor warehousing and delivery tracking, incoming inspections, claims, and goods received.
  • Ensured adherence to all safety, health, environmental, and quality regulations.
  • Ensured the timeous submission of risk assessments, method statements, and rigging studies by the appointed contractors for approval by HSE Dept - related to the offloading of inverters and transformers.
  • Kept a detailed site diary noting events (weather, labour unrest, work stoppages) that caused delays in the delivery of materials to the site.
  • Housekeeping – ensured the laydown area was kept orderly and tidy, arranged for the removal of redundant packing materials and pallets from site to be recycled.

Krust Pizza

Independent Business Owner
11.2010 - 02.2016

juwi Renewable Energies (Pty) Ltd

Auxiliary Construction Manager – Carmelo Swartland Project
12.2013 - 06.2014

Job overview

  • Interviewed and employed laborers to conduct auxiliary construction support services on site.
  • Provided auxiliary construction support services on site. Responsible for general housekeeping on the project site.
  • Managed all equipment and project resources.
  • Compiled reports on the general conditions of employment to the Project Manager.
  • Held weekly meetings with the Economic Development Manager discussing economic development targets to be achieved, documentation and employment contracts.
  • Maintained employee schedules and documented hours.
  • Reported on and provided feedback on any critical issues or problems.

Benvolio Construction

Construction Manager
03.2003 - 11.2010

Statoil SA

Site Manager
03.2002 - 02.2003

Engen Petroleum Limited

Category and Space Management Executive
07.1997 - 03.2002

Kwikspar

Franchise Business Owner
03.1992 - 11.1996

Makro SA

Senior Department Manager
07.1990 - 03.1992

OK Bazaars

Trainee Manager
05.1989 - 07.1990

South African Airways - Cape Town International Airport

Senior Manager
03.1982 - 04.1989

Education

Hottentots Holland High School
Somerset West, South Africa

High School Diploma
04.2001

University Overview

  • Completed University-level Coursework: Mathematics, Science, Biology, History, english, Afrikaans, Hottentots Holland High School
  • Chairman , Photographic Club, 1980
  • Captain of 1st Tennis Team

Skills

Attributes

  • Analytical Problem-solving
  • Critical Thinking and Decision-making
  • Interpersonal Skills
  • Communication
  • Deadline Driven

Certification

Raidlog Certified User

Timeline

Site Construction Manager / Project Management

CCM Mooiplaats (Pty) LTD
01.2024 - Current

Project Manager

Benvolio Projects (Pty) Ltd
01.2021 - 12.2023

Construction Manager – Bokamoso Project 78mW

juwi Renewable Energies (Pty) Ltd
08.2019 - 12.2020

Construction Manager: Mechanical – Bokamoso Project 78mW

juwi Renewable Energies (Pty) Ltd
02.2019 - 07.2019

Construction Specialist Based in Sendai, Miyagi Prefecture, Japan

juwi Shizen Energy Inc
07.2018 - 01.2019

Construction Manager, Capelands Solar Farm

juwi Renewable Energies (Pty) Ltd
05.2018 - 06.2018

Construction Project Manager

juwi Renewable Energies (Pty) Ltd
03.2017 - 11.2017

Logistics Coordinator – Prieka PV3 Project – 86mW

juwi Renewable Energies (Pty) Ltd
06.2015 - 02.2017

Auxiliary Construction Manager – Carmelo Swartland Project

juwi Renewable Energies (Pty) Ltd
12.2013 - 06.2014

Independent Business Owner

Krust Pizza
11.2010 - 02.2016

Construction Manager

Benvolio Construction
03.2003 - 11.2010

Site Manager

Statoil SA
03.2002 - 02.2003

Hottentots Holland High School

High School Diploma
04.2001

Category and Space Management Executive

Engen Petroleum Limited
07.1997 - 03.2002

Franchise Business Owner

Kwikspar
03.1992 - 11.1996

Senior Department Manager

Makro SA
07.1990 - 03.1992

Trainee Manager

OK Bazaars
05.1989 - 07.1990

Senior Manager

South African Airways - Cape Town International Airport
03.1982 - 04.1989
Jacques BothaConstruction Manager