Dynamic Technical Support Technician with extensive experience at Hexagon Mining, excelling in system diagnostics and software installation. Proven ability to resolve complex issues and enhance customer satisfaction through effective problem resolution. Skilled in hardware configuration and technical troubleshooting, ensuring seamless operation of advanced mining technologies.
On Kolomela, Sishen iron ore mine and United manganese of Kalahari (UMK) mine. This role included working with the collision prevention system (CPS), vehicle intervention system (VIS) level 7-9, vision hubs and display 9.
VIS hardware Installations
Installation of VIS Hub harness
Short CAN cable
CAN T- Branch
VIS CAN Bridge
VIS OEM Cable for CAT
Scope screen installations
GPS Antenna installation
Tracking radar installation
CAN terminator installation
Cable routing
CAN Y cable splitter
CAN extension cable installation
Software Installations
CAS VIS Firmware: specific firmware which integrates CAS with VIS functionality
OEM firmware for interface
VIS parameters and configuration
System validation
VIS installation check: Check system integration and communication with OEM
Vision hub computer and display 9 configuration
Executing scripts and typing commands using Lynux
Uploading json files through winscp
On kolomela mine, this role included working on the following machinery: Liebherr 996, Liebherr 9150, Liebherr 984, CAT 777/770D/SKL Drills, Komatsu Track Dozers, Komatsu Wheel Dozers, Komatsu haul trucks 730/785, kolomela LDV'S
Battery installation
Strobe light installation
FM Radio installation
camera installation
Battery isolator installation
Red zone Lazer lights installation
Collision avoidance system installations
On Sishen iron ore mine, this role included working on Areas; DMS, washing and screening, primary and secondary crushers
Distribution box installation
Junction box installation
Multicore installation
Vibration sensor installation
Cable rack fabrication and installation
Power cable installation
On waterloo PV plant this role included cording, commissioning and installations.
CORDING
Binary cording
Power cycling on DCB Boxes
COMMISSIONING
Inverter cold commissioning
Tracker Block (Feeder) cold commissioning
Inverter hot commissioning
Feeder and DCB hot commissioning
INSTALLATIONS
DC cable installations
Stringer cable installation
Auxiliary cable installation
Fibre optic installations
Coms cable installations
Scortch Cast joint installation
Electro Thermal welding
PV module installation
Leap frogging
DB Panel installation
On waterloo PV plant this role included software programming and further electrical duties.
SOFTWARE PROGRAMS
Weid Muller programs
Command Prompt
Pia scada program
Drive composer
Inaccess Portal
Excel spread Sheet
Further Duties (Experiences)
Fibre Optic Prep works
Weather station patching
Inverter patching
DC cable heat shrinking
String cable heat shrinking
Earth cable installation
Earth mat installation
Junction Box installation
Parano Meter installation
Irradiance sensor installation
Temperature sensor installation
Electrical Test, cold commissioning
Short Circuit test (black box)
Polarity test
IV curve test
Earth resistivity test
Multi meter test
VOC voltage test
Point to point
Table test
Ammeter test
Insulation resistance test
High voltage meter test
Three phase testing
Visual fault locator test
Optic time domain reflector meter (OTDR)
Problem resolution
Customer support
Application support
Wireless networking
System diagnostics
Software installation
Hardware configuration
Technical support
Technical troubleshooting
Service support
Product troubleshooting
Hardware upgrades
Refilwe Itumeleng
Colleague at The Connexion
Cell no.: 076 124 1272
Thobekile Ndabeni
Technician at Juwi renewable engineering
Cell no.: 060 876 4372
Ruweida Obaray
Safety officer at Record engineering
Cell no.: 078 124 4491
Anton Botes
Line manager at Hexagon mining
Cell no.: 083 270 4562
Collin Bason
Colleague at Hexagon mining
Cell no.: 060 906 1424