I am a sober and very positive and professional person always strive to deliver good results. I am always available for any task required and obtained very valuable skills in my profession and personal life.
Overview
36
36
years of professional experience
2004
2004
years of post-secondary education
1
1
Language
Work History
Site Manager / Engineer (2:6:1)
Bomar Projects
08.2022 - 07.2024
Equip sub vertical shaft, Install High pressure water pipes, 14deg conveyor installation, Construction, Civil, Human Recourses, Planning, High volume meetings, Member of Standards committee
Report line: Directors and General Manager, Mine Manager
Site Project Manager/Engineer (2:6:1)
SEMC
11.2019 - 06.2022
Company Overview: Sinking Engineering Mining Construction
Equip shaft /Trackless mining/ Conventional mining on flat ends and decline/ Erecting headgear/Construction/Infrastructure/Earthmoving/ Civil/Dams/Finance/HR/Planning/High volume meetings
Sinking Engineering Mining Construction
Report line: CEO and General Manager
Project Manager /Engineer (2:6:1)
Group five Civils and Mining
07.2014 - 01.2018
Company Overview: Sasol Coal Mining Irine Dale
Raise bore of 1800 ton bunker and escape way and equip escape way and Construct 1800-ton Underground bunker with Civil construction, Steel Construction and decline concrete of 60m 2x Low and 2x high voltage substations 2x conveyor belt 90-110m, conveyor drives, Bunker Jip Finance/ HR/ Planning/ High volume meetings
Sasol Coal Mining Irine Dale
Report line: Group Five Management and Client project management
Project Consultant
RSV Consulting EPCM
03.2009 - 06.2014
Company Overview: Sasol Coal Mining
To Oversee several contractors on their given scope of works
Feasibility studies, Design, Planning of two new mining projects
Oversee all Operations for the Client on Safety, Safety procedures, all documents, Safety systems safety files, Coaching, Quality, Scope of works, Document control, Finance, Meetings
Sasol Coal Mining
Report line: Client Project Management/ General Manager and Government officials
Production Mine Overseer/Site Manager (2:14:1)
Aveng GLTA
12.2004 - 03.2009
Company Overview: Two Rivers Platinum mine
Trackless Development of 2 on reef and main off reef decline Safety, Costs, Planning, Meetings
Two Rivers Platinum mine
Report line: Client management/ Contracts Manager
Senior Foreman (2:9:2)
Murray & Roberts
01.1994 - 12.2004
Company Overview: (Tsepong Gold Mine/Impala 14 B)
Production Decline development(Trackless mining) and Shaft Sinking
(Tsepong Gold Mine/Impala 14 B)
Report line: Master Sinker
Miner/Stagehand/Sinker/Foreman (Shift Boss)
Gold Fields Cementation
01.1989 - 12.1993
Company Overview: mining on Doornfontein Gold Mine Carletonville
Trackless and Conventional mining/Construction/ blast long holes undercut mining, sub level mining, block cave mining
Mining on Doornfontein Gold Mine Carletonville
Report line: Mine Overseer
Education
Mine Overseer -
Scheduled Mines - DMR
Blasting Scheduled Mines - undefined
DME
Onsetter - undefined
DME
Gengold Mining Development for Supervisors - Competent A&B
Turned a production site from 46 days behind to contract handing over date safe and within allowable budget.
24 months Injury free days on a project and made profit, complete project on time.
Consulting Overseer on EPCM Project, building exceptionally good Client, Contractor relationship.
Complete project during covid and motivating and kept South African and Zimbabwean personnel committed and positive for 9 continued months with no rotation during lockdown period.
Safety Observer of the year award
Trainingandqualifications
Mine Overseer – Scheduled Mines - DMR, 2004
Blasting Scheduled Mines – DME
Onsetter – DME
Gengold Mining Development for Supervisors
Competent A&B
Strata Control Chamber of Mines
Operational Risk Management A1&2
Cement & Concrete Technology – C&C Technology school