Develop action plans which continuously strive improve the productivity and quality of products and processes.(Time Studies), Develop Engineering Quality Documents, To manage the introduction of new products with regard to Timing Plans, To prepare Quality Documentation Mass Production Trials, Supervision of 14 Quality inspectors, Addressing concerns experienced on the previous day to previous shop floors, Raise of CAR should there be any reoccurrence of similar concern, Chairing on morning start up meeting (green area meeting), Manage of resources (headcount), Part of daily Cross Functional Team (CFT), addresses and discuss chronic problems, Investigate and complete CAR raised against my shop floor, Compile of work instruction for line management, Conduct of job observations as per work instruction, Conduct training as per work instruction, Compilation of visual line management, Compile weekly and monthly report, Presentation of reports to senior management, Manage Quality Department at plant level, liaise with Group Manager, Manage of In-service Engineering students and 13 employees, Chair daily production meetings in the absence of Plant Manager, Ensure customer requirements are met (0 PPM), Attend weekly customer/supplier meetings to discuss quality performance, Plan and conduct internal product and process audits, Management of Quality Management System (ISO /TS 16949), Analysis of weekly and monthly quality reports, Compile PPAP and PSW, Manage and liaise with project team at head office, with regard to status of Projects at Plant level, Use of laboratory instrument (product verification), Conduct product statistical process control (SPC) & Repeatability and Reproducibility (R & R), Supplier management through schedule supplier visit, Part Submission Warrant (PSW) evaluation and approval, Master sample evaluation and approval, Investigation on reported part concern at the production line, Generation on Incident Report(IR’s) and issue to supplier should there be a failure due to supplier, Follow on G8D report from the supplier, evaluate G8D and close them off, Supplier improvement through process audit, Investigation of QRQC, Participate Supplier Evaluation and Approval Process (SEAP), Execution of the Parts Approval Process (PAP), Key Quality Milestones Project Tracking – Timing plan, Initiate open item tracking sheet (OIL) – product related problem, Continuous liaise with suppliers regarding high level of product quality delivery, Initiate and follow up the problem-solving activities with suppliers (NCR process, 8D), Systematic and continuous supplier quality assurance (Through Monthly Supplier Performance Review), Promoting improvement based on measured data, Coordination and check of the Supplier Quality Plan, Leading supplier audits and measuring of supplier performance (PPM measurements), Support site for problem solving to reach: On Quality, On Time and On Cost, Facilitate supplier nomination process, through performance of supplier quality audit, Execute supplier and project development to ensure product realization from concept, Project management through milestone tracking at suppliers, Series supplier management through supplier visit, process evaluation and annual requalification’s, Product and problem quality steering between the plant and suppliers in case of product quality concern, Leading CLT (Clover Leaf Team/Cross functional team) meetings as part of project/supplier steering, Participate in program management steering team on my project status, Line manager stand-in