Summary
Overview
Work History
Education
Skills
Websites
Personal Information
Additional Information
Timeline
Generic
Allen Marnitz

Allen Marnitz

Construction Manager /Superintendent

Summary

I am a Construction Superindentant with over 30 years of multi-discipline experience in construction and maintenance execution, this candidate has successfully managed and coordinated engineering, construction, and maintenance completion activities in various industries including oil and gas (onshore and offshore), LNG refineries, petrochemical turnarounds and projects, fertilizer plants, mining, and well pad oil facilities. My expertise extends to countries in the GCC (Middle East) such as Saudi Arabia, UAE, Iraq, as well as African countries including South Africa, Swaziland, Gabon, Mozambique, and Angola. As a results-oriented professional, I have a strong background in pipe/structural fabrication and installation, systems mechanical completion, QC, welding & NDE compliance, coatings, civils, base supports, pipe rack erection and loading, hydro testing, static equipment inspection closeouts, and valve refurbishment coordination. I possess broad-based knowledge of codes and standards applicable to the industry. Throughout their career, I have excelled as both a well-disciplined and organized team leader and player who values the essence of teamwork as a tool used to execute tasks efficiently. Additionally, I am knowledgeable and competent in ensuring safe work compliance and delivering quality assurance. I have worked as a client representative for major construction companies such as Fluor, Worley Parsons, Murray & Roberts, as well as production companies like Sasol, SHELL, LUKOIL, Engen, and FERTIL. I am a highly experienced "Construction Professional" who is ready for the next managerial challenge the industry can bring.

Overview

2025
2025
years of professional experience
1
1
year of post-secondary education

Work History

Project Construction Superintendent

Lukoil
  • Supervised field crews to maximize quality and work efficiency.
  • Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.
  • Delivered projects ahead of schedule by developing efficient construction processes and coordinating teams effectively.
  • Drove project objectives on day-to-day operational level by working closely with clients, decision-makers and vendors.

QA/QC Inspector/ Manager

  • Mechanical, Piping, Civil, Painting- Fluor Arabia, Fluor SA & for Friedlander in RABIG in Gabon, West Africa, on Shell Toucan Project
  • Turnaround/Maintenance Flange Management QA/QC - Fluor
  • Maintenance & Turnaround Subcontracts Coordinator for services and interface execution - (GLTA & Fluor)
  • Hydro-test Supervisor – Turnaround and Project work at Chevron in Cabinda Offshore in Angola & GLTA at Sasol plant in Mozambique.

Piping Supervisor

Shell Oil
  • Working in live plant under stringent control measures and to Shell PTW requirements.
  • Spearheaded efforts to adopt new technologies and best practices in the field of piping supervision, resulting in increased operational efficiency across multiple projects.
  • Increased project completion rates by consistently meeting deadlines and maintaining high-quality work standards in piping installations.
  • Maintained a strong safety culture within the team by conducting regular safety briefings and consistently enforcing compliance with established guidelines.
  • Improved overall project efficiency by effectively supervising piping installation and maintenance tasks.

Shutdown Services Coordinator

ENGEN for FLUOR GLOBAL SERVICE
  • Coordinating scaffolding, hydro jetting of exchanger bundles, shells and compone
  • Improved team productivity with regular communication and progress updates, fostering a collaborative work environment.
  • Managed project timelines for successful completion, ensuring milestones were met and deadlines were adhered to.
  • Collaborated with department heads to develop strategic plans aligning with overall company objectives, fostering a unified approach toward shared goals.

Maintenance Site superintendent

FLUOR GLOBAL SERVICE
  • Turnaround Site superintendent overseeing Mechanical Shutdown execution

Shutdown Services Coordinator

FLUOR DANIEL
  • Entered data, generated reports, and produced tracking documents.
  • Improved team productivity with regular communication and progress updates, fostering a collaborative work environment.
  • Managed project timelines for successful completion, ensuring milestones were met and deadlines were adhered to.
  • Enhanced customer satisfaction by responding promptly to inquiries and addressing concerns professionally.

Offshore Piping Foreman

INTERSHORE
  • Hydro-testing & Reinstatement of piping systems.
  • Completed daily logs and progress reports.
  • Conducted quality control inspections throughout all stages of the project lifecycle to ensure high levels of workmanship were maintained consistently.

Hydro Test Supervisor

BABCOCK, Mossgas, Module Construction
  • Collaborated with cross-functional teams to integrate testing processes seamlessly into the larger project framework.
  • Developed customized training programs for new hires, ensuring they had a solid foundation in core testing concepts and practices before joining active projects.
  • Ensured timely completion of projects by setting achievable deadlines and closely monitoring progress throughout the testing phase.

Shutdown Supervisor

ISM INTERNATIONAL

Maintenance Fitter then supervisor

Shutdown Area Supervisor, •Supervisor

09.1994

Hot Work Superintendent

KOEBERG Nuclear Power Station
03.2023 - 07.2024
  • Actom John Thompson
  • Managed Supervision and workforce in removal and replacement of the 3 steam generators and associated piping and tubing inside the controlled Reactor Building
  • Work involved daily monitoring of workers radiation dose rates in high radiation dose zones and ensuring that work was safely executed with close monitoring of compliance to performance tools guidelines
  • Coordination with Radiation Protection (RP) and Foreign Material Exclusion9fme) officers in all hot work execution to ensure work compliance to nuclear standards
  • Ensuring QC/QA intervention inspection hold points are adhered to with all relevant inspection witness by ESKOM, National Nuclear Regulator and Framatome are signed off in the data packs
  • Coordination with Eskom and Framatome in work execution
  • Managed the Nightshift Team for 4 months during peak critical path execution
  • Liaised with our execution team, FRAMATOME and ESKOM daily wrt Safety Tool box talks, pre job briefing, permitting acceptance, task execution and post job briefing per shift
  • Project delays and recovery schedules
  • Coordination off logistics interfaces and introduction of tools and equipment into the radiation controlled zone.

Senior Construction Execution Specialist

Worley @ ASTRON Refinery
12.2009 - 07.2022
  • Seconded to ASTRON Maintenance Department tasked with managing Critical Path activities
  • Managed 4 different contractor companies executing hot work on all scoped piping defects required to be fixed for Refinery start up
  • Scoping of Engineering Inspection Request and coordinating execution by arranging pre job briefs, readiness reviews, Data pack registration, material verification inspection/release, scaffolding and access and field construction execution
  • Attended daily planning and Construction meetings to feedback to management and engineering work execution status and schedule impacts
  • Review of Data work packages
  • Cordination with NDE and AIA to facilitate code requirements closure and that intervention points are timeously adhered to.

Construction Area Superintendent

Fluor/ VOPAK
02.2020 - 12.2020
  • Managed all construction execution coordination and safety and quality compliance with Main Mechanical Contractors BEVLINE AND EPCM in work at OBL
  • Site visible interacting, interfacing & execution
  • Liaison with operations and EC for all permits and CSE & verification of Standard operating checklist applications before critical job start up
  • Progress reporting
  • Managing OBL Activities Civil bases, Structural Steel erection and piping installation an testing
  • Coordination with Island View Cutler Management and Transnet in ensuring project interfaces are expedited and constraints resolved speedily
  • Coordination of Inspections and timeous feedback/ completion of Inspection report action Items
  • Reported to Construction Manager Tony Lorenzo/Ntokozo Ntombela
  • Year

Construction Area Project Superintendent, Turnaround Coordinator

SAPREF Refinery, DURBAN, GAS
08.2018 - 07.2019
  • Assigned to Turnaround Management Team to manage task execution safely and as per approved drawings
  • Site visible interacting and interfacing during T/A execution
  • Liaison with operations and EC for all permits and CSE & verification of Standard operating checklist applications before critical job start up
  • Progress reporting
  • Coordination of Inspections and timeous feedback/ completion of Inspection report action Items
  • Reported to Construction Manager Tony Lorenzo/ George Hammond
  • QATAR, Assigned to Turnaround Management Team to manage safety and Construction execution quality compliance
  • Site visible interacting and interfacing during T/A execution
  • Liaison with operations and EC for all permits and CSE & verification of Standard operating checklist applications before critical job start up
  • Progress reporting
  • Coordination of Inspections and timeous feedback/ completion of Inspection report action Items.

Area Superintendent

Shell Pearl Turnaround
01.2018 - 03.2018
  • (Qatar)
  • Pre-Turnaround and Turnaround activity execution managing planned scheduled work performed in ASU Plant
  • Pre-Turnaround and Turnaround Fabrication and Erection work
  • (Piping and welding) at units ASU, GTL, LPU, FGP
  • Assigning welders to welding jobs as per their qualifications and WPS guidelines
  • Maintaining welders chrono logs and coordination the line class NDE requirements
  • Ensuring welding controls are compliance driven
  • Verification of cut lines as per Tie Inn list and ensuring pre-execution NDE is adhered to
  • Managing Hot Work welding teams during Turnaround execution
  • Surveillance management on welding consumable control
  • Post NDE hydrotest and reinstatement of piping for Mechanical Completion.

Subcontracts Coordinator

SHELL Refinery Durban
01.2017 - 05.2017
  • Turnaround)
  • Coordinate all Turnaround Heat exchanger bundle retubes and hydro jetting & inspection including transportation to and from the retube contractor Elgin Engineering
  • Ensure inspection is carried out and repair procedures issued with Technical Queries/Site Instructions
  • Agreed schedule times
  • Liaise with planning and Inspection to release Inspection advice regarding discovery scope for all off-site work
  • Daily liaison on retube progress and updating
  • Management on deliverables and in charge of hydro jetting of tube bundles and exchanger components in the Hydro jetting Wash Bay and arranging inspection release after cleanliness acceptance
  • Managed hot work Shutdown task execution during Sasol shutdown in gasification and gas cooling Units
  • Ensured Hot Work Teams were aligned to deliver fabrication, welding, NDT of scheduled scope of Work and reported progress to Sasol planners for updating system
  • Oversee Contractor Samsung Engineering construction activities for all disciplines
  • Liaise with PMT and advise on Construction deliverable schedule
  • Review and approve Method Statements on Construction execution task
  • Facilitate all construction filed engineering and site queries
  • Attending meetings and providing feedback on Project execution
  • Liaise with commissioning to ensure systems hand over completion
  • Ensure that Project specifications are adhered to
  • Manpower loading and monitoring
  • Ensure HSE policies are conformed to and drive Safety awareness
  • Site execution surveillance and progress monitoring and reporting
  • Coordinate with various team leaders to ensure interface tasks are completed as per hand over schedule and work off Construction and Client Punch list
  • Ensure Clean Construction Procedures are adhered to by Contractors.

Project Superintendent

SNC LAVALIN
06.2016 - 11.2016
  • Sasol Shutdown)
  • Managed hot work Shutdown task execution during Sasol shutdown in gasification and gas cooling Units
  • Ensured Hot Work Teams were aligned to deliver fabrication, welding, NDT of scheduled scope of Work and reported progress to Sasol planners for updating system
  • Oversee Contractor Samsung Engineering construction activities for all disciplines
  • Liaise with PMT and advise on Construction deliverable schedule
  • Review and approve Method Statements on Construction execution task
  • Facilitate all construction filed engineering and site queries
  • Attending meetings and provide feedback on Project execution.

Project Superintendent

Lukoil Overseas
10.2013 - 12.2015
  • YAMAMA Priority Well Pad/MISHRIF FFD Water Injection/ Gathering System Project- West Qurna 2 Oil Fields
  • Pre-feed and feed constructability input into engineering design and scouting New well pad locations during site visits to Iraq, (Working from Dubai office then site based in WQ2, Iraq during construction
  • Roles of management and Construction Supervision in BASRA oil fields
  • Scope included managing execution contractor for piling foundation construction, Access approach roads
  • Construction, mud pit and cellar pit construction, manifold installation after wells are bored, hook ups to filtration systems and installation of above and below ground
  • Piping systems, including security perimeter installation
  • Provided demining reports and seismic reports to contractors prior to site construction execution
  • Daily interaction and follow-up with contractor counterpart on various site locations within security perimeter and outside of the security zone
  • Reporting millstones and impact delays to Management in Dubai through Daily reports and weekly Progress Video conference
  • Verification and compliance checking to standards and specifications as set out in project deliverables
  • Ensure achieving schedule milestones as per Contractual agreed Scope of Work Contract
  • Reading and understanding the SOW and ensuring Contractor understands his deliverables
  • Managed a four-man LUKOIL Site Execution team of HSSE, Civil Engineer, and QC & Piping Engineer to ensure Contactor execution work is smoothly executed and roadblocks are speedily removed whilst driving field execution SOW
  • Ensuring endorsement of reports is done by Civil Engineer for IGCC Topographical and Geotechnical surveys of proposed well pads and ensure reports are transmitted to Engineering Team for Feed and Detailed design
  • Managed the job site safety program when HSSE Officer resigned and acted in dual role overseeing Construction and Safety execution
  • Including weekly safety meetings and Safety policing during shifts
  • Review of contractor performance and providing constructability advice
  • Follow and conduct quality inspections during and at completion of work
  • Ensure all project and construction procedures are administered and being followed and provided commissioning assistance during PSSR
  • Ensure that drawings are as per As- Built Conditions in final handover packages
  • Oversee and manage new piping hook ups to new well manifolds from live systems
  • Oversee installation of mechanical equipment and piping as per Project Requirements
  • Ensure construction of well pads from barren ground and ensure Surveyors benchmarks and elevations are adhered to with construction execution
  • Supervising work on road construction
  • Coordinate engineering, design/construction issues to ensure detailed design and modifications are done in accordance with required project standards.

Construction Superintendent

Lukoil Mid East
10.2014 - 11.2015
  • Iraq, YAMAMA Project/Water Injection and Gathering System Project- WEST QURNA-2 (Iraq)
  • Daily interaction and follow-up with contractor counterpart
  • Ensure achieving schedule milestones as per the signed and agreed Scope of Work contracts
  • Managing construction execution and reporting back to Project Management
  • Manages the job site safety program, including safety walk-thus, highlighting areas of concern regarding site HSSE and ensuring site is presented in safe clean state and all workers are complying to Safety Program
  • Follow and conduct quality inspections during and at completion of work
  • Ensure all project and construction procedures are administered and being followed
  • Ensure the construction contractor complies with the agreed scope of work
  • Provide field and commissioning co-ordination for construction, as required
  • Ensure that drawings are as per As- Built Conditions in final handover packages
  • Oversee and manage piping hook ups to new well manifolds from live systems
  • Oversee installation of mechanical equipment and piping as per Project Requirements
  • Ensure construction of well pads from barren ground and ensure Surveyors benchmarks and elevations are adhered to with construction execution
  • Supervising work on road construction

PMC Project Engineer

Worley Parsons, Abu Dhabi
11.2014 - 06.2015
  • Fertil-2-Ammonia-, Expansion Project Industry:
  • Oversee Project Field execution of structures, piping, mechanical static and rotating equipment, U/G & A/G piping systems and civil buildings, sub stations, tanks warehouses, plant roads, spill dams, sea water piping and conveyor structures, with new ship loaders including new pier construction
  • Progress measurement verification and reporting into monthly report
  • Ensure inspection is carried out and repair procedures issued with Technical Queries/Site Instructions
  • Agreed schedule times
  • Liaise with planning and Inspection to release Inspection advice regarding discovery scope for all off-site work
  • Design clash investigation and resolution
  • Asbestos removal/discarding as per regulation of old conveyor structures and dismantling and removal of 2 old ship loaders
  • Sea water intake, routing and outfall construction
  • Constant follow up with procurement on static and long lead item deliverables and maintaining inspection checks on laid up equipment stored on site
  • Systems completion walk downs and punching
  • Pre commissioning support and data pack review
  • Hook up of Conveyor, fire water and process/utility lines, electrical substation and instruments hook ups to old existing plant
  • Construction and kitting of new Operations Control room and ensuring functionality checks of electrical and instruments were performed during pre-commissioning phase
  • Attended weekly management schedule deliverable meetings
  • Reviewed MOC/PCR changes and ensured P&ID`s and EFD, Line diagrams and loop drawings are marked up and updated
  • Daily site interaction with execution contractor
  • Ensure civil works are executed as per design standards and specifications.

Construction Engineer

LUKOIL Mid-East
10.2014 - 11.2014
  • A.E
  • YAMAMA Project, Project Site Superintendent in WQ2 IRAQ
  • Pre-Feed and Feed design input & Construction Site Execution
  • Review/interpret engineering drawings, specifications and other design documents; understand project design basis and contractual requirements
  • Develop construction specifications, scope of work, estimates
  • Prepare construction work packages
  • Write daily and weekly construction reports and submit to

Project Engineer

Worley Parsons
01.2012 - 03.2013
  • For ADNOC on FERTILE AMMONIA UREA Plant Expansion
  • In Ruwais, UAE
  • General Craft Superintendent Turnaround and plant maintenance
  • Civil, Structural, Mechanical, Piping., .A.E
  • FERTIL2 AMMONIA / UREA EXSPANSION PROJECT-
  • Oversee Contractor Samsung Engineering construction activities for all disciplines
  • Liaise with PMT and advise on Construction deliverable schedule
  • Review and approve Method Statements on Construction execution task
  • Facilitate all construction filed engineering and site queries
  • Attending meetings and providing feedback on Project execution
  • Liaise with commissioning to ensure systems hand over completion
  • Ensure that Project specifications are adhered to
  • Manpower loading and monitoring
  • Ensure HSE policies are conformed to and drive Safety awareness
  • Site observation checks to ensure that task is carried out as per schedule
  • Verify Material Orders and confirm material delivery dates
  • Coordinate with various team leaders to ensure interface tasks are completed as per hand over schedule and work off Construction and Client Punch list
  • Ensure Clean Construction Procedures are adhered to by Contractors.

Maintenance craft superintendent

FLUOR IGODA
11.2008 - 01.2012
  • (PTY) LTD
  • Sites Managed include Engen Refinery, Transnet crude terminals in Durban & Tarlton and Shell Petroleum Storage Depot in Kroonstad
  • Maintenance Site management of Sub-Contractors executing Project SOW in Live Plants
  • Coordinate all Project Safety civil, mechanical, piping and E&I work
  • Manage and coordinate TPL and TNPA site interfaces/ permits as well as 3rd party interfaces
  • Conduct daily/weekly Construction progress meetings
  • Liaise progress schedule and impact delays between Contractor and Client
  • Plan and manage mini shutdowns with Transnet Operations during crude switch overs
  • Manage civil excavations and ensure construction of new slabs/bunds and structures
  • Review Planning schedule of Main Contractor and proposing task efficiency
  • Compile quality data packs with Contractor and perform quality checks on piping and civil works before submission to Client
  • Assurance that all piping hot work is executed to approved AFC drawings and maintaining drawing
  • Facilitate all Construction field engineering and site queries with Contractor and Client
  • Ensure project delivered and handed over within specified schedule.

Construction Manager

05.2007 - 07.2008
  • For his report
  • Review heavy lift plans with Rigging Specialist
  • Constructability Reviews and input
  • Identify construction risks and develop plans to eliminate/mitigate risks
  • Site visits to establish benchmarks for Construction Civil works
  • Assist with Site readiness review for Civil execution contractors executing Well Pad and access road construction
  • First Team of LUKOIL YAMAMA Project sent to IRAQ to Site Establish and Construct 4 Well Pads and access roads in green field area (Team worked on rotation 28/28 and consisted of 1 Project Team Lead(myself) 1 x Quality, 1 x HSSE, 1 X Civil Leads per shift
  • Managed civil contractor with building roads and boring and piling piles for well head systems., Project Utilities and Offsite QA/QC, for mechanical, piping & Civil execution with FLUOR ARABIA, @ YANSAB
  • Manage and control all subcontractor QA/QC inspection/construction in Utilities and Off-site work area
  • Ensure project standards and specifications are adhered to and work is executed within specification
  • Oversee the civil construction of all underground sewers, equipment bases and bund walling
  • Oversee and manage the installation of mechanical equipment and piping
  • Ensure all works is executed in accordance with approved QCP’s
  • Witness hydro testing for Client
  • QC checks and butt listing of all works (Rectify and fix all outstanding punch list defects)
  • Carry out random consumable control and visual inspection of completed welds before NDT
  • Review and approve contractor work / test packages
  • Ensure welding compliance with WPS
  • Assisted with commissioning and handover
  • Managed Quality Control on all civil works and ensured that work was executed as per specification requirements.

Site Superintendent

Sishen opencast mine for TUBULAR CONSTRUCTION
01.2007 - 05.2007
  • Coordinate work activities of all involved crafts, mechanical, piping civil and structural, during construction
  • Monitor construction activities to ensure work efficiency, quality and safety workmanship meets project standards and specifications
  • Review work assignment with field staff in safe work execution
  • Ensure all understand the cost implications generated if the schedule is not met
  • Coordinate material delivery to work area
  • Ensure clean construction execution is delivered
  • Managed all construction activities including civil and structural work

Maintenance & Project QC inspector

Gabon
01.2006 - 07.2006
  • For FRIEDLANDER
  • Review PQR, WPS, and NDE procedures and ensure work is executed within the listed parameters
  • Dimensional checks, NDE as per line class, witness hydro test, witness flushing and blowing of piping systems
  • Reinstatement of lines post hydro and ensuring work is completed as per punch list
  • Ensure that all civil work was executed as per schedule and in project compliance
  • Verified Underground piping backfilling is correct with appropriate subgrade and compaction test are within spec
  • Data Pack Compilation and Handover to Client.

Mechanical Field Engineer

Turnaround, YANPET for FLUOR ARABIA LTD
04.2005 - 12.2005
  • With GLTA
  • SAPREF-SHELL Refinery in South Africa
  • Live Plant maintenance
  • 30 years’ Turnaround and Project execution experience in (Brown and Greenfields) oil and gas environment and my experience compasses working as Contractor, Main Contractor, PMT/PMC and for client with Lukoil driving Construction and Maintenance completion
  • Fully Safety conversant and ensuring Safe Work Practices/ Safety Plans and Permit to Work Conditions (PTW) are understood/adhered to and work executed accordingly complying with PTW conditions
  • Onsite experience hands on work
  • Involved in various aspects of construction, maintenance and Turnarounds and pre-commissioning and commissioning
  • Of sub systems and Systems, Coordinating and punching completed Systems with Client Operations and Integrity Team
  • Management Team overseeing Contractor construction execution and ensuring punch list items are worked off and systems completion task are executed
  • Extensive range of experience in the Petrochemical, oil, gas, power stations, paper mills, shipbuilding and food & Beverage industries (Live Plant Maintenance and New Projects)
  • Extensive knowledge of the welding codes and ASME procedures, Site Instructions and Technical Queries that require prompt resolution
  • Workshop pipe fabrication experienced with field erection on Site experienced
  • Oversee coordination with NDT, Hydro testing, Reinstatement and Punching and commissioning of piping systems, as per approved Drawings & P&ID`s
  • Welding knowledge of welding/consumable control with various materials as per approved PQR & WPS required in the Petro-chemical, power station and paper mills, i.e., chrome molly piping, duplex materials, carbon steels and stainless steels from material receiving as per Bill of Material, Heat Number transferring and Quality conformity and assurance in Construction
  • Experience in civil, painting and insulation (cold and hot) including structural fabrication and erection of pipe racks after foundation release, pipe support installation, spill dam HDPE lining installation and construction of roads and underground piping Systems
  • Mechanical knowledge and experience with execution on planned Turnaround activities
  • Discovery works and Management of Change procedures, Box up and Flange Management to approved Bolt Torquing and Tensioning Procedures
  • Progress reporting and updating planners
  • Pre-commissioning and Commissioning of piping and mechanical systems (sub systems) to meet plant start up milestones
  • Compilation and review of Data Packs for Client review and approval
  • Work pack completion coordination and follow up in ensuring Punch list items are categorized and worked off to ensure system hand over
  • 1
  • Off-site Services Coordinator for valves to be refurbished and delivered on site within specified time., Quality assurance and assuring that Project Flange Management Procedure is rolled out to MC and compliance to procedure is adhered to
  • Ensured Flange Joints are boxed up and documented as per procedure to ensure Leak Free Start Up., Quality assurance and assuring that Project Flange Management Procedure is rolled out to MC and compliance to procedure is adhered to
  • Ensured Flange Joints are boxed up and documented as per procedure to ensure Leak Free Start Up.

QC/QA Manager

FLUOR SOUTH AFRICA Project TURBO
04.2005 - 12.2005
  • Quality assurance and control MEIP & Civil & Structural
  • Reviewing Contractor Hand Over Quality Packs and Hand over to Client
  • Managing interface piping tie inns on live systems.

Maintenance Piping supervisor

SAPREF for LTA GRINAKER
09.2004 - 11.2004

Fabrication Workshop QC Inspector

MURRAY & ROBERTS
07.2004 - 09.2004
  • Quality control inspection and control during pre- fabrication of structural and piping.

Maintenance Service coordinator

FLUOR O & M
05.2004 - 06.2004

Maintenance piping/hydrotesting Supervisor

SAPREF for FRASER & CHALMERS
03.2004 - 06.2004

plant Maintenance Supervisor

03.2004 - 06.2004

plant Maintenance Supervisor

04.2003 - 05.2003

Foreman piping, testing supervisor/ supervisor

FRASER & CHALMERS
01.2003 - 01.2003

Coordinator

10.2002 - 11.2002

Maintenance Mechanical field engineer

SAPREF
01.2002 - 09.2002
  • Fluor Projects with FRASER & CHALMERS
  • Field engineering resolution to field queries during project and Turnaround

QC Inspector

GENREC
09.2001 - 12.2001
  • Quality control of prefabrication of piping, painting of spools.

Service coordinator

FLUOR GLOBAL SERVICE
01.2000 - 03.2000

Coordinator

04.1999 - 11.1999

Pipe fitter

CHASWILLIS ENGINEERING, Pipe
03.1998 - 07.1999

Coordinator

QC, GENREC
09.1998 - 04.1999

Piping Charge hand

SALDANHA STEEL
10.1997 - 03.1998

QC

M.E.I. DURBAN WORKSHOP
01.1995 - 01.1996
  • Quality control of Isometric piping fabrication.

Pipe fitter

FRASER & CHALMERS
03.1994 - 08.1994

Charge hand

CHASWILL
02.1993 - 08.1993
  • ENGINEERING
  • Piping installation

Material controller

B.M.B.C Mossgas
12.1991 - 02.1992

Material Controller

Allan Vick Construction - JCI SAREF - RUSTENBURG
04.1989 - 12.1991

Supervisor •Material controller

01.1988 - 03.1989

Material Controller

05.1985 - 10.1987

Trainee pipe fitter

Rifleman section 21
05.1985 - 10.1987
  • C, SOUTH AFRICAN DEFENCE FORCE
  • Rifleman

Trainee fitter

TEFKON SASOL 2
01.1983 - 03.1985

Education

Matric -

Bechet High School

Project Management Diploma - Construction Project Management

Varsity College
Durban, South Africa
01.2010 - 12.2010

Construction Management

Flour
Durban
02-2009

Skills

Construction scheduling

Site safety management

Subcontractor supervision

Construction materials

Construction management

Personal Information

Nationality: South African

Additional Information

• Attended various NOSA Safety Courses

• Pipe Fitting Course

• Supervision and Construction Management Essentials Course with Fluor.

• NACE Coating’s Course with Jim Hoare (Fluor QA )

• First Line Management (Fluor)

• MS Office

• Project Management Diploma 2010. Varsity College

• NEIBOSH International Diploma in Occupational Health and Safety. Enrolled March 2015.

Timeline

Hot Work Superintendent

KOEBERG Nuclear Power Station
03.2023 - 07.2024

Construction Area Superintendent

Fluor/ VOPAK
02.2020 - 12.2020

Construction Area Project Superintendent, Turnaround Coordinator

SAPREF Refinery, DURBAN, GAS
08.2018 - 07.2019

Area Superintendent

Shell Pearl Turnaround
01.2018 - 03.2018

Subcontracts Coordinator

SHELL Refinery Durban
01.2017 - 05.2017

Project Superintendent

SNC LAVALIN
06.2016 - 11.2016

PMC Project Engineer

Worley Parsons, Abu Dhabi
11.2014 - 06.2015

Construction Superintendent

Lukoil Mid East
10.2014 - 11.2015

Construction Engineer

LUKOIL Mid-East
10.2014 - 11.2014

Project Superintendent

Lukoil Overseas
10.2013 - 12.2015

Project Engineer

Worley Parsons
01.2012 - 03.2013

Project Management Diploma - Construction Project Management

Varsity College
01.2010 - 12.2010

Senior Construction Execution Specialist

Worley @ ASTRON Refinery
12.2009 - 07.2022

Maintenance craft superintendent

FLUOR IGODA
11.2008 - 01.2012

Construction Manager

05.2007 - 07.2008

Site Superintendent

Sishen opencast mine for TUBULAR CONSTRUCTION
01.2007 - 05.2007

Maintenance & Project QC inspector

Gabon
01.2006 - 07.2006

Mechanical Field Engineer

Turnaround, YANPET for FLUOR ARABIA LTD
04.2005 - 12.2005

QC/QA Manager

FLUOR SOUTH AFRICA Project TURBO
04.2005 - 12.2005

Maintenance Piping supervisor

SAPREF for LTA GRINAKER
09.2004 - 11.2004

Fabrication Workshop QC Inspector

MURRAY & ROBERTS
07.2004 - 09.2004

Maintenance Service coordinator

FLUOR O & M
05.2004 - 06.2004

Maintenance piping/hydrotesting Supervisor

SAPREF for FRASER & CHALMERS
03.2004 - 06.2004

plant Maintenance Supervisor

03.2004 - 06.2004

plant Maintenance Supervisor

04.2003 - 05.2003

Foreman piping, testing supervisor/ supervisor

FRASER & CHALMERS
01.2003 - 01.2003

Coordinator

10.2002 - 11.2002

Maintenance Mechanical field engineer

SAPREF
01.2002 - 09.2002

QC Inspector

GENREC
09.2001 - 12.2001

Service coordinator

FLUOR GLOBAL SERVICE
01.2000 - 03.2000

Coordinator

04.1999 - 11.1999

Coordinator

QC, GENREC
09.1998 - 04.1999

Pipe fitter

CHASWILLIS ENGINEERING, Pipe
03.1998 - 07.1999

Piping Charge hand

SALDANHA STEEL
10.1997 - 03.1998

QC

M.E.I. DURBAN WORKSHOP
01.1995 - 01.1996

Shutdown Area Supervisor, •Supervisor

09.1994

Pipe fitter

FRASER & CHALMERS
03.1994 - 08.1994

Charge hand

CHASWILL
02.1993 - 08.1993

Material controller

B.M.B.C Mossgas
12.1991 - 02.1992

Material Controller

Allan Vick Construction - JCI SAREF - RUSTENBURG
04.1989 - 12.1991

Supervisor •Material controller

01.1988 - 03.1989

Material Controller

05.1985 - 10.1987

Trainee pipe fitter

Rifleman section 21
05.1985 - 10.1987

Trainee fitter

TEFKON SASOL 2
01.1983 - 03.1985

QA/QC Inspector/ Manager

Maintenance Site superintendent

FLUOR GLOBAL SERVICE

Shutdown Supervisor

ISM INTERNATIONAL

Maintenance Fitter then supervisor

Project Construction Superintendent

Lukoil

Piping Supervisor

Shell Oil

Shutdown Services Coordinator

ENGEN for FLUOR GLOBAL SERVICE

Shutdown Services Coordinator

FLUOR DANIEL

Offshore Piping Foreman

INTERSHORE

Hydro Test Supervisor

BABCOCK, Mossgas, Module Construction

Matric -

Bechet High School

Construction Management

Flour
Allen MarnitzConstruction Manager /Superintendent