Summary
Overview
Work History
Education
Skills
Attributes
Certification
Timeline
Hi, I’m

Jacques Botha

Construction Manager
Stellenberg
Jacques Botha

Summary

Accomplished and pragmatic construction professional with 10+ years of experience managing complex, multi-discipline projects in the renewable energy sector. Proven ability to lead large teams, coordinate with diverse contractors, and deliver high-value infrastructure safely, on time, and within scope. Adept at navigating stakeholder relationships, contract negotiations, and evolving project demands. Deep familiarity with utility-scale solar PV installations, grid infrastructure, and commissioning processes.

Overview

43
years of professional experience
4
Certifications
2
Languages

Work History

CCM Mooiplaats (Pty) LTD

Site Construction Manager / Project Management
01.2024 - Current

Job overview

  • Responsible for overseeing the overall construction of a 240 MW PV Project, ensuring all site operations are executed efficiently, safely, and in compliance with contractual and regulatory requirements.
  • This role includes managing civil, mechanical, and electrical installation contractors, coordinating with key stakeholders, and ensuring the successful commissioning of the project in preparation for Commercial Operation Date (COD).
  • Strong command of construction standards, scheduling tools, HSE regulations, and quality systems.
  • Directed all site operations for a 240 MW photovoltaic power plant from early works to commissioning.
  • Managed multiple civil, mechanical, and electrical subcontractors across critical scopes, including: Civil works: internal roads, drainage, causeways, site leveling, O&M building, and security infrastructure.
  • Grid infrastructure: Eskom substation, 132kV overhead transmission line, and IPP control building.
  • Mechanical and electrical: Gamechanger Genius Tracker System, MV/LV AC and DC cabling, 943 Huawei string inverters, and 43 Huawei 33kV MV stations.
  • Led plant commissioning (cold and hot) to meet the Commercial Operation Date (COD).

Benvolio Projects (Pty) Ltd

Project Manager
01.2021 - 12.2023

Job overview

  • Oversee and manage residential construction projects from start to finish.
  • Supervise construction teams, subcontractors, and suppliers on-site.
  • Ensure projects are completed on time, within budget, and to client specifications.
  • Conduct site inspections and quality control checks.
  • Manage project budgets, cost estimations, and procurement of materials.
  • Develop work schedules and allocate resources efficiently.
  • Handle problem-solving on-site, addressing issues as they arise.
  • Ensure compliance with local building regulations and safety standards.
  • Communicate with clients, updating them on project progress and any changes.

juwi Renewable Energies (Pty) Ltd

Construction Manager – Bokamoso Project 78mW
08.2019 - 12.2020

Job overview

  • Managed effective and high-quality construction techniques on solar PV project site.
  • Maintained company project goals in alignment with site activities and quality management.
  • Managed all civil, structural, mechanical, electrical, module installation, and project commissioning-related functions.
  • Identified and resolved all project and engineering deficiencies noted during project field inspections.
  • Monitored and oversaw all civil, structural, mechanical, and electrical work on site.
  • Ensured contractual obligations were met.
  • Supported sub-contractors with site-related work.
  • Ensured the project was built according to design and company standards.
  • Ensured and maintained project site safety standards.
  • Conducted daily field inspections of the work in progress and addressed any deviations or deficiencies with the Project Manager and other team members.
  • Reviewed site plans and procedures periodically and requested design changes if necessary.
  • Successfully resolved various construction and site-related problems.
  • Facilitated project review processes.
  • Attended daily site meetings with construction teams and sub-contractors.
  • Conducted monthly progress meetings with client and sub-contractors.
  • Ensured company Quality Control plan was implemented and monitored.
  • Ensured full compliance with the quality, health, safety, and environmental (SHEQ) regulations, legislation, standards, codes, and requirements.
  • Engaged on a regular basis with the local community and stakeholders to resolve labour unrest issues.
  • Engaged with Police Cluster Command to gather support to safeguard project staff and equipment from labour unrest.

juwi Renewable Energies (Pty) Ltd

Construction Manager: Mechanical – Bokamoso Project 78mW
02.2019 - 07.2019

Job overview

  • Managed the successful installation of module structures and modules.
  • Completed project objectives according to company policies and procedures as well as industry legislation.
  • Reported to the Construction Site Manager.
  • Collaborated with other industry Specialists and the client to ensure the achievement of client project objectives.
  • Managed and reported on the projects mechanical installation and commissioning progress.
  • Actively minimized project risk and maximized performance.
  • Oversaw all internal, consulting, supplier, and sub-contractor construction and commissioning resources.
  • Implemented key performance indicators (KPIs) and controls.
  • Monitored performance against baselines.
  • Implemented employee corrective action as required.
  • Ensured compliance with all specifications and requirements with EPC contracts associated with construction quality, test, commissioning, and handover.
  • Adhered to construction deadlines and payment milestones.
  • Compiled all supporting documentation.
  • Ensured full compliance with the quality, health, safety and environmental (SHEQ) regulations, legislation, standards, codes and requirements.

juwi Shizen Energy Inc

Construction Specialist Based in Sendai, Miyagi Prefecture, Japan
07.2018 - 01.2019

Job overview

  • Appointed as a Construction Site Specialist, reporting to the Head of Construction.
  • Responsible for site visits across multiple projects in Japan on a rotational basis, monitoring construction activities, identifying potential issues, providing guidance to site teams, and reporting findings to senior management.
  • Advised site construction management on project deadlines and payment milestones to ensure timely completion.
  • Identified risks related to incorrect material usage and construction methods, mitigating potential delays through proactive recommendations.
  • Conducted a study on available module structures and provided procurement recommendations for the Iwade Project.
  • Analyzed the drilling and placement process for module structure post-installation on the Kurokawa Project.
  • Compiled a post-construction audit for the Kanazawa Project, outlining corrective measures required for achieving Commercial Operation Date (COD).
  • Project Sites: Ozu (34MW) – Kumamoto, Iwade (11.7MW) – Wakayama, Sano (42MW) – Sano, Trina Miyagi Kurokawa (28.8MW) – Kurokawa

juwi Renewable Energies (Pty) Ltd
Barnstaple

Construction Manager, Capelands Solar Farm
05.2018 - 06.2018

Job overview

  • Responsible for coordinating the entire installation process, ensuring compliance with industry standards, safety regulations, and project timelines.
  • Lead the construction and installation of the Cathodic Protection System, ensuring high-quality delivery in collaboration with KKS Austria.
  • Oversee all on-site activities, including contractor supervision, material logistics, and adherence to safety protocols.
  • Act as the primary liaison between engineers, subcontractors, suppliers, and project owners to ensure smooth execution.
  • Manage project costs and timelines, identifying risks and implementing mitigation strategies.
  • Ensure all work is carried out according to UK construction standards, cathodic protection regulations, and industry best practices.
  • Enforce strict adherence to HSE regulations and conduct risk assessments throughout the installation.
  • Address technical challenges that arise due to unexpected site conditions or logistical constraints.
  • Maintain accurate records, project updates, and progress reports for internal and external stakeholders.

juwi Renewable Energies (Pty) Ltd

Construction Project Manager
03.2017 - 11.2017

Job overview

  • Managed all civil, structural, mechanical, electrical, module installation, and project commissioning-related functions.
  • Identified and resolved all project and engineering deficiencies noted during project field inspections.
  • Monitored and oversaw all civil, structural, mechanical, and electrical work on site.
  • Ensured contractual obligations were met.
  • Supported sub-contractors with site-related work.
  • Ensured the projects were built according to design and company standards.
  • Ensured and maintained project site safety standards.
  • Conducted daily field inspections of the work in progress and addressed any deviations or deficiencies with the Project Manager and other team members.
  • Reviewed site plans and procedures periodically and requested design changes if necessary.
  • Successfully resolved various construction and site-related problems.
  • Facilitated project review processes.
  • Attended daily site meetings with construction teams and sub-contractors.
  • Conducted monthly progress meetings with client and sub-contractors.
  • Ensured company Quality Control plan was implemented and monitored.

juwi Renewable Energies (Pty) Ltd

Logistics Coordinator – Prieka PV3 Project – 86mW
06.2015 - 02.2017

Job overview

  • Managed on-site logistics planning and coordination among all suppliers and sub-contractors – delivery schedule, allocation of storage areas to all sub-contractors, and route planning for all delivery vehicles entering and leaving the project site.
  • Determined logistics and offloading resources (operators & equipment) required to attain schedule milestones in alignment with the construction plan.
  • Ensured the timeous movement of module stock from laydown area into the construction area by Watt and Amp class.
  • Conducted a study of the access roads leading to the project site to ensure it’s in an acceptable condition for the delivery of heavy and oversized equipment.
  • Implemented max speed allowed on the project site and access roads leading to the project site – necessary traffic signs erected.
  • Managed and planned off-site logistics in collaboration with the Supply Chain Manager and Local Transport Authorities.
  • Kept records of all construction materials delivered to the site, advising the Site Construction Manager of short deliveries which could result in construction delays.
  • Kept records of materials damaged during offloading and submitted the necessary documentation required for insurance claims.
  • Took regular trips to offsite storage facilities inspecting materials and ensuring that security measures were in place to safeguard stored module stock.
  • Held daily meetings with the Supply Chain Manager with updates on materials received on-site and potential delays.
  • Implemented systems, processes, documents, and templates required for supplier and subcontractor warehousing and delivery tracking, incoming inspections, claims, and goods received.
  • Ensured adherence to all safety, health, environmental, and quality regulations.
  • Ensured the timeous submission of risk assessments, method statements, and rigging studies by the appointed contractors for approval by HSE Dept - related to the offloading of inverters and transformers.
  • Kept a detailed site diary noting events (weather, labour unrest, work stoppages) that caused delays in the delivery of materials to the site.
  • Housekeeping – ensured the laydown area was kept orderly and tidy, arranged for the removal of redundant packing materials and pallets from site to be recycled.

Krust Pizza
Cape Town

Independent Business Owner
11.2010 - 02.2016

juwi Renewable Energies (Pty) Ltd

Auxiliary Construction Manager – Carmelo Swartland Project
12.2013 - 06.2014

Job overview

  • Interviewed and employed laborers to conduct auxiliary construction support services on site.
  • Provided auxiliary construction support services on site. Responsible for general housekeeping on the project site.
  • Managed all equipment and project resources.
  • Compiled reports on the general conditions of employment to the Project Manager.
  • Held weekly meetings with the Economic Development Manager discussing economic development targets to be achieved, documentation and employment contracts.
  • Maintained employee schedules and documented hours.
  • Reported on and provided feedback on any critical issues or problems.

Benvolio Construction
Cape Town

Construction Manager
03.2003 - 11.2010

Statoil SA
Ireland

Site Manager
03.2002 - 02.2003

Engen Petroleum Limited
Cape Town

Category and Space Management Executive
07.1997 - 03.2002

Kwikspar
Cape Town

Franchise Business Owner
03.1992 - 11.1996

Makro SA
Milnerton

Senior Department Manager
07.1990 - 03.1992

OK Bazaars
Cape Town

Trainee Manager
05.1989 - 07.1990

South African Airways - Cape Town International Airport
Cape Town

Senior Manager
03.1982 - 04.1989

Education

Hottentots Holland High School
Somerset West, South Africa

High School Diploma
04.2001

University Overview

  • Completed University-level Coursework: Mathematics, Science, Biology, History, english, Afrikaans, Hottentots Holland High School
  • Chairman , Photographic Club, 1980
  • Captain of 1st Tennis Team

Skills

Leadership & Team Management

Utility-Scale PV Systems

Project Management

Risks Assessment & Mitigation

Multicultural Team Collaboration

Cost Estimates

Project Budget Management

Conflict and Crisis Management

Project Planning & Execution

Resource Management

Stakeholder Relationship Management

Multi-Site Management

Reporting and Analysis

Contract Negotiation & Claims Handling

Procurement

Quality Assurance & Control

Health, Safety & Environmental Compliance

Decision-making

Subcontractor management

Team collaboration

Site management

Attributes

  • Analytical Problem-solving
  • Critical Thinking and Decision-making
  • Interpersonal Skills
  • Communication
  • Deadline Driven

Certification

Raidlog Certified User

Timeline

Site Construction Manager / Project Management

CCM Mooiplaats (Pty) LTD
01.2024 - Current

Project Manager

Benvolio Projects (Pty) Ltd
01.2021 - 12.2023

Construction Manager – Bokamoso Project 78mW

juwi Renewable Energies (Pty) Ltd
08.2019 - 12.2020

Construction Manager: Mechanical – Bokamoso Project 78mW

juwi Renewable Energies (Pty) Ltd
02.2019 - 07.2019

Construction Specialist Based in Sendai, Miyagi Prefecture, Japan

juwi Shizen Energy Inc
07.2018 - 01.2019

Construction Manager, Capelands Solar Farm

juwi Renewable Energies (Pty) Ltd
05.2018 - 06.2018

Construction Project Manager

juwi Renewable Energies (Pty) Ltd
03.2017 - 11.2017

Logistics Coordinator – Prieka PV3 Project – 86mW

juwi Renewable Energies (Pty) Ltd
06.2015 - 02.2017

Auxiliary Construction Manager – Carmelo Swartland Project

juwi Renewable Energies (Pty) Ltd
12.2013 - 06.2014

Independent Business Owner

Krust Pizza
11.2010 - 02.2016

Construction Manager

Benvolio Construction
03.2003 - 11.2010

Site Manager

Statoil SA
03.2002 - 02.2003

Hottentots Holland High School

High School Diploma
04.2001

Category and Space Management Executive

Engen Petroleum Limited
07.1997 - 03.2002

Franchise Business Owner

Kwikspar
03.1992 - 11.1996

Senior Department Manager

Makro SA
07.1990 - 03.1992

Trainee Manager

OK Bazaars
05.1989 - 07.1990

Senior Manager

South African Airways - Cape Town International Airport
03.1982 - 04.1989
Jacques BothaConstruction Manager