Work History
Quality Inspector Team Leader
Praga Technical
08.2021 - Current
Ensured on-schedule task completion by prioritizing responsibilities and delegating duties based on team members' strengths/weaknesses identified in performance assessments conducted periodically
Recorded precise inspection results, delivering data-driven insights for process optimization initiatives.
Facilitated clear communication between production staff and management, fostering a culture of continuous improvement within the organization.
Facilitated development and implementation of innovative inspection methods to align with evolving industry trends, ensuring continuous awareness of best practices for sustained optimal results
Directed team of inspectors, guaranteeing consistent compliance with company standards and regulations.
Partnered with cross-functional teams to resolve quality issues and execute corrective actions swiftly.
QA/QC Fabrication of Wind Towers
DCD Wind Towers
05.2014 - Current
Company Overview: Energy
Receiving inspection
Verify that all purchased Steel (plates) is delivered with all the appropriate documentation (material certificates) as described in the purchase order and purchase specification
Measuring steel plates to drawing specification and per customer requirements
Approve the documentation and file for further use in data Book as per customer requirement
Verify that the received steel conforms to the specified grade, size and quantity allowing production to plan accurately using only correct material
Approve the material and keep record of all relevant documentation for inclusion into Data Book. Report all non-conformances
Fabrication Inspection
Dimension check as per drawing
Fit up of cans
Miss alignment checked
Bevels as per customer specifications
Traceability of steel plates recorded
Spec: BS EN 1090-2:2008
Blasting Inspection
Inspecting blast profile as per specification and customer requirement
Profile is check as per gauge provided and acceptance criteria
Min & Max readings taken and recorded
Inspecting humidity before releasing
Reject unacceptable profile and condition of section
Reporting of non-conformance
Final Inspection
Inspect and verify conformance of assembled Tower and other product to maintain good customer satisfaction. Produce a record of the inspection to serve as record of the conformance for future reference. Report all non-conformances.
Witness tower lights at test area to ensure conformance of the lights to all standards and requirements
Paint Inspection in final product
Assembly of fan to drawing and specification
Adhere to customer requirement
Constantly in contact and communication with the operators and tradesman in the different areas
Quality Inspector / Auditor / Final Inspector
Howden Donkin (Fans)
05.2010 - 04.2014
Company Overview: 2010
The In-Process inspector is responsible for inspecting product during the different manufacturing processes and stages to identify non-conformances as soon as it occurs, thus reducing the impact of the non-conformance on the product and the rest of the processes
The In-Process inspector is responsible for documenting and communicating conformance and non-conformance to the production management
The In-Process inspector is responsible for compiling a Data book as evidence of the conformance of manufactured product
The In-Process inspector is responsible for final releasing of fans at the test stations. Verifying that the fan conforms to all set criteria
The In-Process inspector is responsible for verifying that the corrosion protection on painted product conforms to the minimum requirements laid down
The In-Process inspector is responsible for performing internal audits to test the conformance to procedures in the workshop
Also responsible for final inspection, good that leaves the factory.
The authority to stop out of control processes and goods that is not in a satisfactory way completed to be send back and to be rectified
Verify that all purchased Steel is delivered with all the appropriate documentation as described in the purchase order and purchase specification ensuring quick and accurate flow of documentation. Approve the documentation and forward for further processing. Report all non-conformances
Verify that the received steel conforms to the specified grade, size and quantity allowing production to plan accurately using only correct material. Approve the material and keep record of all relevant documentation for inclusion into Data Book. Report all non-conformances
Inspect machined components in the machine shop to verify conformance of the product to all standards and drawings. Produce a record as evidence of conformance. Report all non-conformances
Inspect and verify conformance of assembled fans and other product to maintain good customer satisfaction. Produce a record of the inspection to serve as record of the conformance for future reference. Report all non-conformances
Witness fans at test area to ensure conformance of the fans to all standards and requirements. Produce a record of the inspection and report all non-conformances
Check the specification of the contract to ensure the painter uses the correct paint procedure; this will lead to customer satisfaction and reduced cost of rework. Check the dry film thickness of the paint system to ensure it conforms to the minimum requirements specified and produce a record of the measurements taken for later inclusion into the data book
Compile a Data Books for the completed fans containing the records of all inspections. Payment often depends on the availability of a comprehensive data book
Perform internal audits as scheduled by the Quality Manager to test the procedural conformance of the production management. Produce a record of the audit
Vibration report to be done and completed work hand in hand with operator to see a successful hand over to the customer